Nuclear Regulatory Commission September 2024 – Federal Register Recent Federal Regulation Documents

Regulatory Guide: Monitoring of Combustible Gases and Vapors in Plutonium Processing and Fuel Fabrication Plants
Document Number: 2024-22246
Type: Rule
Date: 2024-09-30
Agency: Nuclear Regulatory Commission, Agencies and Commissions
The U.S. Nuclear Regulatory Commission (NRC) is issuing Revision 1 to Regulatory Guide (RG) 3.7, "Monitoring of Combustible Gases and Vapors in Plutonium Processing and Fuel Fabrication Plants," in which there are minor corrections with no substantive changes in the NRC staff's regulatory positions. RG 3.7 provides guidance with regard to protecting against the possibility of the formation of flammable mixtures with combustible gases and vapors. This guidance is needed to protect against the possibility of the formation of flammable mixtures with these gases and vapors when combustible gases and solvents are used within the confinement barriers of a plutonium processing and fuel fabrication plant.
Sunshine Act Meetings
Document Number: 2024-22409
Type: Notice
Date: 2024-09-27
Agency: Nuclear Regulatory Commission, Agencies and Commissions
Interim Staff Guidance: Radiological Survey and Dose Modeling of the Subsurface To Support License Termination
Document Number: 2024-22117
Type: Notice
Date: 2024-09-27
Agency: Nuclear Regulatory Commission, Agencies and Commissions
The U.S. Nuclear Regulatory Commission (NRC) is issuing the Division of Decommissioning, Uranium Recovery, and Waste Programs (DUWP), Interim Staff Guidance (ISG), DUWP-ISG-02, "Radiological Survey and Dose Modeling of the Subsurface to Support License Termination." The purpose of this ISG is to provide guidance on surveys of open surfaces in the subsurface, including open excavations, materials planned for reuse, and substructures. This ISG also provides guidance on the use of commonly used decommissioning dose modeling codes for submerged and partially submerged substructures to develop clean-up levels, and on methods to evaluate risk from existing groundwater contamination. This ISG supplements guidance found in NUREG-1757, Volume 2, Revision 2, which pertains to licensees subject to the license termination rule found in NRC regulations. This ISG is intended for use by applicants, licensees, and NRC staff. The guidance is also available to Agreement States and the public.
Draft Interim Staff Guidance: Contamination Control, Radiological Survey, and Dose Modeling Considerations To Support License Termination at Sites With Environmental Discrete Radioactive Particle Contamination
Document Number: 2024-22003
Type: Notice
Date: 2024-09-26
Agency: Nuclear Regulatory Commission, Agencies and Commissions
The U.S. Nuclear Regulatory Commission (NRC) is soliciting public comment on its draft Interim Staff Guidance (ISG), DUWP-ISG-03, "Draft Interim Staff Guidance on Contamination Control, Radiological Survey, and Dose Modeling Considerations to Support License Termination at Sites with Environmental Discrete Radioactive Particle Contamination." The draft ISG addresses contamination control, radiological surveys, and dose modeling regarding discrete radioactive particles (DRPs) that are found in the environment due to an unplanned release or that potentially could be released to the environment during decommissioning. If finalized, this ISG would allow staff to develop consistent guidance regarding contamination control, particularly focused on non-diffuse contamination, during the decommissioning process, as well as provide acceptable survey approaches and dose methods for discrete radioactive particles until the appropriate NRC regulatory guidance can be updated.
NRC Implementation of the Accelerating Deployment of Versatile, Advanced Nuclear for Clean Energy Act of 2024
Document Number: 2024-22052
Type: Notice
Date: 2024-09-26
Agency: Nuclear Regulatory Commission, Agencies and Commissions
The U.S. Nuclear Regulatory Commission (NRC) is implementing the requirements in the Accelerating Deployment of Versatile, Advanced Nuclear for Clean Energy Act of 2024 (the ADVANCE Act, or the Act). The NRC plans to hold public meetings periodically to support the NRC's implementation of the ADVANCE Act.
