Army Department 2008 – Federal Register Recent Federal Regulation Documents
Results 151 - 200 of 235
Notice of Availability of the Draft Environmental Impact Statement for the Proposed Stormwater Treatment Areas in Everglades Agricultural Area Located in Palm Beach and Hendry Counties, FL
The U.S. Army Corps of Engineers (USACE) is issuing this notice to advise the public that a Draft Environmental Impact Statement (Draft EIS) has been completed and is available for review and comment.
Notice of Availability for the Draft Supplemental Environmental Impact Statement/Subsequent Environmental Impact Report for the Pacific L.A. Marine Terminal LLC Crude Oil Terminal Project, Los Angeles County, CA
The U.S. Army Corps of Engineers, Los Angeles District (Regulatory Division), in coordination with the Port of Los Angeles, has completed a Draft Supplemental Environmental Impact Statement/ Subsequent Environmental Impact Report (SEIS/SEIR) for the Pacific L.A. Marine Terminal LLC Crude Oil Terminal Project. The Port of Los Angeles requires authorization pursuant to Section 404 of the Clean Water Act and Section 10 of the River and Harbor Act for a new crude oil marine terminal at Berth 408 on Pier 400 including: Construction of a new marine terminal to receive crude oil from marine vessels and transfer the oil to tank farm facilities via a new 42-inch-diameter, high-volume pipeline; construction of two tank farms, Tank Farm Site 1 located on Pier 400 and Tank Farm Site 2 located on Pier 300 at Seaside Avenue/ Terminal Way; construction of new pipelines to connect the new tank farm facilities to existing pipeline facilities, with the new tank farm facilities connected to the existing ExxonMobil Southwest Terminal on Terminal Island, the existing Ultramar/Valero Refinery on Anaheim Street near the Terminal Island Freeway, and to Plains All American pipeline systems near Henry Ford Avenue and Alameda Street via new and existing 36-inch, 24-inch, and 16-inch pipelines, and with all new pipelines installed belowground, with the exception of the water crossings at the Pier 400 causeway bridge and at the Valero utility/pipe bridge that crosses the Dominguez Channel west of the Ultramar/Valero Refinery. The new tank farm facilities would provide a total of 4.0 million barrels (bbl) of capacity, primarily receiving crude oil, partially refined crude oil, and occasional deliveries of Marine Gas Oil (MGO).
Privacy Act of 1974; System of Records
The Department of the Army is proposing to add a system of records to its existing inventory of records systems subject to the Privacy Act of 1974, (5 U.S.C. 552a), as amended.
Board of Visitors, Defense Language Institute Foreign Language Center
In accordance with Section 10(a)(2) of the Federal Advisory Committee Act (Pub. L. 92-463), announcement is made of the following committee meeting:
Notice of Intent To Prepare a Draft Environmental Impact Statement for Carolinas Cement Company LLC Castle Hayne Project in New Hanover County, NC
The U.S. Army Corps of Engineers (COE), Wilmington District, Wilmington Regulatory Division has received a request for Department of the Army authorization, pursuant to Section 404 of the Clean Water Act and Section 10 of the Rivers and Harbors Act, from Carolinas Cement Company LLC (a subsidiary of Titan America LLC) to construct the Carolinas Cement Company LLC Castle Hayne Project. This project will include quarrying to support cement manufacturing in northern New Hanover County, NC. The proposed project will require the excavation of an open pit adjacent to the Northeast Cape Fear River in order to extract and process the raw materials (calcium carbonate and limestone) in order to produce Portland Cement. Existing infrastructure including railroad, interstate highway, and waterways allow for both the shipment of product from the plant and the receipt of materials, such as coal. The Castle Hayne site is the location of former cement manufacturing facility and an unrelated, active aggregate quarry.
Notice of Availability of the Final Environmental Impact Statement (FEIS) for the Proposed Potash Corporation of Saskatchewan Phosphate Mine Continuation Near Aurora, in Beaufort County, NC
The U.S. Army Corps of Engineers (COE), Wilmington District, Regulatory Division has been reviewing the request for Department of the Army authorization, pursuant to Section 404 of the Clean Water Act and Section 10 of the Rivers and Harbor Act, from Potash Corporation of Saskatchewan Phosphate Division (PCS) for the continuation of its phosphate mining operation near Aurora, Beaufort County, NC. PCS proposes to undertake an approximately 11,909 acre mine expansion into an approximately 15,100 acre project area surrounding its current mining operation. This expansion would occur over a 37 year period and would impact approximately 4,135 acres of waters of the United States including wetlands adjacent to The Pamlico River, South Creek and Durham Creek. The Notice of Availability of the Draft Environmental Impact Statement (DEIS) for this action was published in the Federal Register on Friday, October 20, 2006 (71 FR 61962). The Notice of Availability of Supplement I of the DEIS (SDEIS) was published in the Federal Register on Tuesday, November 6, 2007 (72 FR 62634).
