Army Department January 17, 2008 – Federal Register Recent Federal Regulation Documents

Intent To Prepare a Draft Environmental Impact Statement for the Construction and Operation of a 300-MW Coal-Fired Electric Generating Unit Proposed by Wisconsin Power and Light Company near Cassville in Grant County, WI
Document Number: E8-819
Type: Notice
Date: 2008-01-17
Agency: Department of Defense, Department of the Army, Corps of Engineers, Engineers Corps, Army Department
Wisconsin Power and Light Company (WPL) has applied to the St. Paul District, Corps of Engineers (Corps) for a permit to conduct work below the ordinary high water mark of the Mississippi River, a navigable water of the U.S., and to discharge dredged or fill material into waters of the U.S. to facilitate the construction and operation of a 300 megawatt (MW) baseload coal-fired electric generating unit, referred to as NED 3, near Cassville in Grant County, WI. Specifically, the WPL is proposing an atmospheric circulating fluidized bed boiler and steam turbine generator unit at a site adjacent to the existing Nelson Dewey Generating Station (NED) Units 1 and 2 on the Mississippi River at River Mile 607.7. In addition to the new power generating unit, the following associated facilities would be constructed and operated: A new lateral collector well to supply cooling water; additional barge unloading capacity including three additional barge moorings in the Mississippi River, a new barge unloading tower foundation, and a temporary equipment barge unloading ramp; a new storm water detention pond and pipe outfall structure; 1.7-mile-long off-site parallel industrial railroad tracks, including a sheet pile retaining wall, adjacent to the existing BNSF railroad mainline tracks; new railroad bridges over two creeks for the off-site parallel industrial railroad tracks; and two new coal pile runoff ponds to replace the existing coal pile runoff pond adjacent to the railroad tracks. The project would require the discharge of dredged or fill material into the Mississippi River and two creeks that are tributaries to the Mississippi River. The Mississippi River is a navigable water of the U.S. The discharge of dredged or fill material into waters of the U.S. requires a permit issued by the Corps under Section 404 of the Clean Water Act. Construction work conducted below the ordinary high water mark of a navigable water of the U.S. requires a permit issued by the Corps under Section 10 of the Rivers and Harbors Act. The final environmental impact statement will be used as a basis for the permit decision and to ensure compliance with the National Environmental Policy Act (NEPA).
Availability for Non-Exclusive, Exclusive, or Partially Exclusive Licensing of U.S. Patent Application Concerning Arthropod Repellent Pharmacophore Models, Compounds Identified as Fitting the Pharmacophore Models, and Methods of Marking and Using Thereof
Document Number: E8-813
Type: Notice
Date: 2008-01-17
Agency: Department of Defense, Department of the Army, Army Department
In accordance with 37 CFR 404.6 and 404.7, announcement is made of the availability for licensing of U.S. Patent Application No. 10/701,565 entitled ``Arthropod Repellent Pharmacophore Models, Compounds Identified as Fitting the Pharmacophore Models, and Methods of Marking and Using Thereof,'' filed November 6, 2003. Foreign rights are also available (PCT/US03/35424). The United States Government, as represented by the Secretary of the Army, has rights in this invention.
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.