Availability of a Final Integrated Feasibility Report and Environmental Impact Statement for the Mid-Chesapeake Bay Island Ecosystem Restoration Project in Dorchester County, on Maryland's Eastern Shore
Document Number: E8-22764
Type: Notice
Date: 2008-09-29
Agency: Department of Defense, Department of the Army, Corps of Engineers, Engineers Corps, Army Department
In accordance with the requirements of the National Environmental Policy Act (NEPA), the U.S. Army Corps of Engineers (USACE), Baltimore District has prepared a Final Integrated Feasibility Report and Environmental Impact Statement (EIS) for the Mid-Chesapeake Bay Island Ecosystem Restoration Project in Dorchester County, on Maryland's Eastern Shore. Approximately 90 to 95 million cubic yards of material, primarily dredged during maintenance of the Chesapeake Bay approach channels to Baltimore Harbor, would be placed behind dikes at James Island. Material placed at Barren Island would be from authorized maintenance dredging of Federal navigation channels in the Honga River. After placement, the material would be shaped and planted to provide 2,144 acres of island habitat at James and Barren Islands as well as protect existing island ecosystem habitat, including critical submerged aquatic vegetation. A Record of Decision may be signed no earlier than 30 days after the EPA Notice of Availability for the Final document.
Exchange of Government Property at Soldier Systems Center (SSC), Natick, MA, to a Development Company (To Be Selected) for Future Development
Document Number: E8-22759
Type: Notice
Date: 2008-09-29
Agency: Department of Defense, Department of the Army, Corps of Engineers, Engineers Corps, Army Department
In accordance with 10 United States Code 2869, the Department of the Army intends to enter into an Exchange Agreement with a Development Company (to be selected) for the exchange of three (3) separate parcels (totaling 94.79+/-acres) of Government owned land at Soldier Systems Center, Natick, Massachusetts, in exchange for the construction and renovation to several buildings at Soldier Systems Center. The purpose of this notice is to effect the exchange pursuant to provisions of 10 U.S.C. 2869. This is a partial transfer of the entire acreage located at the facility. Additional information is on file with the U.S. Army Engineer District, Corps of Engineers, Baltimore, Maryland.
Notice of Availability for the Draft Environmental Impact Statement/ Environmental Impact Report for the San Pedro Waterfront Project, Los Angeles County, CA
Document Number: E8-22641
Type: Notice
Date: 2008-09-26
Agency: Department of Defense, Department of the Army, Corps of Engineers, Engineers Corps, Army Department
The U.S. Army Corps of Engineers, Los Angeles District (Regulatory Division), in coordination with the Port of Los Angeles, has completed a Draft Environmental Impact Statement/Environmental Impact Report (EIS/EIR) for the San Pedro Waterfront Project, encompassing approximately 400 acres of land and water primarily along the west side of the Main Channel westward to Harbor Boulevard from the Vincent Thomas Bridge southward to Inner Cabrillo Beach in the Port of Los Angeles. The Port of Los Angeles requires authorization pursuant to section 404 of the Clean Water Act, section 10 of the Rivers and Harbors Act, and section 103 of the Marine Protection, Research, and Sanctuaries Act, to implement various regulated activities in and over waters of the U.S. associated with redeveloping San Pedro Waterfront, which would include the following elements:
Public Scoping Meetings for Update of the Water Control Manual for the Apalachicola-Chattahoochee-Flint River Basin in Georgia, Florida, and Alabama
Document Number: E8-21912
Type: Notice
Date: 2008-09-19
Agency: Department of Defense, Department of the Army, Corps of Engineers, Engineers Corps, Army Department
The U.S. Army Corps of Engineers (Corps), Mobile District, issued a Notice of Intent (NOI) in the Federal Register (73 FR 9780) published on February 22, 2008, describing the preparation of a Draft Environmental Impact Statement (EIS), as required by the National Environmental Policy Act (NEPA) to address the proposed update of the Water Control Manual (WCM) for the Apalachicola-Chattahoochee-Flint (ACF) River Basin located in Georgia, Florida, and Alabama. The Corps will hold five public scoping meetings during the month of October as part of its review and update of the WCM for the ACF River Basin. The public is invited to attend the scoping meetings which will provide information on the WCM update process and afford the opportunity to receive input from the public about their issues and concerns regarding that process. All five public meetings will be held using an open house format, allowing time for participants to review specific information and to provide comments to the resource staff attending the meeting.