Intent To Hold an Open Meeting of the North Dakota River Task Force Established by the Missouri River Protection and Improvement Act of 2000 (Title VII)
The duties of the Task Force are to prepare and approve a plan for the use of the funds made available under Title VII to promote conservation practices in the Missouri River watershed, control and remove the sediment from the Missouri River, protect recreation on the Missouri River from sedimentation, and protect Indian and non-Indian historical and cultural sites along the Missouri River from erosion.
Notice of Availability of the Draft Supplemental Programmatic Environmental Impact Statement for Army Growth and Force Structure Realignment To Support Operations in the Pacific Theater
The Department of the Army announces the availability of a Draft Supplemental Programmatic Environmental Impact Statement (DSPEIS) for the growth and realignment of the United States Army to support Operations in the Pacific Theater. The Department of the Army has prepared a DSPEIS that evaluates the potential environmental and socioeconomic effects associated with alternatives for implementing the growth, realignment, and transformation of the Army's forces to support Operations in the Pacific Theater. Potential impacts have been analyzed in the DSPEIS at installations that are capable of supporting operations in the Pacific Theater.
Programmatic Regulations for the Comprehensive Everglades Restoration Plan
The Army has initiated a review of the programmatic regulations for the Comprehensive Everglades Restoration Plan required by section 601(h)(3)(E) of the Water Resources Development Act of 2000. As part of scoping the review for the regulations, the public is invited to provide comments on this review. Specifically, we welcome your comments on issues concerning the programmatic regulations, any items in the regulations that should be reviewed, or suggestions to improve the programmatic regulations.
Notice of Availability for the Draft Environmental Impact Statement/Environmental Impact Report for the Middle Harbor Redevelopment Project of the Port of Long Beach, Los Angeles County, CA
The U.S. Army Corps of Engineers, Los Angeles District (Corps) in coordination with the Port of Long Beach has completed a Draft Environmental Impact Statement/ Environmental Impact Report (EIS/EIR) for the Middle Harbor Redevelopment project in the Port of Long Beach. The Corps is considering an application for Section 404 and Section 10 permits to conduct dredge and fill activities associated with the proposed consolidation of Piers D, E and F into a single 345-acre marine terminal with a 4,250-foot-long wharf at build-out. This would include redevelopment of 294 acres of existing land, creation of 10.7 acres of new open water and the placement of dredged material in 65.3 acres open water for a net gain of approximately 54.6 acres of new land in the consolidated terminal. The new terminal, which would be constructed over a 10-year time period, is intended to accommodate increasing cargo volumes being produced by the new generation of larger container vessels, and would include four deep-water berths, a container terminal yard, and an intermodal rail yard.
Availability of Non-Exclusive, Exclusive License or Partially Exclusive Licensing of U.S. Patent Concerning “Article of Footwear with Temperature Regulation Means”
In accordance with 37 CFR 404.6, announcement is made of the availability for licensing of U.S. Patent No. U.S. 7,344,751 entitled ``Article of Footwear with Temperature Regulation Means'' issued April 29, 2008. This patent has been assigned to the United States Government as represented by the Secretary of the Army.
Intent To Prepare a Draft Environmental Impact Statement for the Expansion of an Existing Sand and Aggregate Mining Operation Proposed by Aggregate Industries in a Backwater Area of the Mississippi River in Cottage Grove, MN
Aggregate Industries is proposing a project that will require a St. Paul District, Corps of Engineers (Corps) permit for excavation within a navigable water and to discharge dredged material into waters and wetlands during an aggregate mining operation. Specifically, Aggregate Industries is proposing to dredge and excavate sand and gravel in approximately 230 acres of backwater area adjacent to the main channel of the Mississippi River. A berm would be constructed in the river upstream of the mine area to minimize current velocity in the mining area and to reduce turbidity. Sand and gravel would be excavated using a clamshell-type dredge to a maximum depth of approximately 200 feet. Dredged material would be transported via a conveyor system from the dredge to an existing sand and gravel processing plant located on Grey Cloud Island. Excess sand not used for berm construction would be returned to the mined area. A specific compensatory mitigation plan has not yet been developed for the project. Aggregate Industries intends to work with interested federal and state agencies to develop an acceptable plan that would meet federal and state compensatory mitigation requirements. The project requires Corps of Engineers approval under Section 10 of the Rivers and Harbors Act of 1899 and under Section 404 of the Clean Water Act. The final environmental impact statement will be used as a basis for the permit decision and to ensure compliance with the National Environmental Policy Act (NEPA).
