Army Department June 22, 2005 – Federal Register Recent Federal Regulation Documents

Military Police Investigations
Document Number: 05-12310
Type: Rule
Date: 2005-06-22
Agency: Department of Defense, Department of the Army, Army Department
The Department of the Army is publishing our rule concerning military police investigations. The regulation prescribes policies and procedures on types and categories of offenses investigated by Military Police and DA Civilian detectives/ investigators.
Availability of Non-Exclusive, Exclusive License or Partially Exclusive Licensing of U.S. Patent Concerning Method and Apparatus for Making Body Heating and Cooling Garments
Document Number: 05-12309
Type: Notice
Date: 2005-06-22
Agency: Department of Defense, Department of the Army, Army Department
In accordance with 37 CFR Part 404.6, announcement is made of the availability for licensing of U.S. Patent No. US 6,901,608 B2 entitled ``Method and Apparatus for Making Body Heating and Cooling Garments'' issued June 7, 2005. This patent has been assigned to the United States Government as represented by the Secretary of the Army.
Availability for Non-Exclusive, Exclusive, or Partially Exclusive Licensing of U.S. Provisional Patent Application Concerning Development of a Biosensor for Anthrax Therapeutics and Diagnostics
Document Number: 05-12308
Type: Notice
Date: 2005-06-22
Agency: Department of Defense, Department of the Army, Army Department
In accordance with 37 CFR 404.6 and 404.7, announcement is made of the availability for licensing of the invention set forth in U.S. Provisional Patent Application Serial No. 60/653,230 entitled ``Development of a Biosensor for Anthrax Therapeutics and Diagnostics, filed February 14, 2005. The United States Government, as represented by the Secretary of the Army, has rights in this invention.
Availability of Draft General Reevaluation Report and Supplemental Environmental Impact Statement for the Poplar Island Environmental Restoration Project, Talbot County, MD
Document Number: 05-12307
Type: Notice
Date: 2005-06-22
Agency: Department of Defense, Department of the Army, Corps of Engineers, Engineers Corps, Army Department
In accordance with the requirements of the National Environmental Policy Act (NEPA), the U.S. Army Corps of Engineers (USACE), Baltimore District has prepared a Draft General Reevaluation Report (GRR) and Supplemental Environmental Impact Statement (SEIS) for the Poplar Island Environmental Restoration Project (PIERP) to evaluate the vertical and/or lateral expansion of the PIERP, design modifications to the existing project, the addition of recreational/ educational opportunities to the existing project, and the potential to accept dredged material from additional channels not specified in the 1996 EIS for the existing project. The preferred alternative includes a northern lateral expansion consisting of approximately 575 acres, of which 60% will be wetland habitat and 40% upland habitat; construction of a 5-ft vertical raising of the existing upland Cells 2 and 6 at the PIERP; amending the existing project authorization and Project Cooperation Agreement (PCA) to include the placement of dredged material from the southern approach channels to the Chesapeake and Delaware (C&D) Canal and other small Federal navigation projects; incorporation of design modifications required for the completion of the existing project, and development of recreational and educational enhancements for the PIERP. The Corps is making the Draft integrated GRR/SEIS available to the public for a 45- day review and comment period.
Reserve Officers' Training Corps (ROTC) Program Subcommittee
Document Number: 05-12305
Type: Notice
Date: 2005-06-22
Agency: Department of Defense, Department of the Army, Army Department
In accordance with Section 10(a)(2) of the Federal Advisory Committee Act (5 U.S.C., App. 2), announcement is made of the following Committee meeting:
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.