Department of Defense June 13, 2008 – Federal Register Recent Federal Regulation Documents
Results 1 - 2 of 2
Intent To Prepare a Draft Supplemental Environmental Impact Statement/Subsequent Environmental Impact Report for the Sacramento River Deep Water Ship Channel, CA
In accordance with the National Environmental Policy Act (NEPA) and the California Environmental Quality Act (CEQA), the U.S. Army Corps of Engineers, San Francisco District, (Corps) in coordination with the Port of Sacramento is preparing a draft Supplemental Environmental Impact Statement /Subsequent Environmental Impact Report (SEIS/SEIR) to evaluate the action of resuming construction of navigational improvements to the Sacramento River Deep Water Ship Channel (SRDWSC). The SRDWSC runs from the Contra Costa county line to the Port of Sacramento. Construction was initiated in 1989, but work was suspended in 1990 after deepening a portion of the channel to the authorized depth of 35 feet. The proposed action involves deepening the existing Federal navigation channel from 30 feet to 35 feet (mean lower low water) and widening portions of the channel to improve navigational efficiency for movement of goods and safety. The SRDWSC project was originally authorized by the River and Harbors Act of 1946 , Public Law 525, 79th Congress, 2nd Session, and reauthorized under Section 202(a) of the Water Resources and Development Act of 1986, Public Law 99-662, 100 Stat. 4092. This is a notice of intent to prepare an SEIS/SEIR, and to consider alternatives, evaluate potential impacts of the proposed action, and identify appropriate mitigation measures.
Inland Waterways Users Board
In Accordance with 10(a)(2) of the Federal Advisory Committee Act (Pub. L. 92-463), announcement is made of the forthcoming meeting. Name of Committee: Inland Waterways Users Board (Board). Date: July 31, 2008. Location: Marcus Whitman Hotel and Conference Center, Six West Rose Drive, Walla Walla, WA 99362, (509-525-2200 or 866-826-9422). Time: Registration will begin at 8:30 a.m. and the meeting is scheduled to adjourn at 1 p.m. Agenda: The Board will hear briefings on the status of the funding for inland navigation projects and studies, an assessment of the Inland Waterways Trust Fund, and be provided updates of various inland waterways projects.
This site is protected by reCAPTCHA and the Google
Privacy Policy and
Terms of Service apply.