Army Department October 10, 2006 – Federal Register Recent Federal Regulation Documents
Results 1 - 3 of 3
Publication of Changes to Surface Deployment and Distribution Command Policy TR-12, Fuel Related Rate Adjustment Policy
SDDC intends to modify SDDC Policy TR-12. SDDC intends to implement the modified policy 90 (ninety) days from publication in the Federal Register. Modifications include the following: 1. SDDC will no longer pay a Fuel Related Adjustment (FRA) or fuel surcharge on movements based on what is known as a ``Spot Bid'' tender. 2. SDDC will no longer pay an FRA for any type of rail shipment. 3. SDDC will pay an FRA based on an updated baseline of $2.50 rather than a baseline of $1.30.
Intent To Prepare a Draft Environmental Impact Statement/Environmental Impact Report (EIR) for a Permit Application for the Carryover Storage and San Vicente Dam Raise Project, San Diego County, CA
The U.S. Army Corps of Engineers (Corps), Los Angeles District, has received an application for a Department of the Army permit under Section 404 of the Clean Water Act from the San Diego County Water Authority (Water Authority) to construct the San Vicente Carryover Storage Project (Proposed Action). As part of the permit process, and in conjunction with the Water Authority, the Corps is evaluating the environmental effects associated with raising San Vicente Dam beyond the permitted height of the Emergency Storage Project (ESP), to provide additional reservoir capacity for carryover storage. The primary Federal involvement associated with the Proposed Action is the discharge of fill materials (including permanent inundation) within Federal jurisdictional areas and waters of the United States. In addition, the Proposed Action could have potential significant effects on the human environment. Therefore, the Corps will prepare an Environmental Impact Statement (EIS) in compliance with the National Environmental Policy Act (NEPA) to render a final decision on the Water Authority's permit application. The Corps decision will be to either issue or deny a Department of the Army permit for the Proposed Action. The EIS will be prepared as a joint document. Pursuant to the California Environmental Quality Act (CEQA), the Water Authority will serve as Lead Agency for the preparation of an Environmental Impact Report (EIR). The Corps and Water Authority have agreed to jointly prepare a Draft EIS/EIR for the Proposed Action to optimize efficiency and avoid duplication. The Draft EIS/EIR is intended to be sufficient in scope to address Federal, state, and local requirements and environmental issues concerning the Proposed Action and permit approvals.
Notice of Intent To Prepare a Draft Environmental Impact Statement (DEIS) for the Nourishment of 7.25 Miles of Beach, the Repositioning of the New River Inlet Channel, and the Implementation of an Inlet Management Plan, in North Topsail Beach, Onslow County, NC
The U.S. Army Corps of Engineers (COE), Wilmington District, Wilmington Regulatory Field Office has received an amendment to the request for Department of the Army authorization, pursuant to Section 404 of the Clean Water Act and Section 10 of the Rivers and Harbors Act, from the town of North Topsail Beach to nourish approximately 7.25 miles of shoreline. The modification will include an additional 3.85 miles of beachfront to protect residential homes and town infrastructures located along the south section of the Town limits. The proposed sources of material for the addition will be dredged from the same offshore borrow area as described in the original 7.25 mile plan. The placement of beach fill along the Town's southern shoreline would result in the initial widening of the beach 75 to 1590 feet seaward, depending on the final design volume and foreshore slopes that the fill assumes during construction. The 3.85 miles of shoreline are located at the southern end of North Topsail Beach. Unlike the original 7.25 miles of proposed nourishment, the additional section is outside the Coastal Barrier Resource System (CBRS) designation; therefore, it is not subject to the expenditure of Federal funding restrictions associated with the Coastal Barrier Resource Act of 1982 and the coastal Barrier Improvement Act of 1990. This south section, or stretch, of shoreline is currently being considered by the U.S. Army Corps of Engineers for a federal shoreline protection project. Due to delays to complete the federal plan formulation process, the North Topsail Beach Board of Alderman voted to include the 3.85 mile section in the non-federal 7.25 mile section that is currently under review pursuant to the Environmental Impact Statement (EIS) procedures. The decision to include the south section in the present EIS process is intended to act as interim or emergency beach fill by preserving existing development and infrastructure along the 3.85 miles of shoreline while the federal plan formulation continues. The original Notice of Intent was published on May 19, 2005 (70 FR 28924) with a commenting deadline of June 21, 2005.
This site is protected by reCAPTCHA and the Google
Privacy Policy and
Terms of Service apply.