Notice of Availability for the Recirculated Draft Environmental Impact Statement/Environmental Impact Report for the Berths 97-109 [China Shipping] Container Terminal Project, Los Angeles County, CA
The U.S. Army Corps of Engineers, Los Angeles District (Regulatory Division), in coordination with the Port of Los Angeles, has completed and is re-circulating the Draft Environmental Impact Statement/Environmental Impact Report (EIS/EIR) for the Berths 97-109 [China Shipping] Container Terminal Project. The Port of Los Angeles requires authorization pursuant to Section 404 of the Clean Water Act and Section 10 of the River and Harbor Act to construct new wharves at Berths 100 and 102; dredge (41,000 cubic yards [yd3] of sediments) and dispose of that material at the upland Port Anchorage Road Disposal Site; develop backlands, including construction of terminal buildings, on 142 acres; install 10 new A-frame cranes at Berths 100 and 102; construct transportation infrastructure improvements in the vicinity of the existing terminal entrance (shared by the Berths 97-109 terminal and the Berths 121-131 terminal); construct two new bridge structures connecting Berths 97-109 terminal and Berths 121-131 terminal across the Southwest Slip; and relocate the Catalina Terminal to south of the Vincent Thomas Bridge at Berth 95.
Economic and Environmental Principles and Guidelines for Water and Related Land Resources Implementation Studies; Initiation of Revision and Request for Suggested Changes
Section 2031 of the Water Resources Development Act of 2007 (Pub. L. 110-114) directs the Secretary of the Army to revise the ``Economic and Environmental Principles and Guidelines for Water and Related Land Resources Implementation Studies'', dated March 10, 1983 consistent with a number of considerations enumerated in the statute. Upon completion the revision will apply to water resources projects, project reevaluations, or project modifications and project feasibility studies carried out by the Secretary except those commenced prior to the completion of the revised guidance. The Secretary intends to craft the revision in two phases, with the first phase of this revision to address revisions to the 1983 Principles and Standards (Chapter I of the existing Guidelines) and the second phase to address revisions to the Procedures (Chapters II through IV of the 1983 Guidelines). The purpose of this notice is to provide opportunity for interested individuals and organizations to submit suggestions for revising the Principles and Standards. Using that input the Secretary intends for the initial draft of the revision to be prepared in June and released for public comments by July.
Availability of Non-Exclusive, Exclusive License or Partially Exclusive Licensing of US Patent Concerning Assembled Hematin, Method for Forming Same and Method for Polymerizing Aromatic Monomers Using Same
In accordance with 37 CFR Part 404.6, announcement is made of the availability for licensing of U.S. Patent No. U.S. 7,358,327 entitled ``Assembled Hematin, Method for Forming Same and Method for Polymerizing Aromatic Monomers Using Same'' issued April 15, 2008. This patent has been assigned to the United States Government as represented by the Secretary of the Army.
Bossier Parish, LA, Flood Risk Management Study
The Vicksburg District Corps of Engineers, in conjunction with the Bossier Levee District, the non-Federal sponsor, are undertaking studies to investigate possible solutions to improve the flood risk management capability of Bayou Bodcau Dam, Bossier Parish, LA.
Cross Lake Water Supply Feasibility Study, Shreveport, LA
The Vicksburg District Corps of Engineers, in conjunction with the City of Shreveport, the non-Federal sponsor, are undertaking studies to investigate the feasibility of water supply improvements for the City of Shreveport and Caddo Parish.
Notice of Availability of Supplemental Draft Environmental Impact Statement for the Proposed Rio del Oro Specific Plan Project, in the City of Rancho Cordova, Sacramento County, CA
Pursuant to the National Environmental Policy Act (NEPA), the U.S. Army Corps of Engineers (USACE), Sacramento District published a notice in the Federal Register on December 8, 2006 (71 FR 71142-71143), informing the public of the availability of the Draft Environmental Impact Statement (DEIS) for the Rio del Oro Specific Plan Project. USACE, Sacramento District has prepared a Supplemental Draft Environmental Impact Statement (SDEIS) in response to new information. It is now available for review and comment. The SDEIS provides new information and additional analyses related to utilities and service systems (specifically, water supply) and biological resources. Like the 2006 DEIS, the SDEIS analyzes the potential effects of implementing each of five alternative scenarios for a mixed-use development in the approximately 3,828-acre Rio del Oro Specific Plan area, in the City of Rancho Cordova, Sacramento County, CA. The alternatives considered in detail in the SDEIS are: (1) Proposed Project/Proposed Action (i.e., Proposed Project Alternative), the Applicants' Preferred Alternative; (2) High Density (Increased Densities Consistent with Sacramento Area Council of Governments Blueprint); (3) Impact Minimization; (4) No Federal Action (No Section 404 of the Clean Water Act Permit); and (5) No Project/No Action (No development).