Restricted Area at Blount Island Command and Marine Corps Support Facility-Blount Island, Jacksonville, FL
Document Number: E8-21895
Type: Rule
Date: 2008-09-18
Agency: Department of Defense, Department of the Army, Corps of Engineers, Engineers Corps, Army Department
The U.S. Army Corps of Engineers (Corps) is amending the existing regulations for a restricted area at Blount Island Command, located on Marine Corps Support FacilityBlount Island, Jacksonville, Florida. Blount Island Command is responsible for managing the United States Marine Corps Prepositioning Programs. Due to the importance of this mission, the current restricted area in this section must be extended due to Department of Defense (DoD) directives that require the implementation of specified force protection measures by all DoD components. This amendment to the existing regulation is necessary to protect U.S government personnel, equipment, and facilities from potential terrorist attack by providing stand-off corridors encompassing the waters immediately contiguous to Marine Corps Support FacilityBlount Island.
Notice of Intent To Prepare a Draft Environmental Impact Statement for the City of Raleigh, Little River Reservoir Project in Wake County, NC
Document Number: E8-21426
Type: Notice
Date: 2008-09-15
Agency: Department of Defense, Department of the Army, Corps of Engineers, Engineers Corps, Army Department
The U.S. Army Corps of Engineers (COE), Wilmington District, Wilmington Regulatory Division has received a request for Department of the Army authorization, pursuant to Section 404 of the Clean Water Act, from the City of Raleigh to construct a drinking water reservoir on Little River to satisfy the future demands for the service area which includes Raleigh, Garner, Knightdale, Rolesville, Wake Forest, Wendell, and Zebulon, NC. The proposed project would require the construction of a dam north of U.S. Highway 64 on Little River, a tributary in the Neuse River Basin. In addition, infrastructure improvements including a water treatment plant, water lines, and raising and/or closing existing roadways are expected.
Economic and Environmental Principles and Guidelines for Water and Related Land Resources Implementation Studies; Availability of Proposed Principles and Request for Comments
Document Number: E8-21294
Type: Notice
Date: 2008-09-12
Agency: Department of Defense, Department of the Army, Corps of Engineers, Engineers Corps, Army Department
Section 2031 of the Water Resources Development Act of 2007 (Pub. L. 110-114) directs the Secretary of the Army to revise the Economic and Environmental Principles and Guidelines for Water and Related Land Resources Implementation Studies (P&G), which the Water Resources Council issued on March 10, 1983. The Army Corps of Engineers (``Corps'') proposes to craft the revision in phases. The first phase would address the basic principles of water resources planning (``Principles'') and the next phase or phases would provide more detailed implementing guidance. This notice includes a copy of the proposed Principles (see SUPPLEMENTARY INFORMATION), which would replace the first two pages of the P&G. The proposed Principles may also be found at: https:// www.usace.army.mil/cw/hot_topics/ht_2008/pandg_rev.htm.
