Army Department February 24, 2006 – Federal Register Recent Federal Regulation Documents

Final Environmental Impact Statement for the Transformation of the Pennsylvania Army National Guard 56th Brigade Into a Stryker Brigade Combat Team at the National Guard Training Center-Fort Indiantown Gap, PA
Document Number: 06-1697
Type: Notice
Date: 2006-02-24
Agency: Department of Defense, Department of the Army, Army Department
The Department of the Army (DA) and National Guard Bureau have proposed to transform the Pennsylvania Army National Guard (PAARNG) 56th Brigade into a Stryker Brigade Combat Team (SBCT). This Environmental Impact Statement (EIS) discusses in-depth three alternatives: The Preferred Alternative, the Train Using Existing Army Facilities Alternative, and the No-Action Alternative, Under the Preferred Alternative, the PAARNG proposes construction of new training and support facilities at the National Guard Training CenterFort Indiantown Gap (NGTC-FTIG); at Fort Pickett, VA; and at local PAARNG facilities across the State of Pennsylvania, as well as conducting Annual Training (AT) at Fort A.P. Hill, VA, in order to accomplish requisite training. Under the Train Using Existing Army Facilities Alternative, no construction at NGTC-FTIG, Pennsylvania or Fort Pickett, VA would occur; the statewide facilities improvements would occur. Required SBCT Inactive Duty Training (IDT) and AT would be conducted at select regional Army training installations, using existing facilities. Other alternatives considered but eliminated from detailed study are also addressed in the EIS.
Intent To Prepare a Draft Environmental Impact Statement for the Everglades National Park Seepage Management Project, Miami-Dade County, FL
Document Number: 06-1727
Type: Notice
Date: 2006-02-24
Agency: Department of Defense, Department of the Army, Corps of Engineers, Engineers Corps, Army Department
The U.S. Army Corps of Engineers (Corps), Jacksonville District, intends to prepare an integrated Project Implementation Report/Draft Environmental Impact Statement (PIR/DEIS) for the Everglades National Park (ENP) Seepage Management Project. The study is a cooperative effort between the Corps and the South Florida Water Management District (SFWMD), which is also a cooperating agency for this DEIS. The project seeks to reduce eastward water seepage from the Everglades system for the benefit of wetland communities within ENP. The ENP Seepage Management Project is comprised of three components that were recommended as a part of the Central and Southern Florida (C&SF) Project Comprehensive Review Study Feasibility Report and Integrated Environmental Impact Statement (EIS) dated April 1999 (Restudy), and is part of the Comprehensive Everglades Restoration Plan (CERP). The project includes an aboveground recharge area, a wetland buffer area, relocation and enhancement of levee L-31N, a sheetflow delivery system, and other features located adjacent to ENP in Miami- Dade County.
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.