Notice of Intent To Prepare an Environmental Impact Statement (EIS) for Grow the Army (GTA) Actions at Fort Carson, CO
As part of the GTA effort, the U. S. Army intends to prepare an EIS to analyze the environmental and socioeconomic impacts resulting from the decision to station a new Infantry Brigade Combat Team (IBCT) at Fort Carson. The EIS will also analyze Fort Carson's Butts Army Airfield (BAAF) as a potential location for stationing a Combat Aviation Brigade (CAB) in the future.
Western Hemisphere Institute for Security Cooperation Board of Visitors; Meeting
This notice sets forth the schedule and summary agenda for the summer meeting of the Board of Visitors (BoV) for the Western Hemisphere Institute for Security Cooperation (WHINSEC). Notice of this meeting is required under the Federal Advisory Committee Act (Pub. L. 92-463). The Board's charter was renewed on February 1, 2008 in compliance with the requirements set forth in Title 10 U.S.C. 2166. Date: Thursday, June 5, 2008. Time: 9 a.m. to 3:30 p.m. Location: 2212 Rayburn House Office Building, Washington, DC. Proposed Agenda: The WHINSEC BoV will be briefed on activities at the Institute since the last Board meeting on November 2, 2007 as well as receive other information appropriate to its interests.
Board of Visitors, United States Military Academy (USMA)
Under the provisions of the Federal Advisory Committee Act of 1972 (5 U.S.C., Appendix, as amended), the Government in the Sunshine Act of 1976 (5 U.S.C. 552b, as amended), and 41 CFR 102-3.150, the Department of Defense announces that the following Federal advisory committee meeting will take place: 1. Name of Committee: United States Military Academy Board of Visitors. 2. Date: Wednesday, May 14, 2008. 3. Time: 1 p.m.-4 p.m. Members of the public wishing to attend the meeting will need to show photo identification in order to gain access to the meeting location. All participants are subject to security screening. 4. Location: Senate Russell Office Building, Washington, DC 20515 (exact room location will be published on the USMA Board of Visitors Web site at https://www.usma.edu/bov.asp). 5. Purpose of the Meeting: This is the 2008 Spring Meeting of the USMA Board of Visitors (BoV). Members of the Board will be provided updates on Academy issues. 6. Agenda: The Academy leadership will provide the Board updates on the following: Admissions, The Center of Professional Military Ethics, Capstone Course, FY08 & FY09 Budget and Manpower, Business Transformation, USMA Master Plan, Uniform Code of Military Justice (UCMJ), Accreditation, Residential Communities Initiative (RCI), and Diversity. 7. Public's Accessibility to the Meeting: Pursuant to 5 U.S.C. 552b and 41 CFR 102-3.140 through 102-3.165, and the availability of space, this meeting is open to the public. Seating is on a first-come basis. 8. Committee's Designated Federal Officer or Point of Contact: Ms. Cynthia Kramer, (845) 938-5078, Cynthia.kramer@us.army.mil.
Proposed Collection; Comment Request
In compliance with Section 3506(c)(2)(A) of the Paperwork Reduction Act of 1995, the Department of the Army announces a proposed extension of a public information collection and seeks public comment on the provisions thereof. Comments are invited on: (a) Whether the proposed collection of information is necessary for the proper performance of the functions of the agency, including whether the information shall have practical utility; (b) the accuracy of the agency's estimate of the burden of the proposed information collection; (c) ways to enhance the quality, utility, and clarity of the information to be collected; and (d) ways to minimize the burden of the information collection on respondents, including through the use of automated collection techniques or other forms of information technology.