Vistra Operations Company, LLC; Beaver Valley Power Station, Units 1 and 2; Davis-Besse Nuclear Power Station, Unit 1; Perry Nuclear Power Plant, Unit 1; Exemption
Document Number: 2024-21856
Type: Notice
Date: 2024-09-25
Agency: Nuclear Regulatory Commission, Agencies and Commissions
The U.S. Nuclear Regulatory Commission (NRC) is granting an exemption in response to a request dated February 23, 2024, as supplemented on August 15, 2024, seeking an exemption from specific regulations that require periodic updates to the Updated Final Safety Analysis Reports (UFSARs) for the Beaver Valley Power Station (BVPS), Units 1 and 2, Davis-Bess Nuclear Power Station, (DBNPS) Unit 1, and Perry Nuclear Power Plant (PNPP), Unit 1. The initial request was submitted by Energy Harbor Nuclear Corp. Effective March 1, 2024, the facility operating licenses for BVPS, Units 1 and 2, DBNPS, Unit 1, and PNPP, Unit 1, were transferred from Energy Harbor Nuclear Corp. (operator) to Vistra Operations Company, LLC (operator). The ownership of these units by Energy Harbor Nuclear Generation, LLC was not affected by the transfer. Upon completion of this license transfer, Vistra Operations Company, LLC assumed the responsibility for all licensing actions under NRC review at the time of the transfer and requested that the NRC continue its review of these actions.
American Society of Mechanical Engineers 2021-2022 Code Editions; Correction
Document Number: 2024-21779
Type: Rule
Date: 2024-09-24
Agency: Nuclear Regulatory Commission, Agencies and Commissions
The U.S. Nuclear Regulatory Commission (NRC) is correcting a final rule that was published in the Federal Register on August 30, 2024, regarding the amendment of NRC's regulations to incorporate by reference the 2021 Edition of the American Society of Mechanical Engineers Boiler and Pressure Vessel Code and the 2022 Edition of the American Society of Mechanical Engineers Operation and Maintenance of Nuclear Power Plants, Division 1, OM Code: Section IST, for nuclear power plants. This action is necessary to correct inadvertent errors in the final rule. These corrections do not result in any substantive changes to the final rule.
Abilene Christian University; Molten Salt Research Reactor; Construction Permit
Document Number: 2024-21468
Type: Notice
Date: 2024-09-20
Agency: Nuclear Regulatory Commission, Agencies and Commissions
The U.S. Nuclear Regulatory Commission (NRC) is providing notice of the issuance of Construction Permit No. CPRR-124 to Abilene Christian University (ACU).
Florida Power and Light Company; Turkey Point Nuclear Generating, Unit Nos. 3 and 4; Exemption
Document Number: 2024-21500
Type: Notice
Date: 2024-09-20
Agency: Nuclear Regulatory Commission, Agencies and Commissions
The U.S. Nuclear Regulatory Commission (NRC) has issued an exemption in response to a November 15, 2023, request from Florida Power and Light Company from certain requirements of NRC regulations to use AXIOM[supreg] fuel rod cladding at Turkey Point Nuclear Generating, Unit Nos. 3 and 4. Current NRC regulations limit applicability to the use of fuel rod cladding with zircaloy or ZIRLOTM.
Sunshine Act Meetings
Document Number: 2024-21720
Type: Notice
Date: 2024-09-20
Agency: Nuclear Regulatory Commission, Agencies and Commissions
719th Meeting of the Advisory Committee on Reactor Safeguards (ACRS)
Document Number: 2024-20941
Type: Notice
Date: 2024-09-19
Agency: Nuclear Regulatory Commission, Agencies and Commissions
Returning a Decommissioning Plant to Operating Status
Document Number: 2024-20936
Type: Proposed Rule
Date: 2024-09-19
Agency: Nuclear Regulatory Commission, Agencies and Commissions
The U.S. Nuclear Regulatory Commission (NRC) has received a petition for rulemaking from Alan Blind and Roger Rapoport, dated July 1, 2024, requesting that the NRC revise its regulations to include a Commission-approved process for returning a decommissioning plant to operational status. The petition was docketed by the NRC on July 23, 2024, and has been assigned Docket No. PRM-50-125. The NRC is examining the issues raised in PRM-50-125 to determine whether they should be considered in rulemaking. The NRC is requesting public comment on this petition at this time.
