Army Department September 25, 2009 – Federal Register Recent Federal Regulation Documents

Notice of Availability for the Final Environmental Impact Statement/Environmental Impact Report and a Draft General Conformity Determination for the San Pedro Waterfront Project, Port of Los Angeles, Los Angeles County, CA
Document Number: E9-23235
Type: Notice
Date: 2009-09-25
Agency: Department of Defense, Department of the Army, Corps of Engineers, Engineers Corps, Army Department
On September 22, 2008, the U.S. Army Corps of Engineers, Los Angeles District, Regulatory Division (Corps) in coordination with the Los Angeles Harbor Department (LAHD) completed and published the Draft Environmental Impact Statement/Environmental Impact Report (EIS/EIR) for the San Pedro Waterfront Project (Project) in the Port of Los Angeles. The Corps and LAHD considered all comments received in preparing the Final EIS/EIR, which is available for a 30-day review. The Final EIS/ EIR includes a draft general conformity determination (see Section 3.2 and Appendix D.7), pursuant to Section 176(c) of the Clean Air Act. A general conformity determination is necessary because Project construction would require Federal action (i.e., issuance of a Corps permit for activities proposed in and over navigable waters and waters of the U.S.) and not all the Federal action's direct and indirect emissions would be below specified de minimis thresholds (40 CFR 93.153(b)). Pursuant to the general conformity regulations (40 CFR part 93, subpart B), general conformity determinations do not have to be included in the EIS and can be separately noticed, but the draft general conformity determination for the Federal action associated with the Project is being included in the Final EIS/EIR in this case.
Army Educational Advisory Committee
Document Number: E9-23175
Type: Notice
Date: 2009-09-25
Agency: Department of Defense, Department of the Army, Army Department
Pursuant to the Federal Advisory Committee Act of 1972 (5 U.S.C., Appendix, as amended), the Sunshine in the Government Act of 1976 (5 U.S.C. 552b, as amended), and 41 CFR 102-3.150, the following meeting notice is announced:
Publication of Revision and Consolidation of Military Freight Traffic Rules Publications (MFTRP) 1C-R (Motor), 10 (Rail), 30 (Barge), 6A (Pipeline), 4A (Tank Truck), Military Standard Tender Instruction Publication (MSTIP) 364D, SpotBid Business Rules, and SDDC Military Class Rate Publication No. 100A to a Consolidation of Procurement Requirements for the Purchase of Commercial Transportation Services into the Military Freight Traffic Unified Rules Publication (MFTURP) NO. 1
Document Number: E9-23174
Type: Notice
Date: 2009-09-25
Agency: Department of Defense, Department of the Army, Army Department
In a notice published in the Federal Register on June 9, 2009, (74 FR 27294), comments received from various entities were erroneously omitted. To correct, the remaining comments will be listed below with responses from SDDC. Additionally, a notice published in the Federal Register on July 10, 2009, (74, FR 33219) indicated the effective date was no longer July 9, 2009 and that a new effective date would be announced at a later date. The new effective date is listed below.
Intent To Prepare an Environmental Impact Statement for Pine Mountain Dam, Arkansas, General Reevaluation Report
Document Number: E9-23172
Type: Notice
Date: 2009-09-25
Agency: Department of Defense, Department of the Army, Corps of Engineers, Engineers Corps, Army Department
Pursuant to the National Environmental Policy Act (NEPA), the U.S. Army Corps of Engineers (USACE), Little Rock District will prepare an Environmental Impact Statement (EIS) for the Pine Mountain Dam, Arkansas, General Reevaluation Report.
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.