Intent To Prepare a Supplemental Environmental Impact Statement/Environmental Impact Report (SEIS/EIR) for the Seven Oaks Dam To Implement Measures To Sustain Federally-Listed Species as Identified in the 2002 Biological Opinion Within the Woolly Star Preserve Area in San Bernardino County, CA
The purpose of the study is to develop implementation plans to sustain federally-listed species within the Woolly Star Preserve Area, including the Slender-horned spineflower, San Bernardino Kangaroo Rat, and Santa Ana Woolly Star. As a requirement of the Biological Opinion (2002), for construction and operation of Seven Oaks Dam (SOD), the Corps prepared a Multi-Species Habitat Management Plan (MSHMP) to identify potential management measures and implementation strategies. Recommendations in the Draft MSHMP have been developed in collaboration with the U.S. Fish and Wildlife Service, California Department of Fish and Game, and other stakeholders. The Draft MSHMP identifies non- structural and structural measures. Non-structural measures could include, but are not limited to, herbicide treatment for non-native invasive grass control and providing water to the mitigation area through pipelines or trucks to hydraulically spread sand for substrate enhancement. Structural measures could include, but not limited to, controlled releases from SOD and dikes (permanent and/or temporary) used to direct hydraulic spreading of sand for substrate enhancement. The SEIS/EIR will examine the details of the measures identified above and other feasible alternatives based on hydrological, geotechnical, environmental, and technical factors. Management activities would be conducted within the Woolly Star Preserve Area and other adjacent lands.
Notice of Availability of a Novel UV Emitting Device for Exclusive, Partially Exclusive or Non-Exclusive Licenses
The Department of the Army announces the general availability of exclusive, partially exclusive or non-exclusive licenses relative to a novel ultraviolet light emitting device as described in U.S. Patent Applications 11/376,453, Ultraviolet Light Emitting AlGaN Composition and Ultraviolet Light Emitting Device Containing Same and 11/376,452 Method of Manufacturing an Ultraviolet Light Emitting AlGaN Composition and Ultraviolet Light Emitting Device Containing Same. Any license shall comply with 35 U.S.C. 209 and 37 CFR 404.
Army Science Board Plenary Meeting
Pursuant to the Federal Advisory Committee Act of 1972 (5 U.S.C., Appendix, as amended), the Sunshine in the Government Act of 1976 (U.S.C. 552b, as amended) and 41 Code of the Federal Regulations (CFR 102-3. 140 through 160, the Department of the Army announces the following committee meeting: Name of Committee: Army Science Board (ASB). Date(s) of Meeting: May 20-21, 2008. Time(s) of Meeting: 0800-1700, May 20, 2008-1300-1600, May 21, 2008. Place of Meeting: Minute Maid Park, 6580 Fannin Street, Houston, TX.
Employment of Troops in Aid of Civil Authorities
This action removes 32 CFR Part 501, Employment of Troops in Aid of Civil Authorities. The regulations are being removed because they are obsolete and no longer govern policies for the Department of the Army in planning and operations involving the use of Army resources in the control of actual or anticipated civil disturbances. The program responsibility has been transferred to the Office of the Assistant Secretary of Defense for Homeland Defense.
Relief Assistance
This action removes 32 CFR Part 502, Relief Assistance. The regulations are being removed because they are obsolete and no longer govern policies and procedures for disaster relief activities. The program responsibility has been transferred to the Office of the Assistant Secretary of Defense for Homeland Defense.
Availability of Non-Exclusive, Exclusive License or Partially Exclusive Licensing of U.S. Patent Concerning Assembled Hematin, Method for Forming Same and Method for Polymerizing Aromatic Monomers Using Same
In accordance with 37 CFR 404.6, announcement is made of the availability for licensing of U.S. Patent No. U.S. 7,344,751 entitled ``Assembled Hematin, Method for Forming Same and Method for Polymerizing Aromatic Monomers Using Same'' issued March 18, 2008. This patent has been assigned to the United States Government as represented by the Secretary of the Army.
Availability of Non-Exclusive, Exclusive License or Partially Exclusive Licensing of U.S. Patent Concerning Apparatus and Method To Test Abrasion Resistance of Material Using Airborne Particulate
In accordance with 37 CFR 404.6, announcement is made of the availability for licensing of U.S. Patent No. U.S. 7,347,768 entitled ``Apparatus and Method to Test Abrasion Resistance of Material Using Airborne Particulate'' issued March 25, 2008. This patent has been assigned to the United States Government as represented by the Secretary of the Army.
United States Navy Restricted Area, Menominee River, Marinette Marine Corporation Shipyard, Marinette, WI
The Corps of Engineers is proposing to amend its regulations to establish a restricted area in the Menominee River, at the Marinette Marine Corporation Shipyard, Marinette, Wisconsin, to provide adequate protection for the Littoral Combat Ship (LCS Freedom 1) during its construction. The regulations are necessary to provide adequate protection of the ship, its materials, equipment to be installed therein, and its crew, while it is located at the property of Marinette Marine Corporation.