American Centrifuge Operating, LLC; American Centrifuge Plant; Environmental Assessment and Finding of No Significant Impact
Document Number: 2024-21276
Type: Notice
Date: 2024-09-19
Agency: Nuclear Regulatory Commission, Agencies and Commissions
The U.S. Nuclear Regulatory Commission (NRC) is considering an amendment of Special Nuclear Material (SNM) License No. SNM-2011, issued on April 13, 2007, to American Centrifuge Operating, LLC (ACO) for the operation of the American Centrifuge Plant (ACP). This proposed amendment would increase ACO's licensed material possession limits under the high-assay, low-enriched uranium (HALEU) demonstration and operations program to support production of approximately 1,400 kilograms (kg) of HALEU in the form of uranium hexafluoride (UF6). For this proposed action, the NRC staff is issuing an environmental assessment (EA) and finding of no significant impact (FONSI).
Vistra Operations Company LLC; Comanche Peak Nuclear Power Plant, Unit Nos. 1 and 2; Exemption
Document Number: 2024-21226
Type: Notice
Date: 2024-09-18
Agency: Nuclear Regulatory Commission, Agencies and Commissions
The U.S. Nuclear Regulatory Commission (NRC) is granting an exemption in response to a request from Vistra Operations Company LLC (the licensee), submitted by letter dated August 24, 2023, as supplemented by letter dated August 15, 2024, seeking exemption from specific regulations that require periodic updates of the Comanche Peak Nuclear Power Plant, Unit Nos. 1 and 2, Updated Final Safety Analysis Report.
Issuance of Exemption Regarding Security Notifications, Reports, and Recordkeeping
Document Number: 2024-21153
Type: Notice
Date: 2024-09-18
Agency: Nuclear Regulatory Commission, Agencies and Commissions
The U.S. Nuclear Regulatory Commission (NRC) is issuing a notice to announce the issuance of an exemption in response to a request from Pacific Gas and Electric Company. This exemption was requested as a result of a change to NRC's regulations published in the Federal Register on March 14, 2023.
Information Collection: Visitor Access Request System (VARS)
Document Number: 2024-21115
Type: Notice
Date: 2024-09-17
Agency: Nuclear Regulatory Commission, Agencies and Commissions
The U.S. Nuclear Regulatory Commission (NRC) invites public comment on this proposed information collection. The information collection is entitled, "Visitor Access Request System (VARS)."
Sunshine Act Meetings
Document Number: 2024-21064
Type: Notice
Date: 2024-09-16
Agency: Nuclear Regulatory Commission, Agencies and Commissions
Southern Nuclear Operating Company; Vogtle Electric Generating Plant, Units 3 and 4; Exemption
Document Number: 2024-20972
Type: Notice
Date: 2024-09-16
Agency: Nuclear Regulatory Commission, Agencies and Commissions
The U.S. Nuclear Regulatory Commission (NRC) is granting an exemption in response to a request dated March 22, 2024, as supplemented by letter dated August 14, 2024, from Southern Nuclear Operating Company, Inc. (SNC, the licensee), seeking an exemption from specific regulations that require periodic updates of the Vogtle Electric Generating Plant, Units 3 and 4, Updated Final Safety Analysis Reports.
Kairos Power LLC; Notice of Hearing
Document Number: 2024-20812
Type: Notice
Date: 2024-09-12
Agency: Nuclear Regulatory Commission, Agencies and Commissions
The U.S. Nuclear Regulatory Commission (NRC or the Commission) will commence an uncontested hearing, in which the Commission will receive written evidence in the form of testimony and exhibits regarding the application from Kairos Power LLC (Kairos) for a construction permit (CP) to construct a non-power test reactor termed Hermes 2 in Oak Ridge, Tennessee.
Virginia Electric and Power Company; North Anna Power Station, Units 1 and 2; Subsequent License Renewal and Record of Decision
Document Number: 2024-20277
Type: Notice
Date: 2024-09-10
Agency: Nuclear Regulatory Commission, Agencies and Commissions
The U.S. Nuclear Regulatory Commission (NRC) has issued Subsequent Renewed Facility Operating License Nos. NPF-4 and NPF-7 to Virginia Electric and Power Company (Dominion, or the licensee), for North Anna Power Station, Units 1 and 2, respectively. In addition, the NRC has prepared a record of decision (ROD) that supports the NRC's decision to issue Subsequent Renewed Facility Operating License Nos. NPF-4 and NPF-7.
