Bureau of Reclamation January 2011 – Federal Register Recent Federal Regulation Documents

Bunker Hill Groundwater Basin, Riverside-Corona Feeder Project, San Bernardino and Riverside Counties, CA
Document Number: 2011-1127
Type: Notice
Date: 2011-01-20
Agency: Department of the Interior, Bureau of Reclamation
Pursuant to the National Environmental Policy Act (NEPA) and the California Environmental Quality Act (CEQA), the Bureau of Reclamation (Reclamation) and the Western Municipal Water District (Western) have prepared a Supplemental Draft Environmental Impact Report and a Draft Environmental Impact Statement (SDEIR/DEIS) for the proposed Riverside-Corona Feeder (RCF) Project. Interested parties are invited to comment on the SDEIR/DEIS. The Federal action will provide funds for a proposed aquifer storage and recovery project, including new groundwater wells and a 28- mile water pipeline with pump stations and a reservoir storage tank. The project is intended to improve the reliability of Western's water supply through managed storage, extraction and distribution of local and imported water supplies, using available capacity in the Bunker Hill Groundwater Basin and the Chino Basin.
Joint Operations Center Relocation Project, Sacramento County, CA
Document Number: 2011-1004
Type: Notice
Date: 2011-01-19
Agency: Department of the Interior, Bureau of Reclamation
Pursuant to the National Environmental Policy Act and the California Environmental Quality Act, the Bureau of Reclamation (Reclamation), the lead Federal agency, and the California Department of Water Resources (DWR), the lead State agency, will prepare a joint EIS/EIR for the proposed Joint Operations Center (JOC) Relocation Project (Proposed Action). The purpose of the Proposed Action is to construct a new JOC in the Sacramento area to be occupied by June 2015. The new JOC would provide typical office space and special needs/ essential services space for combined occupancy by Reclamation, DWR, and the NOAA's National Weather Service (NWS) to replace jointly occupied space at 3310 El Camino Avenue in Sacramento.
Glen Canyon Dam Adaptive Management Program Work Group (AMWG)
Document Number: 2010-33338
Type: Notice
Date: 2011-01-05
Agency: Department of the Interior, Bureau of Reclamation, Reclamation Bureau
The Glen Canyon Dam Adaptive Management Program (AMP) was implemented as a result of the Record of Decision on the Operation of Glen Canyon Dam Final Environmental Impact Statement to comply with consultation requirements of the Grand Canyon Protection Act (Pub. L. 102-575) of 1992. The AMP includes a Federal advisory committee, the Adaptive Management Work Group (AMWG), a technical work group (TWG), a Grand Canyon Monitoring and Research Center, and independent review panels. The AMWG makes recommendations to the Secretary of the Interior concerning Glen Canyon Dam operations and other management actions to protect resources downstream of Glen Canyon Dam consistent with the Grand Canyon Protection Act. The TWG is a subcommittee of the AMWG and provides technical advice and recommendations to the AMWG.
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.