Intent To Prepare a Draft Environmental Impact Statement (DEIS) for a Proposed Special Area Management Plan for the Otay River Watershed, San Diego County, CA
The U.S. Army Corps of Engineers (Corps of Engineers) is announcing its intent to prepare a Draft Environmental Impact Statement (DEIS) for a Special Area Management Plan (SAMP). The SAMP is being developed to address potential effects of anticipated development, infrastructure, and maintenance projects on aquatic resources in the Otay River Watershed (SAMP study area). The DEIS will assess the impacts of various land development and aquatic resource protection alternatives as set forth below and further identified during the preparation of the SAMP. It is anticipated that the DEIS will be utilized by the local agencies in lieu of an Environmental Impact Report (EIR) pursuant to the California Environmental Quality Act (CEQA). The SAMP will provide a comprehensive plan for protecting and enhancing aquatic resources while providing for the permitting of reasonable economic development and public infrastructure, consistent with the goals and objectives of local land use plans and with the regional Multiple Species Conservation Plan (MSCP) for southwestern San Diego County developed by local governments in collaboration with the U.S. Fish and Wildlife Service and California Department of Fish and Game. The SAMP will provide a framework for a long-term program-level permitting process for projects in the watershed subject to the Corps of Engineers' permit authority under Section 404 of the Clean Water Act (CWA). Section 404 of the CWA regulates the discharge of dredged or fill material into waters of the United States, including wetlands. The SAMP may also be utilized by other agencies in the administration of their regulatory programs, including the California Department of Fish and Game (i.e., Section 1600 et seq. of the Fish and Game Code) and the Regional Water Quality Control Board (i.e., Section 401 of the CWA). In addition, the SAMP will include a comprehensive program involving conservation, restoration, and management of aquatic resources within the study area.
Availability of the Record of Decision (ROD) for the Permanent Stationing of the 2/25th Stryker Brigade Combat Team (SBCT)
The Deputy Chief of Staff of the Army, G-3/5/7 has reviewed the Final Environmental Impact Statement (FEIS) for the Permanent Stationing of the 2/25th SBCT and has made the decision to proceed with all facets of Alternative A. Alternative A permanently stations the 2/ 25th SBCT at Schofield Barracks Military Reservation (SBMR) while conducting the required training at military training sites in Hawaii. This alternative is summarized in the Army's ROD and described fully in Chapter 2 of the FEIS.
Notice of Availability for the Final Environmental Impact Report/ Environmental Impact Statement for the Carryover Storage and San Vicente Dam Raise Project (CSP), San Diego County, CA
Pursuant to section 102(2)(c) of the National Environmental Policy Act (NEPA) of 1969 (as amended), the U.S. Army Corps of Engineers, Los Angeles District (Corps) Regulatory Branch, in coordination with the San Diego County Water Authority (Water Authority), has completed a Final Environmental Impact Report/ Environmental Impact Statement (EIR/EIS) for the Carryover Storage and San Vicente Dam Raise Project (CSP). Four alternatives were co-equally analyzed in the EIR/EIS, including Alternative 1 (100,000 acre-feet of carryover storage at San Vicente), Alternative 2 (100,000 acre-feet of carryover storage at Moosa Canyon), Alternative 3 (50,000 acre-feet of carryover storage at San Vicente and 50,000 acre-feet of carryover storage at Moosa Canyon) and the No Action Alternative, as required by NEPA. As the project proponent and applicant, the Water Authority selected Alternative 1 as its preferred alternative. The proposed CSP requires authorization pursuant to section 404 of the Clean Water Act for approximately 0.34 acre of fill placement in jurisdictional waters of the United States, including wetlands, to construct an expansion of the existing San Vicente Dam to store approximately 100,000 acre-feet of carryover storage water.
