Department of Defense May 26, 2005 – Federal Register Recent Federal Regulation Documents

Intent To Prepare a Draft Environmental Impact Statement Titled: Alexandria, LA, to the Gulf of Mexico Flood Control Improvements in the Chatlan Lake Canal Basin
Document Number: 05-10544
Type: Notice
Date: 2005-05-26
Agency: Department of Defense, Department of the Army, Corps of Engineers, Engineers Corps, Army Department
The U.S. Army Corps of Engineers, New Orleans District, is initiating this study authorized by a July 23, 1997 resolution of the Committee on Transportation and Infrastructure of the U.S. House of Representatives. The resolution reads: ``Resolved by the Committee on Transportation and Infrastructure of the U.S. House of Representatives, that the Secretary of the Army is required to review the report of the Chief of Engineers on the Mississippi River and Tributaries Project, published as House Document 308, Eighty-eighth Congress, Second Session, and other pertinent reports, to determine whether modifications of the recommendations contained therein are advisable at the present time in the interest of flood control, navigation, wetlands, conservation restoration, wildlife habitat, commercial and recreational fishing, saltwater intrusion, freshwater and sediment diversion, and other purposes in the area drained by the West Atchafalaya Basin Protection Levee, from Alexandria, Louisiana, to the Gulf of Mexico.''
Intent To Prepare a Draft Environmental Impact Statement (DEIS) for the Construction of a Proposed Disposal Site for Dredged material in the Middle Branch of the Patapsco River, at Masonville, Baltimore City/Application for a Corps Section 10/404 Individual Permit
Document Number: 05-10543
Type: Notice
Date: 2005-05-26
Agency: Department of Defense, Department of the Army, Corps of Engineers, Engineers Corps, Army Department
The Baltimore District, U.S. Army Corps of Engineers (Corps) expects receipt of an application in January 2006 from the State of Maryland Department of Transportation, Maryland Port Administration (MPA) for a Section 10/404 individual permit for the construction of a disposal site for dredged material in the Middle Branch of the Patapsco River, at Masonville, Baltimore City, MD. Based on preliminary discussions with the MPA, the Corps has determined that an environmental impact statement (EIS) is required for this proposed project. The applicant's stated purpose of the proposed project is to provide a disposal site to accommodate dredged material generated by dredging projects occurring over the next 5 to 10 years in the Baltimore Harbor area. The EIS will focus on the 5-10 year dredging needs within Baltimore Harbor and upland containment and beneficial use of dredged materials from the Port of Baltimore channel system in the Patapsco River and its tributaries. As part of this study, in accordance with the National Environmental Policy Act (NEPA) of 1969, an EIS will be prepared to document the plan formulation process and recommendations of this study.
Meeting of the Uniform Formulary Beneficiary Advisory Panel
Document Number: 05-10490
Type: Notice
Date: 2005-05-26
Agency: Office of the Secretary, Department of Defense
This notice announces a meeting of the Uniform Formulary Beneficiary Advisory Panel. The panel will review and comment on recommendations made to the Director, TRICARE Management Activity, by the Pharmacy and Therapeutics Committee regarding the Uniform Formulary. The meeting will be open to the public. Seating is limited and will be provided only to the first 220 people signing in. All persons must sign in legibly. Notice of this meeting is required under the Federal Advisory Committee Act.
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.