Regulatory Guide: Physical Security Event Notifications, Reports, and Records
Document Number: 2024-20353
Type: Rule
Date: 2024-09-10
Agency: Nuclear Regulatory Commission, Agencies and Commissions
The U.S. Nuclear Regulatory Commission (NRC) is issuing Revision 3 to Regulatory Guide (RG), 5.62, "Physical Security Event Notifications, Reports, and Records." This RG clarifies reporting and recording of security events and conditions adverse to security under NRC's regulations concerning the physical protection of plants and materials.
Sunshine Act Meetings
Document Number: 2024-20310
Type: Notice
Date: 2024-09-09
Agency: Nuclear Regulatory Commission, Agencies and Commissions
Energy Harbor Corp.; Energy Harbor Generation LLC.; Energy Harbor Nuclear Corp.; Perry Nuclear Power Plant, Unit 1; Draft Supplemental Environmental Impact Statement
Document Number: 2024-20080
Type: Notice
Date: 2024-09-06
Agency: Nuclear Regulatory Commission, Agencies and Commissions
The U.S. Nuclear Regulatory Commission (NRC) is issuing for public comment draft Supplement 61, to the Generic Environmental Impact Statement (GEIS) for License Renewal of Nuclear Plants, NUREG-1437, regarding the proposed renewal of Renewed Facility Operating License No. NPF-58 for an additional 20 years of operation for Perry Nuclear Power Plant, Unit 1 (Perry Plant). Perry Plant is located in Perry, Ohio, approximately 35 miles northeast of Cleveland, OH. Possible alternatives to the proposed action of license renewal include no action and reasonable replacement power alternatives.
List of Approved Spent Fuel Storage Casks: NAC International, Inc. MAGNASTOR® Storage System, Certificate of Compliance No. 1031, Amendment No. 13
Document Number: 2024-19894
Type: Rule
Date: 2024-09-05
Agency: Nuclear Regulatory Commission, Agencies and Commissions
The U.S. Nuclear Regulatory Commission (NRC) is amending its spent fuel storage regulations by revising the NAC International, Inc. MAGNASTOR[supreg] Storage System listing within the "List of approved spent fuel storage casks" to include Amendment No. 13 to Certificate of Compliance No. 1031. Amendment No. 13 revises the certificate of compliance to add a new type of radioactive contents to be stored inside the MAGNASTOR[supreg] transportable storage canister, add a new design configuration for the canister to accommodate the fuel bearing material and new canister components, and use an alternate compressive strength for concrete cask no. 6 of 6,000 psi.
Kairos Power, LLC; Hermes 2; Environmental Assessment, Finding of No Significant Impact, and Exemptions
Document Number: 2024-19914
Type: Notice
Date: 2024-09-05
Agency: Nuclear Regulatory Commission, Agencies and Commissions
The U.S. Nuclear Regulatory Commission (NRC) is issuing an environmental assessment (EA) and finding of no significant impact (FONSI) regarding the NRC's consideration of issuance of a construction permit (CP) to Kairos Power, LLC (Kairos, the applicant) for the proposed Hermes 2 test reactor facility located in Oak Ridge, Tennessee. If approved, the CP would authorize the construction of two fluoride-salt cooled, high- temperature reactors that use solid tri-structural isotropic fuel in pebble form, intermediate liquid-sodium loops, and a common power conversion unit. In addition, the NRC is issuing exemptions from certain NRC requirements which state that the NRC staff shall prepare and issue an environmental impact statement (EIS) to support the issuance of a CP for a testing facility. The NRC is granting the exemptions and issuing the EA and FONSI concurrently to satisfy its obligations under the National Environmental Policy Act of 1969 (NEPA) and requirements under NRC regulations, related to the proposed action.
