Department of Defense April 3, 2009 – Federal Register Recent Federal Regulation Documents

Notice of Partially Closed Meeting of the Secretary of the Navy Advisory Panel
Document Number: E9-7533
Type: Notice
Date: 2009-04-03
Agency: Department of Defense, Department of the Navy, Navy Department
The Secretary of the Navy Advisory Panel will meet to receive ethics training and discuss top areas of concern that the Secretary of
Notice of Availability for the Final Environmental Impact Statement/Environmental Impact Report and a Draft General Conformity Determination for the Middle Harbor Redevelopment Project, Port of Long Beach, Los Angeles County, CA
Document Number: E9-7524
Type: Notice
Date: 2009-04-03
Agency: Department of Defense, Department of the Army, Corps of Engineers, Engineers Corps, Army Department
On May 19, 2008, the U.S. Army Corps of Engineers, Los Angeles District, Regulatory Division (Corps) in coordination with the Port of Long Beach (POLB) completed and published the Draft Environmental Impact Statement/Environmental Impact Report (EIS/EIR) for the Middle Harbor Redevelopment Project (Project) in the Port of Long Beach. The Corps and POLB considered all comments received in preparing the Final EIS/EIR, which is available for a 30-day review (April 3, 2009 through May 3, 2009). The Final EIS/EIR includes a draft general conformity determination (see Appendix A-4), pursuant to Section 176(c) of the Clean Air Act. A general conformity determination is necessary because Project construction would require Federal action (i.e., issuance of a Corps permit for activities proposed in navigable waters and waters of the U.S.) and not all the Federal action's direct and indirect emissions would be below specified de minimis thresholds (40 CFR 93.153(b)). Pursuant to the general conformity regulations (40 CFR part 93, subpart B), general conformity determinations do not have to be included in the EIS and can be separately noticed, but the draft general conformity determination for the Federal action associated with the Project is being included in the Final EIS/EIR in this case.
Notice of Intent (NOI) To Prepare an Environmental Impact Statement (EIS) for Proposed Realignment of a Portion of National Guard Avenue and Construction of the New Main Gate for The 158th Fighter Wing, Vermont Air National Guard at Burlington International Airport, Burlington, VT
Document Number: E9-7481
Type: Notice
Date: 2009-04-03
Agency: Department of Defense, Department of the Air Force, Air Force Department
This notice corrects the heading of a notice that was posted in the Federal Register on March 30th 2009, Vol. 74, No. 59 ``U.S. Air Force Scientific Advisory Board Notice Of Meeting Notice Of Intent (NOI) To Prepare An Environmental Impact Statement (EIS) For Proposed Realignment Of A Portion Of National Guard Avenue And Construction of the New Main Gate For the 158th Fighter Wing, Vermont Air National Guard At Burlington International Airport, Burlington, Vermont.''
Notice of Intent To Prepare an Environmental Impact Statement for Mission and Master Planning Actions at Fort Stewart/Hunter Army Airfield, GA
Document Number: E9-7320
Type: Notice
Date: 2009-04-03
Agency: Department of Defense, Department of the Army, Army Department
The United States Army announces its intent to proceed with an
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.