Outer Continental Shelf (OCS), Gulf of Mexico (GOM), Oil and Gas Lease Sales, Central Planning Area (CPA) Lease Sales 235, 241, and 247
BOEM has prepared a Draft Supplemental EIS for proposed OCS oil and gas Lease Sales 235, 241, and 247, which are tentatively scheduled to be held in March 2015, 2016, and 2017, respectively, in the CPA offshore the States of Louisiana, Mississippi, and Alabama. This Draft Supplemental EIS updates the environmental and socioeconomic analyses for proposed CPA Lease Sales 235, 241, and 247 in the Gulf of Mexico OCS Oil and Gas Lease Sales: 2012-2017; Western Planning Area Lease Sales 229, 233, 238, 246, and 248; Central Planning Area Lease Sales 227, 231, 235, 241, and 247, Final Environmental Impact Statement (OCS EIS/EA BOEM 2012-019) (2012-2017 WPA/CPA Multisale EIS) and in the Gulf of Mexico OCS Oil and Gas Lease Sales: 2013-2014; Western Planning Area Lease Sale 233; Central Planning Area Lease Sale 231, Final Supplemental Environmental Impact Statement (OCS EIS/EA BOEM 2013-0118) (WPA 233/CPA 231 Supplemental EIS). The 2012-2017 WPA/CPA Multisale EIS was completed in July 2012. The WPA 233/CPA 231 Supplemental EIS was completed in April 2013.
Potential Marine Hydrokinetic (MHK) Research Lease on the Outer Continental Shelf (OCS) Offshore Oregon; Request for Competitive Interest
The purpose of this public notice is to: (1) Describe the proposal submitted to BOEM by the Northwest National Marine Renewable Energy Center at Oregon State University (NNMREC-OSU) to acquire an OCS lease for MHK research activities; (2) solicit submissions of indications of interest in obtaining a renewable energy lease for MHK research or commercial activities on the OCS offshore Oregon in the area described in this notice; and (3) solicit public input regarding the area described in this notice, the potential environmental consequences of MHK energy development in the area, and multiple uses of the area. On June 17, 2013, BOEM received an unsolicited request from NNMREC- OSU for an MHK OCS research lease offshore Oregon. The objective of NNMREC-OSU is to obtain a lease under 30 CFR 585.238 for renewable energy research activities, including MHK device installation and operational testing and the installation of monitoring equipment. The purpose of NNMREC-OSU's proposed project, the ``Pacific Marine Energy CenterSouth Energy Test Site,'' is to design, develop and demonstrate a grid-connected MHK research facility on the OCS approximately five nautical miles (nmi) southwest of Newport, Oregon. The project would consist of four test sites (or berths), with each test berth capable of testing single or multiple MHK devices and equipped with its own subsea cable to transmit energy, as well as performance and environmental data, from the test berth to an onshore control center. Each of the test berth electrical cables would connect at a single submerged point, with a single transmission export cable capable of transmitting up to 10 megawatts (MW) of electricity to the mainland. The export cable would cross the OCS and state submerged lands. Additional information on NNMREC-OSU's unsolicited lease request can be viewed at: www.boem.gov/Oregon. This RFCI is published pursuant to subsection 8(p)(3) of the OCS Lands Act, as amended by section 388 of the Energy Policy Act of 2005 (EPAct) (43 U.S.C. 1337(p)(3)), and the implementing regulations at 30 CFR 585.238. Subsection 8(p)(3) of the OCS Lands Act requires that OCS renewable energy leases, easements and rights-of-way be issued ``on a competitive basis unless the Secretary determines after public notice of a proposed lease, easement, or right-of-way that there is no competitive interest.'' 30 CFR 585.238(c) states that BOEM may issue research leases if ``no competitive interest exists''. This RFCI provides such public notice for the proposed lease area requested by NNMREC-OSU and invites the submission of indications of interest. BOEM is soliciting submissions of interest for MHK energy development only with this notice. BOEM will consider the responses to this public notice to determine whether competitive interest exists for the area requested by NNMREC-OSU, as required by 43 U.S.C. 1337(p)(3). Parties wishing to obtain a lease for MHK development for the area described herein under ``Description of the Proposed Lease Area'' should submit detailed and specific information as described in the section entitled, ``Required Indication of Interest Information.'' BOEM has jurisdiction to issue leases on the OCS for MHK projects under subsection 8(p) of the OCS Lands Act (43 U.S.C. 13376(p)), and the Federal Energy Regulatory Commission (FERC) has jurisdiction to issue licenses under Part I of the Federal Power Act (FPA), 16 U.S.C. 792-823A (2006) for the construction and operation of hydrokinetic projects on the OCS. This announcement also requests that interested and affected parties comment and provide information about site conditions and multiple uses within the area identified in this notice that would be relevant to the proposed project or its potential impacts. A detailed description of the proposed lease area can be found in the section of this notice entitled, ``Description of the Area.''
Outer Continental Shelf (OCS), Gulf of Mexico (GOM), Oil and Gas Lease Sales, Western Planning Area (WPA) Lease Sales 238, 246, and 248 MMAA104000
Consistent with the regulations implementing the National Environmental Policy Act, as amended (42 U.S.C. 4321 et seq.) (NEPA), BOEM has prepared a Final Supplemental EIS for proposed OCS oil and gas Lease Sales 238, 246, and 248, which are tentatively scheduled to be held in August 2014, 2015, and 2016, respectively, in the WPA offshore the States of Texas and Louisiana. This Final Supplemental EIS updates the baseline conditions and potential environmental effects of oil and natural gas leasing, exploration, development, and production in the WPA since publication of Gulf of Mexico OCS Oil and Gas Lease Sales: 2012-2017; Western Planning Area Lease Sales 229, 233, 238, 246, and 248; Central Planning Area Lease Sales 227, 231, 235, 241, and 247, Final Environmental Impact Statement (OCS EIS/EA BOEM 2012-019) (2012- 2017 WPA/CPA Multisale EIS) and Gulf of Mexico OCS Oil and Gas Lease Sales: 2013-2014; Western Planning Area Lease Sale 233; Central Planning Area Lease Sale 231, Final Supplemental Environmental Impact Statement (OCS EIS/EA BOEM 2013-0118) (WPA 233/CPA 231 Supplemental EIS). The 2012-2017 WPA/CPA Multisale EIS was completed in July 2012. The WPA 233/CPA 231 Supplemental EIS was completed in April 2013.