Coast Guard July 30, 2013 – Federal Register Recent Federal Regulation Documents
Results 1 - 2 of 2
Drawbridge Operation Regulation; Willamette River at Portland, OR
The Coast Guard has issued a temporary deviation from the operating schedule that govern four Multnomah County bridges: The Broadway Bridge, mile 11.7, the Burnside Bridge, mile 12.4, the Morrison Bridge, mile 12.8, and the Hawthorne Bridge, mile 13.1, all crossing the Willamette River at Portland, OR. This deviation is necessary to accommodate the annual Portland Providence Bridge Pedal event. This deviation allows the bridges to remain in the closed position to allow safe movement of event participants.
Drawbridge Operation Regulation; Atlantic Intracoastal Waterway (AICW), Elizabeth River, Southern Branch, Chesapeake and Portsmouth, VA
The Coast Guard has issued a temporary deviation from the operating schedule that governs the operation of the Belt Line Railroad Bridge, across the Elizabeth River Southern Branch, AICW, mile 2.6, at Chesapeake and Portsmouth, VA. This deviation is necessary to facilitate mechanical and electrical upgrades on the Belt Line Railroad drawbridge. This temporary deviation allows the drawbridge to remain in the closed to navigation position.
This site is protected by reCAPTCHA and the Google
Privacy Policy and
Terms of Service apply.