Department of Defense May 19, 2006 – Federal Register Recent Federal Regulation Documents
Results 1 - 6 of 6
Notice of Availability of the Final Environmental Impact Statement for the Proposed Everglades Agricultural Area (EAA) A-1 Reservoir located in Palm Beach County, FL
The U.S. Army Corps of Engineers (USACE) is issuing this notice to advise the public that a Final Environmental Impact Statement (FEIS) has been completed and is available for review and comment.
Exchange of Government Property at Devens Reserve Forces Training Area to MassDevelopment for Future Development
In accordance with 10 United States Code 2869, the Department of the Army intends to enter into an Exchange Agreement with MassDevelopment for the exchange of 13.57+/- acres of Government owned land at Devens Reserve Forces Training Area, Devens, Massachusetts, in exchange for renovations to several buildings at Devens Reserve Forces Training Area. The purpose of this notice is to effect the exchange pursuant to provisions of 10 U.S.C. 2869. This is a partial transfer of the entire acreage located at the facility. Additional information is on file with the U.S. Army Engineer District, Corps of Engineers, Louisville, Kentucky.
Intent To Prepare a Draft Environmental Impact Statement for the Seven Oaks Dam Water Quality Study, San Bernadino County, CA
With the construction of Seven Oaks Dam, during and immediately after storm events, water flows into the pool of water impounded behind the dam may be turbid. Once water is impounded behind the dam, all water flowing in the Santa Ana River that enters Seven Oaks Reservoir must pass through that impoundment before being released at the dam. To the extent that water impounded behind the dam can have a higher level of sediment or algae than water flowing in the Santa Ana River below the Southern California Edison (SCE) No. 1 Powerhouse, the quality of water released from Seven Oaks Dam into the Santa Ana River may be reduced. The purpose of the study is to evaluate the potential impacts, if any, of the Seven Oaks Dam regarding downstream water quality and to characterize upstream water quality. This will entail characterization of the water quality conditions that existed prior to dam construction and determination of how or whether the dam has contributed to water quality impairment as part of the ``baseline conditions analysis''. After the analysis, future studies would be determined with the resource agencies, Local Sponsors, and Stakeholders.
Availability of Draft Environmental Impact Statement for the Proposed Construction of a Dredged Material Containment Facility in the Patapsco River, at Masonville, Baltimore City, MD
In accordance with requirements of the National Environmental Policy Act (NEPA), the U.S. Army Corps of Engineers (USACE), Baltimore District, has prepared a Draft Environmental Impact Statement (DEIS) for the proposed construction of a dredged material containment facility (DMCF) by the Maryland Port Administration (MPA). This DEIS was prepared as part of the submission of MPA's application for a Department of the Army permit to construct the facility in the Patapsco River, Baltimore City, MD. This application will be evaluated pursuant to section 10 or the Rivers and Harbors Act of 1899 and section 404 of the Clean Water Act. The preferred alternative is for the construction of a stone, sand, and cofferdam structure that would impact approximately 131 acres of waters of the United States, including jurisdictional wetlands. The structure would be initially constructed to 10 feet above the mean lower low water (MLLW) elevation, with a future temporary elevation to 42 feet above MLLW, and an ultimate elevation of 36 feet above MLLW. The project would also include mechanical dredging of approximately 1.7 million cubic yards of overburden material within the footprint of the proposed disposal site, and the placement of this material at the Hart Miller Island disposal site, Baltimore County, MD. Hydraulic dredging of approximately 1.5 million cubic yards of sand would be performed, and the sand used to construct the outer portion of the containment structure. Approximately 0.5 million cubic yards of clay is to be mechanically/hydraulically dredged and placed on the inside of this structure. Two new spillway structures and discharge outfalls are to be included in the construction of the DMCF. Other work associated with the construction of the DMCF is the relocation of a city water main line and storm drain systems, and the relocation of a commercial mooring buoy. The total proposed footprint of the proposed project is 141 acres.
Defense Federal Acquisition Regulation Supplement; Radio Frequency Identification (DFARS Case 2006-D002)
DoD has issued an interim rule amending the Defense Federal Acquisition Regulation Supplement (DFARS) to include additional commodities and DoD locations that require package marking with passive radio frequency identification (RFID) tags. The rule requires contractors to affix passive RFID tags at the case and palletized unit load levels when shipping packaged petroleum, lubricants, oils, preservatives, chemicals, additives, construction and barrier materials, and medical materials to specified DoD locations.
This site is protected by reCAPTCHA and the Google
Privacy Policy and
Terms of Service apply.