This final rule implements a legislative provision on milk substitutes that is consistent with current regulations on menu exceptions for students with disabilities and adds requirements for the optional substitution of nondairy beverage for fluid milk for children with medical or special dietary needs in the National School Lunch Program and the School Breakfast Program. Specifically, this final rule establishes nutrient standards for nondairy beverage alternatives to fluid milk, allows schools to accept a written substitution request from a parent or legal guardian, grants schools discretion to select the acceptable nondairy beverages, and continues to make school food authorities responsible for substitution expenses that exceed the Federal reimbursement. This rule ensures consistency of standards among milk substitutes offered in the school lunch and breakfast programs, and assures that students who consume nondairy beverage alternates receive important nutrients found in fluid milk.
Notice of Intent To Prepare an Environmental Impact Statement (EIS) for the Boardman-Hemingway 500 kilovolt (kV) Transmission Line Project (Project) in Idaho and Oregon and Possible Land Use Plan Amendments
Pursuant to section 102 (2)(C) of the National Environmental Policy Act (NEPA) of 1969 and in response to right-of-way (ROW) applications filed by Idaho Power Company, the Bureau of Land Management (BLM), Vale District Office, and U.S. Forest Service (USFS), Wallowa-Whitman National Forest announce their intent to prepare an EIS and conduct public scoping meetings. Idaho Power Company proposes to construct, operate, and maintain a single circuit 500 kV overhead electric transmission line and appurtenant facilities beginning near Boardman, Oregon, and terminating near Melba, Idaho. The proposed route roughly parallels Interstate 84 and is approximately 278 miles long. Authorization of this Project may require the amendment of USFS or BLM land use plans.
Huron-Manistee National Forests, Michigan, White Pines Wind Farm Project
The Forest Service has accepted an application for a special use authorization from White Pines Wind Farm LLC for the installation and operation of 20 to 28 wind turbines and associated infrastructure to provide between 50 and 70 megawatts (MW) of wind energy on National Forest System (NFS) lands managed by the Huron-Manistee National Forests. The White Pines Wind Farm Project (the Project) would occupy approximately 75 acres of NFS land within a Project Area of about 10,000 acres on the Cadillac-Manistee Ranger District over its proposed 30-year life.