Notice of Intent To Prepare an Environmental Impact Statement for 408 Permission and 404 Permit to Sacramento Area Flood Control Agency for the Natomas Levee Improvement Project, Sacramento, CA
The action being taken is the preparation of an environmental impact statement (EIS) for the issuance of both the 408 permission and 404 permit to SAFCA for their work on the Natomas Levee Improvement Project (NLIP). The 408 is permission to alter existing flood control structures and the 404 permit is required for the discharge of dredged or fill material into the waters of U.S. under the Clean Water Act. The NLIP is located in Sacramento and Sutter Counties, California. SAFCA is requesting this permission and permit in order to complete construction along the Natomas Cross Canal and on the landside of the east levee of the Sacramento River.
Notice of Intent To Grant Partially Exclusive License of U.S. Patent Application No. 11/82,432 Entitled “A Method and System for Treating Metal-Containing Fluid Emissions” and U.S. Patent Application No. 10/931,232 “Perlite Sorbents for Vapor Phase Metals and Metals Compounds”
In accordance with 37 CFR 404.7(a)(1)(i), announcement is made of a prospective partially exclusive license for specific applications of small ammunition destruction, soil remediation from contaminants, and Municipal Solid Waste (MSW) recycling (converting waste products into reusable materials) in worldwide markets.
Intent To Prepare a Draft Environmental Impact Statement for the Construction and Operation of a 300-MW Coal-Fired Electric Generating Unit Proposed by Wisconsin Power and Light Company near Cassville in Grant County, WI
Wisconsin Power and Light Company (WPL) has applied to the St. Paul District, Corps of Engineers (Corps) for a permit to conduct work below the ordinary high water mark of the Mississippi River, a navigable water of the U.S., and to discharge dredged or fill material into waters of the U.S. to facilitate the construction and operation of a 300 megawatt (MW) baseload coal-fired electric generating unit, referred to as NED 3, near Cassville in Grant County, WI. Specifically, the WPL is proposing an atmospheric circulating fluidized bed boiler and steam turbine generator unit at a site adjacent to the existing Nelson Dewey Generating Station (NED) Units 1 and 2 on the Mississippi River at River Mile 607.7. In addition to the new power generating unit, the following associated facilities would be constructed and operated: A new lateral collector well to supply cooling water; additional barge unloading capacity including three additional barge moorings in the Mississippi River, a new barge unloading tower foundation, and a temporary equipment barge unloading ramp; a new storm water detention pond and pipe outfall structure; 1.7-mile-long off-site parallel industrial railroad tracks, including a sheet pile retaining wall, adjacent to the existing BNSF railroad mainline tracks; new railroad bridges over two creeks for the off-site parallel industrial railroad tracks; and two new coal pile runoff ponds to replace the existing coal pile runoff pond adjacent to the railroad tracks. The project would require the discharge of dredged or fill material into the Mississippi River and two creeks that are tributaries to the Mississippi River. The Mississippi River is a navigable water of the U.S. The discharge of dredged or fill material into waters of the U.S. requires a permit issued by the Corps under Section 404 of the Clean Water Act. Construction work conducted below the ordinary high water mark of a navigable water of the U.S. requires a permit issued by the Corps under Section 10 of the Rivers and Harbors Act. The final environmental impact statement will be used as a basis for the permit decision and to ensure compliance with the National Environmental Policy Act (NEPA).
Notice of Availability for the Final Environmental Impact Statement for Widening of the Freeport Ship Channel in Freeport, Brazoria County, TX
The U.S. Army Corps of Engineers, Galveston District announces the release of the Final Environmental Impact Statement (FEIS) and the public comment period, and the availability of the Final General Conformity Determination for the Brazos River Harbor Navigation District's (Port of Freeport) proposed widening of the Freeport Harbor Ship Channel.
Estuary Habitat Restoration Council; Open Meeting
In accordance with section 105(h) of the Estuary Restoration Act of 2000, (Title I, Pub. L. 106-457), announcement is made of the forthcoming meeting of the Estuary Habitat Restoration Council. The meeting is open to the public.
Intent To Prepare a Draft Feasibility Study and Environmental Impact Statement for Modification of the Coos Bay Navigational Channel, Coos County, OR
The U.S. Army Corps of Engineers (Corps), Portland District will be the lead agency for a combined Draft Feasibility Study/ Environmental Impact Statement (FS/EIS) for Coos Bay Channel Modifications in Coos County, Oregon. The FS/EIS is being prepared by the Oregon International Port of Coos Bay (Port) under the authority granted by section 203 of the Water Resources Development Act (WRDA) of 1986.