Army Department July 12, 2007 – Federal Register Recent Federal Regulation Documents

Availability for Non-Exclusive, Exclusive, or Partially Exclusive Licensing of U.S. Patent Concerning Optical Data Storage
Document Number: 07-3396
Type: Notice
Date: 2007-07-12
Agency: Department of Defense, Department of the Army, Army Department
In accordance with 37 CFR 404.6 and 404.7, announcement is made of the availability for licensing of the invention set forth in U.S. Patent No. 7,016,292 entitled ``Geometry for Optical Data Storage,'' issued on March 21, 2006. The United States Government, as represented by the Secretary of the Army, has rights in this invention.
Availability for Non-Exclusive, Exclusive, or Partially Exclusive Licensing of U.S. Patent Concerning a Real-Time Imaging Spectropolarimeter Based on an Optical Modulator
Document Number: 07-3395
Type: Notice
Date: 2007-07-12
Agency: Department of Defense, Department of the Army, Army Department
In accordance with 37 CFR 404.6 and 404.7, announcement is made of the availability for licensing of the invention set forth in U.S. Patent No. 7,023,546 entitled ``A Real-Time Imaging Spectropolarimeter Based on an Optical Modulator,'' issued on April 4, 2006. The United States Government, as represented by the Secretary of the Army, has rights in this invention.
Intent To Prepare a Draft Supplemental Environmental Impact Statement To Evaluate Construction of Authorized Improvements to the Federal Pascagoula Harbor Navigation Project in Jackson County, MS
Document Number: 07-3393
Type: Notice
Date: 2007-07-12
Agency: Department of Defense, Department of the Army, Corps of Engineers, Army Department
This notice of availability announces the public release of the Draft Supplemental Environmental Impact Statement (DSEIS) to evaluate construction of authorized improvements to the Federal Pascagoula Harbor Navigation Project in Jackson County, MS. The Mobile District, U.S. Army Corps of Engineers (Corps) published in the Federal Register, June 14, 2006, (71 FR 34320) a Notice of Intent to Prepare a DSEIS to address the potential impacts associated with construction of authorized improvements to the Federal Pascagoula Harbor Navigation Project in Jackson County, MS. The DSIES was used as a basis to ensure compliance with the National Environmental Policy Act (NEPA) and for evaluating the following two alternative plans: ``No Action'' and deepening the federally authorized project from 38 feet to 42 feet deep in the Upper Pascagoula channel, deepening the Horn Island Impoundment Basin from 44 feet to 56 feet, and widening the Gulf Entrance Channel from 450 feet to 550 feet wide. Pascagoula Harbor is authorized to (a) An entrance channel 44 deep and 550 feet wide from the Gulf of Mexico to Horn Island Pass, a channel 44 feet deep and 600 feet wide through Horn Island Pass, including a sediment trap situated on the east side of the channel 1,500 feet long, 56 feet deep, and 175 feet wide; (b) A channel 42 feet deep and 350 feet wide in Mississippi Sound and the Pascagoula River to the railroad bridge at Pascagoula, including a turning basin 2,000 feet long and 950 feet wide (including the channel area) on the west side of the river below the railroad bridge; (c) A channel 42 feet deep throughout and 350 feet wide from the ship channel in Mississippi Sound to the 1,150-foot turning basin at the mouth of Bayou Casotte, then 350 feet wide for about one mile to the northern turning basin, 900 feet wide and 1,750 feet long; (d) A channel 22 feet deep and 150 feet wide up Pascagoula River from the railroad bridge to the mouth of Escatawpa River (Dog River), thence up the Escatawpa River to the Highway 613 Bridge; (e) A channel 12 feet deep and 125 feet wide from the Highway 613 Bridge, via Robertson and Bounds Lakes to mile 6.0 on the Escatawpa River; and (f) A channel 12 feet deep by 80 feet extending from deep water in the Pascagoula River to a turning basin in Krebs Lake a distance of about 1,500 feet, then along the south bank of the lake a channel 10 feet deep and 60 feet wide, terminating at a second turning basin, a distance of 2,700 feet from the first. The tentatively recommended alternative includes construction of the authorized project dimensions.
Board of Visitors, United States Military Academy (USMA)
Document Number: 07-3392
Type: Notice
Date: 2007-07-12
Agency: Department of Defense, Department of the Army, Army Department
The notice of an open meeting scheduled for July 14, 2007 published in the Federal Register on June 19, 2007 (72 FR 33743) has a new meeting location and start time. The meeting will now be held in Room 406A, Kimsey Athletic Center, West Point, New York. The new start time for the meeting is approximately 10:30 a.m.
Notice of Availability of the Final Environmental Impact Statement (FEIS) for Base Realignment and Closure Actions at Aberdeen Proving Ground, MD
Document Number: 07-3386
Type: Notice
Date: 2007-07-12
Agency: Department of Defense, Department of the Army, Army Department
The Department of the Army announces the availability of the FEIS that evaluates the potential environmental impacts associated with realignment actions directed by the Base Realignment and Closure (BRAC) Commission at Aberdeen Proving Ground, Maryland.
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.