United States Navy Restricted Area, Naval Support Activity, Panama City, FL
Document Number: E8-21292
Type: Rule
Date: 2008-09-12
Agency: Department of Defense, Department of the Army, Corps of Engineers, Engineers Corps, Army Department
The U.S. Army Corps of Engineers (Corps) is establishing ten restricted areas at Naval Support Activity (NSA), Panama City (PC), Florida. NSA, Panama City, and its major tenant command, the Naval Surface Warfare Center (NSWC), have been recognized as one of the lead research, development, test and evaluation laboratories of the U.S. Navy. In addition, the Naval Diving and Salvage Training Center (NDSTC) was relocated from the Washington Navy Yard to NSA PC and now hosts a consolidated training for the U.S. Army Corps of Engineers, U.S. Coast Guard, the Navy's satellite dive schools, the U.S. Marine Corps and the U.S. Air Force. As such, a large majority of military dive training is now concentrated at NSA, PC. The restricted areas in Panama City waters meet strict military training parameters that cannot be duplicated elsewhere. Military training in and around St. Andrews Bay has existed in harmony with local boat traffic and development since 1945. NSA, PC is formalizing these ongoing activities within the waters of St. Andrews Bay in an effort to maximize public safety and to preserve current military training vital to the Global War on Terror and to all service military readiness.
Intent To Prepare a Draft Environmental Impact Statement for the Proposed Folsom South of U.S. Highway 50 Specific Plan Project, in Sacramento County, CA, Corps Permit Application Number SPK-2007-02159
Document Number: E8-21289
Type: Notice
Date: 2008-09-12
Agency: Department of Defense, Department of the Army, Corps of Engineers, Engineers Corps, Army Department
The South Folsom Property Owners Group proposes to implement a large-scale, mixed-use, mixed-density master planned community with residential, commercial, office, public/quasi-public uses, open space, and parks. The proposed project consists of approximately 1,464 acres of residential development, 523 acres of mixed-use and commercial development, 109 acres of parks, and 1,053 acres of open space. The majority of the 1,053 acres of open space would be located in the western portion of the project site. This area includes Alder Creek, numerous cultural resources sites, and the highest concentration of oak woodland habitat within the project site. The proposed Folsom South of 50 Specific Plan includes development of up to 10,045 mixed-density residential homes and approximately 7.4 million square feet of retail and office uses within an area south of Highway 50 that would be annexed to the City of Folsom. The proposed project would provide five elementary schools, one joint middle school/ high school, and a campus for the Sacramento County Day School. It is anticipated that construction would begin in 2010. The initiation and duration of construction would depend on market conditions and receipt of environmental permits and clearances; full build-out would likely be completed within 20 years from construction commencement. The project site is approximately 3,502 acres and contains 82.89 acres of waters of the United States. The proposed project would directly affect approximately 21.28 acres of waters of the United States, including vernal pools and other wetlands. These acreages do not include indirect impacts from the proposed action or impacts anticipated to result from off-site infrastructure that may be determined to be required as part of the U.S. Army Corps of Engineers' (USACE) Environmental Impact Statement (EIS) process. The EIS will be prepared as a joint document with the City of Folsom. The City is the local agency responsible for preparing an Environmental Impact Report in compliance with the California Environmental Quality Act (CEQA).
Notice of Intent To Prepare an Environmental Impact Statement (EIS) for the Intake Diversion Dam Modification, Lower Yellowstone Project, Montana
Document Number: E8-21188
Type: Notice
Date: 2008-09-12
Agency: Department of Defense, Department of the Interior, Department of the Army, Corps of Engineers, Bureau of Reclamation, Engineers Corps, Army Department
Pursuant to section 102(2)(C) of the National Environmental Policy Act (NEPA) of 1969, as amended, and the Council on Environmental Quality's (CEQ) regulations for implementing the procedural provisions of NEPA, the Bureau of Reclamation (Reclamation) and the U.S. Army, Corps of Engineers (Corps) propose to jointly prepare an EIS that analyzes and discloses effects associated with modifications to Intake Diversion Dam. The proposed Federal action is to modify Intake Diversion Dam and canal headworks, features of Reclamation's Lower Yellowstone Project, to improve passage and reduce entrainment for endangered pallid sturgeon and other native fish in the lower Yellowstone River. Reclamation and the Corps will serve as joint lead Federal agencies in the preparation of the Intake Diversion Dam Modification EIS. Reclamation will act as administrative lead for NEPA compliance activities during preparation of the EIS. Reclamation and the Corps will each consider and approve a Record of Decision regarding actions and decisions for which the respective agencies are responsible.
