Department of Defense December 2, 2011 – Federal Register Recent Federal Regulation Documents
Results 1 - 7 of 7
United States Navy Restricted Area, SUPSHIP Bath Maine Detachment Mobile at AUSTAL, USA, Mobile, AL; Restricted Area
The U.S. Army Corps of Engineers (Corps) is proposing to amend an existing restricted area to reflect changes in responsible parties for the restricted area around the AUSTAL, USA shipbuilding facility located in Mobile, Alabama. The Supervisor of Shipbuilding, Conversion and Repair, United States Navy (USN), Gulf Coast (SUPSHIP Gulf Coast) assumed the duties of administering new construction contracts at AUSTAL USA in Mobile, Alabama, on October 9, 2011, replacing Supervisor of Shipbuilding, Conversion, and Repair, USN, Bath (SUPSHIP Bath). Therefore, the Department of the Navy has requested an amendment to the regulation to reflect the change in responsible parties. There are no other changes proposed for this restricted area.
Restricted Areas and Danger Zones at Eglin Air Force Base, FL
The U.S. Army Corps of Engineers (Corps) is amending its restricted area/danger zone regulations to update and revise several existing danger zone and restricted area descriptions and restrictions, remove one existing restricted area and establish four new restricted areas within the Eglin Air Force Base (AFB) facilities and along the Eglin AFB facility shoreline in Florida. The Eglin AFB and Eglin Reservation span over 724 square miles with over 150 miles of waterway boundary. This amendment to the existing regulation is necessary to update Eglin AFB water safety and water boundary security in order to provide adequate protection to Eglin AFB personnel and resources in concert with changing mission goals and multi-service/agency special testing and operation needs.
Intent To Prepare an Environmental Impact Statement for the Central Everglades Planning Project, Okeechobee, Glades, Martin, Palm Beach, Broward, Miami-Dade and Monroe Counties, FL
The Everglades ecosystem encompasses a system of diverse wetland landscapes that are hydrologically and ecologically connected across more than 200 miles from north to south and across 18,000 square miles of southern Florida. In 2000, the U.S. Congress authorized the Federal government, in partnership with the State of Florida, to embark upon a multi-decade, multi-billion dollar Comprehensive Everglades Restoration Plan (CERP) to further protect and restore the remaining Everglades ecosystem while providing for other water-related needs of the region. CERP involves modification of the existing network of drainage canals and levees that make up the Central and Southern Florida Flood Control Project. Since 2000, much progress has been made. Construction has begun on the first generation of CERP project modifications already authorized by Congress. These include the Picayune Strand Restoration, the Indian River Lagoon South and Site 1 Impoundment projects. Project Implementation Reports have been completed, or are nearing completion, for the second generation of CERP projects for Congressional authorization, including Biscayne Bay Coastal WetlandsPhase 1, the Broward County Water Preserve Areas, the Caloosahatchee River (C-43) West Basin Storage Reservoir, and the C-111 Spreader Canal Western Project. All of these CERP projects utilize lands that were acquired by the State and Federal government to meet CERP goals of increasing the extent of wetlands, reducing damaging freshwater discharges to the coastal estuaries, and reducing seepage losses from the natural system. These projects contribute significant ecological benefits to the system and the specific regional habitats in which they are located. These initial CERP projects were intended to provide initial and immediate ecological benefits and set the conditions along the margins of the system that help ensure increased water flows to the interior of the system will not cause adverse effects. The next step for implementation of CERP is to redirect water that is currently discharged to the east and west coast estuaries from Lake Okeechobee and restore water flow to the south, allowing for restoration of natural habitat conditions and water flow in the central Everglades and re-connecting the ecosystem from Lake Okeechobee to Everglades National Park and Florida Bay. The Central Everglades Planning Project will develop the initial increment of project features that provide for storage, treatment and conveyance south of Lake Okeechobee, removal of canals and levees within Water Conservation Area 3 and seepage management features to retain water within the natural system. The CERP projects identified to accomplish this include the Everglades Agricultural Storage Reservoirs, Water Conservation Area 3 Decompartmentalization and Sheetflow Enhancement, Everglades National Park (ENP) Seepage Management, and Everglades Rain-Driven Operations. These projects make up the heart of CERP aimed at restoring more natural quantity, quality, timing and distribution of water flows to the remaining portions of the river of grass. An integrated study effort on these projects is needed to set the direction for the next decade of CERP implementation.
Notice of Closed Meetings of the Department of Defense Wage Committee
Pursuant to the provisions of section 10 of Public Law 92-463, the Federal Advisory Committee Act, notice is hereby given that closed meeting of the Department of Defense Wage Committee will be held.
Notice of Closed Meetings of the Department of Defense Wage Committee
Pursuant to the provisions of section 10 of Public Law 92-463, the Federal Advisory Committee Act, notice is hereby given that closed meeting of the Department of Defense Wage Committee will be held.
Notice of Closed Meetings of the Department of Defense Wage Committee
Pursuant to the provisions of section 10 of Public Law 92-463, the Federal Advisory Committee Act, notice is hereby given that closed meeting of the Department of Defense Wage Committee will be held:
Defense Federal Acquisition Regulation Supplement: Proposal Adequacy Checklist (DFARS Case 2011-D042)
DoD is proposing to amend the Defense Federal Acquisition Regulation Supplement to incorporate a proposal adequacy checklist for proposals in response to solicitations that require submission of certified cost or pricing data.
This site is protected by reCAPTCHA and the Google
Privacy Policy and
Terms of Service apply.