Department of Defense November 7, 2011 – Federal Register Recent Federal Regulation Documents

Notice of Intent To Prepare a Draft Environmental Impact Statement/Environment Impact Report (DEIS/DEIR) for a Permit Application for the Proposed San Elijo Lagoon Restoration Project, City of Encinitas, San Diego County, CA
Document Number: 2011-28741
Type: Notice
Date: 2011-11-07
Agency: Department of Defense, Department of the Army, Corps of Engineers
The United States (U.S.) Army Corps of Engineers (Corps), in conjunction with the County of San Diego Department of Parks and Recreation (County Parks), is preparing a joint Environmental Impact Statement/Environmental Impact Report (EIS/EIR) for the proposed San Elijo Lagoon Restoration Project (SELRP). The Corps will be lead agency under National Environmental Protection Act (NEPA) and County Parks will be the lead agency under the California Environmental Quality Act (CEQA). The development of the EIS/EIR and associated technical studies are being completed to determine the Agency Preferred Alternative, which would improve and/or restore wetland functions and services within the San Elijo Lagoon. Given the complexity of the alternatives analysis and range of potentially significant issues, the appropriate environmental document was determined by the Corps and County Parks to be a combined EIS/EIR, respectively. The Corps and the County Parks have agreed to jointly prepare the EIS/EIR to optimize efficiency and avoid duplication. The EIS/EIR is intended to be sufficient in scope to address federal, state, and local requirements for environmental analysis and permitting. Implementing the Agency Preferred Alternative would require a Department of the Army permit pursuant to Section 404 of the Clean Water Act, which regulates the discharge of dredged, excavated, or fill material in wetlands, streams, rivers, and other waters of the U.S. and the potential impacts on the human environment from such activities. To be authorized by the Corps, the Agency Preferred Alternative must also comply with the Section 404(b)(1) Guidelines (40 Code of Federal Regulations [CFR] Part 230) and may not be contrary to the public interest. Federal agencies coordinating in the development of the EIS include the U.S. Fish and Wildlife Service (Service), National Marine Fisheries Service (NMFS), and Environmental Protection Agency (EPA). State agencies coordinating in the development of the EIR include Department of Fish and Game (CDFG), California Coastal Commission (CCC), San Diego Regional Water Quality Control Board (RWQCB), State Water Resources Control Board, California Department of Transportation (Caltrans), and San Diego Association of Governments (SANDAG). The EIR/EIS is currently evaluating three alternative restoration designs, the No Project/No Action alternative, and associated maintenance and long-term management and maintenance measures. In addition, alternatives are being evaluated to determine if project phasing is necessary to maintain adequate habitat for sensitive aquatic species, including light footed clapper rail (Rallus longirostris levipes) and potentially western snowy plovers (Charadrius alexandrines nivosus) and California least terns (Sterna antillarum browni) . The study area encompasses approximately 960 acres within and adjacent to the Reserve, but final project size may vary, depending on the outcome of the alternatives analysis. Additional details and alternative designs are provided in Section 4. Should the project receive a permit, it is anticipated that construction of the SELRP would begin in fall 2014. The study area boundaries for the SELRP are generally defined to include publicly owned parcels where restoration activities could occur.
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.