Intent To Prepare a Draft Environmental Impact Statement for Shoreline Protection for Flagler County, FL
Document Number: E8-20722
Type: Notice
Date: 2008-09-08
Agency: Department of Defense, Department of the Army, Corps of Engineers, Engineers Corps, Army Department
The Jacksonville District, U.S. Army Corps (Corps) of Engineers intends to prepare a Draft Environmental Impact Statement (EIS) for protection of 18-Miles of coastal shoreline in Flagler County, FL. The project is a cooperative effort between the U.S. Army Corps of Engineers (lead Federal agency) and City of Flagler Beach (non-Federal sponsor and cooperating agency).
Missouri River Recovery Implementation Committee; Meeting
Document Number: E8-20721
Type: Notice
Date: 2008-09-08
Agency: Department of Defense, Department of the Army, Corps of Engineers, Engineers Corps, Army Department
In accordance with Section 5018 (b) of the Water Resources Act of 2007, announcement is made of the following committee meeting: Name of Committee: Missouri River Recovery Implementation Committee. Date: September 29-October 1, 2008. Time: 1 p.m. to 6 p.m. (September 29, 2008). 8:30 a.m. to 6 p.m. (September 30, 2008). 8:30 a.m. to 6 p.m. (October 1, 2008). Place: Sheraton Clayton Plaza Hotel, 7730 Bonhomme Avenue, Clayton, MO 63105.
Availability of Final Supplemental Environmental Impact Statement for Atlantic Coast of Maryland Shoreline Protection Project-General Reevaluation Study: Borrow Sources for 2010-2044, Ocean City, MD
Document Number: E8-20720
Type: Notice
Date: 2008-09-08
Agency: Department of Defense, Department of the Army, Corps of Engineers, Engineers Corps, Army Department
In accordance with the requirements of the National Environmental Policy Act (NEPA), the Baltimore District, U.S. Army Corps of Engineers (USACE), has prepared a Final Supplemental Environmental Impact Statement (SEIS) for the Atlantic Coast of Maryland Shoreline Protection Project (Atlantic Coast Project). The SEIS evaluated new borrow sources to provide sand for routine periodic beach nourishment of Ocean City, MD, for the years 2010-2044. Existing borrow sources in state waters are anticipated to be exhausted after about 2010. Between 6,800,000 and 15,000,000 cubic yards of sand would be needed through 2044, depending on future storm frequency and intensity. Three offshore shoals in Federal waters are proposed as sand sources: Weaver, Isle of Wight, and ``A.'' Sand may also be dredged from Shoal ``B,'' also known as Bass Grounds or First Lump, in the future, but only if its value as a fishing ground declines substantially. Guidelines to minimize long-term impacts to the offshore shoals were formulated in coordination with resource agency personnel and academic experts. Dredging would be conducted in accordance with these guidelines. Specific dredging plans would be developed in coordination with resource agencies prior to each beach nourishment cycle.
Board on Coastal Engineering Research
Document Number: E8-20358
Type: Notice
Date: 2008-09-03
Agency: Department of Defense, Department of the Army, Corps of Engineers, Engineers Corps, Army Department
In accordance with Section 10(a)(2) of the Federal Advisory Committee Act (Pub. L. 92-463), announcement is made of the following committee meeting: Name of Committee: Board on Coastal Engineering Research. Date of Meeting: September 23-25, 2008. Place: Pavilion Ballroom, Hilton Portland and Executive Tower, 921 SW 6th Avenue, Portland, OR 97204. Time: 8 a.m. to 5 p.m. (September 23, 2008); 8 a.m. to 5:30 p.m. (September 24, 2008); 8 a.m. to 5 p.m. (September 25, 2008).