Tennessee Valley Authority August 17, 2006 – Federal Register Recent Federal Regulation Documents

Notice of Consideration of Standards
Document Number: E6-13557
Type: Notice
Date: 2006-08-17
Agency: Tennessee Valley Authority, Agencies and Commissions
The Tennessee Valley Authority (TVA) is considering adopting for itself and the distributors of TVA power certain metering and interconnection standards. The standards being considered are the Time- based Metering & Communications (hereinafter called ``Smart Metering''), Interconnection, and Net Metering standards listed in section 111(d) of the Public Utility Regulatory Act of 1978 (Pub. L. 95-617) as amended by the Energy Policy Act of 2005 (Pub. L. 109-58). The standards will be considered on the basis of their effect on conservation of energy, efficient use of facilities and resources, equity among electric consumers, and the objectives of the Tennessee Valley Authority Act. In addition, the Smart Metering standard will be considered in light of whether the benefits to the electric utility and its consumers are likely to exceed the costs of new metering and communications. Comments are requested from the public on whether TVA should adopt these standards or any variations on them.
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.