Availability of the Draft Feasibility Report and Supplemental Environmental Impact Statement and Draft State Environmental Impact Report for the Boston Harbor Deep Draft Navigation Improvement Project
The U.S. Army Corps of Engineers, New England District in partnership with the Massachusetts Port Authority (Massport) has prepared a joint Draft Supplemental Environmental Impact Statement and State Draft Environmental Impact Report (DSEIS/DEIR) examining improvements to deep-draft navigation channels in Boston Harbor, Boston, MA. Four separate improvements were developed. The first examined deepening the outer and lower harbor's existing 40-foot channel system to provide deeper access to Massport's Conley Terminal in South Boston for containership traffic. All depths are referenced to minus mean lower low water (MLLW). Navigation channel depths of between 45 to 50 feet were examined, with a depth of 48 feet recommended, with an additional two feet in the entrance channel. Under this plan the following project features would be improved: the 40-foot lane of the Broad Sound North Entrance Channel would be deepened to 50 feet and widened through the bend at Finn's Ledge. The 40-foot lane of the Main Ship Channel from the Broad Sound North Entrance Channel upstream through President Roads to the Reserved Channel would be deepened to 48 feet and its 600-foot-wide reaches widened to between 800 and 900 feet, with additional width in the bends. The 40-foot lower reach of Reserved Channel and its turning area would be deepened to 48 feet, with the turning area also widened to 1600 feet. The 40-foot President Roads Anchorage would be deepened to 48 feet. The second improvement would deepen the existing 40-foot lane of the Main Ship Channel from the Reserved Channel Turning Area upstream to just below the Third Harbor Tunnel to a depth of 45 feet, to improve access to the Massport Marine Terminal in South Boston. The third improvement would deepen a portion of the 35-foot Mystic River Channel lane to 40 feet to improve access to Massport's Medford Street Terminal. The fourth and final improvement would deepen the 38-foot Chelsea River Channel to 40 feet, with minor widening in the bridge approaches and the bend between the bridges. In conjunction with work in the Federal channels, the Massachusetts Port Authority would deepen vessel berths at the Conley Terminal and Marine Terminal. Terminals on the Chelsea River would also deepen their berths to match the new channel depth. A total of about 12.1 million cubic yards (cy) of parent material, and 1.2 million cy of rock, would be removed by dredging and placed at the Massachusetts Bay Disposal Site (MBDS). Beneficial use opportunities for the dredged material have been identified and would be considered further during final design of the project. Those beneficial use opportunities include: creation of rock reefs in Massachusetts Bay and Broad Sound, and using the non-rock material as cover at the former Industrial Waste Site, which overlaps the MBDS. This joint Federal and State document builds on the lessons learned from the final EIR/S prepared in June of 1995 for the previous navigation improvement project in Boston Harbor.
Intent To Grant an Exclusive License of a U.S. Government-Owned Patent
In accordance with 35 U.S.C. 209(e) and 37 CFR 404.7(a)(I)(i), announcement is made of the intent to grant an exclusive, royalty- bearing, revocable license to U.S. Patent 6,825,323, filed January 10, 2001, entitled ``Compositions for treatment of hemorrhaging with activated factor VIIa in combination with fibrinogen and methods of using the same'' and foreign rights (PCT/US01/000725) to ProFibrix B.V., with its principal place of business at Zernikedreef 9, 2333 CK Leiden, The Netherlands.
Compensatory Mitigation for Losses of Aquatic Resources
The U.S. Army Corps of Engineers (the Corps) and the Environmental Protection Agency (EPA) are issuing regulations governing compensatory mitigation for activities authorized by permits issued by the Department of the Army. The regulations establish performance standards and criteria for the use of permittee-responsible compensatory mitigation, mitigation banks, and in-lieu programs to improve the quality and success of compensatory mitigation projects for activities authorized by Department of the Army permits. This rule improves the planning, implementation and management of compensatory mitigation projects by emphasizing a watershed approach in selecting compensatory mitigation project locations, requiring measurable, enforceable ecological performance standards and regular monitoring for all types of compensation and specifying the components of a complete compensatory mitigation plan, including assurances of long-term protection of compensation sites, financial assurances, and identification of the parties responsible for specific project tasks. This rule applies equivalent standards to permittee-responsible compensatory mitigation, mitigation banks and in-lieu fee mitigation to the maximum extent practicable. Since a mitigation bank must have an approved mitigation plan and other assurances in place before any of its credits can be used to offset permitted impacts, this rule establishes a preference for the use of mitigation bank credits, which reduces some of the risks and uncertainties associated with compensatory mitigation. This rule also significantly revises the requirements for in-lieu fee programs to address concerns regarding their past performance and equivalency with the standards for mitigation banks and permittee-responsible compensatory mitigation.
Advisory Committee Meeting Notice
In accordance with Section 10(a)(2) of the Federal Advisory Committee Act (Pub. L. 92-463), announcement is made of the following meeting:
Chief of Engineers Environmental Advisory Board
In accordance with Section 10(a)(2) of the Federal Advisory Committee Act (Pub. L. 92-463), announcement is made of the following committee meeting: Name of Committee: Chief of Engineers Environmental Advisory Board (EAB). Topic: The EAB will discuss national considerations related to ecosystem restoration through integrated water resources management with emphasis on communications and the implementation of the Environmental Operating Principles. Date of Meeting: April 30, 2008. Place: Red Lion Hotel, 1415 5th Avenue, Seattle, WA. Time: 9 a.m. to 12 p.m. Forty-five minutes will be set side for public comment. Members of the public who wish to speak are asked to register prior to the start of the meeting. Registration will begin at 8:30. Statements are limited to 3 minutes.
Intent To Prepare an Environmental Impact Statement for the Proposed University of California Merced and University Community Project, Corps Permit Application Number 199900203
The University of California, Merced (University) and University Community Land Company (UCLC) LLC have submitted an application to the U.S. Army Corps of Engineers (Corps) under the Clean Water Act Section 404 and River and Harbor Act Section 10 for a proposal to construct an approximately 810-acre campus and an associated University Community in Merced County. The Proposed Action is located in eastern Merced County, east of Lake Road and Yosemite Lake, approximately 2 miles northeast of the City of Merced, California. The Proposed Action consists of three major components: the 810- acre Campus; the 870-acre Community North; and the 1,245-acre Community South. The University controls the land that comprises the campus. University Community Land Company, LLC (UCLC), a not-for-profit corporation, owns the land that comprises Community North. LWH Farms, LLC owns the land that comprises Community South. The University is currently preparing an amendment to its Long Range Development Plan to guide the development of the proposed campus. The proposed campus and Community North would consist of the following five districts: Academic Core; Gateway District; Student Neighborhoods; University Community Town Center; and University Community Neighborhoods. Community South would be developed in accordance with the previously adopted University Community Plan, which designates the Community South area for Multiple Use Urban Development and agricultural uses. The Campus and the northern portion of the University Community would affect 76.6 acres of the waters of the United States, including vernal pools and other wetlands. The primary federal involvement is the fill materials within waters of the United States, work and structures in affecting navigable waters of the United States, and potential impacts on the human environment from such activities.
Army Educational Advisory Committee
Pursuant to the Federal Advisory Committee Act of 1972 (5 U.S.C., Appendix, as amended), the Sunshine in the Government Act of 1976 (5 U.S.C. 552b, as amended), and 41 CFR 102-3.150, the following meeting notice is announced:
Notice of Cancellation of Intent To Prepare a Draft Environmental Impact Statement for Expansion of the Tampa Harbor (Hilisborough County) FL
The Jacksonville District, U.S. Army Corps of Engineers hereby cancels its Notice of Intent to prepare a Draft Environmental Impact Statement as published in FR, Vol. 66, No. 105, Pages 29557 and 29558, May 31, 2001.
Notice of Intent To Prepare a Draft Environmental Impact Statement (EIS) for the Potable Water Supply for Washington Parish Reservoir, Project
The study area comprises Washington Parish in southeast Louisiana. Washington Parish currently consumes approximately 40 million gallons of water daily, 70 percent of which is supplied by groundwater. Decreasing groundwater levels (quantity) and groundwater quality, in combination with forecasted growth within the Parish require alternative water supplies to be developed. The purpose of the project is to identify a new water supply to address the current and future potable water demands of Washington Parish. The Local Project Sponsor is the Washington Parish Reservoir Commission.
Intent To Prepare an Environmental Impact Statement for the Proposed Sierra Vista Specific Plan Project, Corps Permit Application Number 200601050
The Sierra Vista Landowner Group proposes to implement a large-scale, mixed-use, mixed-density master planned community with residential, commercial, office, public/quasi-public, and open space land uses, and parks. The Sierra Vista Specific Plan would include approximately 1,148 acres of residential uses; 281 acres of commercial, office, and commercial-mixed uses; 162 acres of parks and paseos; 83 acres of public/quasi-public land uses; 31 acres of urban reserve; and 190 acres of roadways and landscape corridors. The Specific Plan would also include 244 acres of open space; of these, 38 acres would be graded as part of the project and the remaining 206 acres would be preservation areas. The Specific Plan would include 9,995 dwelling units (in a mix of low, medium, and high densities) and approximately 2,419,113 square feet of retail and office uses. The project would also provide four elementary schools, one middle school, and a fire station. The proposed project is expected to generate about 25,219 new residents and 5,821 jobs. It is anticipated that construction would begin in spring 2010. The duration of construction would depend on market conditions; full buildout would likely be completed within 20 years from construction commencement. The proposed project site is approximately 2,138 acres and contains 51.87 acres of waters of the United States. The project, as proposed, would result in direct impacts to approximately 37.74 acres of waters of the United States. These acreages do not include indirect impacts from the proposed action or impacts anticipated to result from offsite infrastructure that may be determined to be required as part of the project through the Environmental Impact Statement (EIS) process.
This site is protected by reCAPTCHA and the Google
Privacy Policy and
Terms of Service apply.