List of Approved Spent Fuel Storage Casks: NAC International, Inc. MAGNASTOR® Storage System, Certificate of Compliance No. 1031, Amendment No. 13
Document Number: 2024-19895
Type: Proposed Rule
Date: 2024-09-05
Agency: Nuclear Regulatory Commission, Agencies and Commissions
The U.S. Nuclear Regulatory Commission (NRC) is proposing to amend its spent fuel storage regulations by revising the NAC International, Inc. MAGNASTOR[supreg] Storage System listing within the "List of approved spent fuel storage casks" to include Amendment No. 13 to Certificate of Compliance No. 1031. Amendment No. 13 would revise the certificate of compliance to add a new type of radioactive contents to be stored inside the MAGNASTOR[supreg] transportable storage canister, add a new design configuration for the canister to accommodate the fuel bearing material and new canister components, and use an alternate compressive strength for concrete cask number 6 of 6,000 psi.
List of Approved Spent Fuel Storage Casks: Holtec International HI-STORM 100 Cask System Certificate of Compliance No. 1014, Renewed Amendment No. 18
Document Number: 2024-19802
Type: Proposed Rule
Date: 2024-09-05
Agency: Nuclear Regulatory Commission, Agencies and Commissions
The U.S. Nuclear Regulatory Commission (NRC) is proposing to amend its spent fuel regulations by revising the Holtec International HI-STORM 100 Cask System listing within the "List of approved spent fuel storage casks" to include Renewed Amendment No. 18 to Certificate of Compliance No. 1014. Renewed Amendment No. 18 would amend the certificate of compliance to incorporate the Holtec Report No. HI- 2200343-A entitled, "Topical Report for Allowance of Heat Load Patterns in HI-STORM 100 and HI-STORM FW Systems."
List of Approved Spent Fuel Storage Casks: Holtec International HI-STORM 100 Cask System, Certificate of Compliance No. 1014, Renewed Amendment No. 18
Document Number: 2024-19801
Type: Rule
Date: 2024-09-05
Agency: Nuclear Regulatory Commission, Agencies and Commissions
The U.S. Nuclear Regulatory Commission (NRC) is amending its spent fuel storage regulations by revising the Holtec International HI- STORM 100 Cask System listing within the "List of approved spent fuel storage casks" to include Renewed Amendment No. 18 to Certificate of Compliance No. 1014. Renewed Amendment No. 18 amends the certificate of compliance to incorporate the Holtec Report No. HI-2200343-A entitled, "Topical Report for Allowance of Heat Load Patterns in HI-STORM 100 and HI-STORM FW Systems."
Accelerated Decommissioning Partners Crystal River Unit 3, LLC; Crystal River Unit 3 Nuclear Generating Plant; License Amendment Application; Withdrawal by Applicant
Document Number: 2024-19800
Type: Notice
Date: 2024-09-04
Agency: Nuclear Regulatory Commission, Agencies and Commissions
The U.S. Nuclear Regulatory Commission (NRC) has granted the request of Accelerated Decommissioning Partners Crystal River Unit 3, LLC (ADP CR3, the licensee) to withdraw its application dated December 12, 2022, for a proposed amendment to Facility Operating License No. DPR-72. The proposed amendment would have added a license condition to include the License Termination Plan for the Crystal River Unit 3 Nuclear Generating Plant.
Application for Amendment to Facility Operating Licenses Involving Proposed No Significant Hazards Consideration Determination and Containing Sensitive Unclassified Non-Safeguards Information and Order Imposing Procedures for Access to Sensitive Unclassified Non-Safeguards Information
Document Number: 2024-18833
Type: Notice
Date: 2024-09-03
Agency: Nuclear Regulatory Commission, Agencies and Commissions
The U.S. Nuclear Regulatory Commission (NRC) received and is considering approval of one amendment request. The amendment request is for Hope Creek Generating Station, Unit 1. For the amendment request, the NRC proposes to determine that it involves no significant hazards consideration (NSHC). Because the amendment request contains sensitive unclassified non-safeguards information (SUNSI), an order imposes procedures to obtain access to SUNSI for contention preparation by persons who file a hearing request or petition for leave to intervene.
Pacific Gas & Electric Company; Diablo Canyon Power Plant, Unit Nos. 1 and 2; Petition
Document Number: 2024-19630
Type: Notice
Date: 2024-09-03
Agency: Nuclear Regulatory Commission, Agencies and Commissions
The U.S. Nuclear Regulatory Commission (NRC) is giving notice that by petition dated March 4, 2024, as supplemented on June 7, 2024, San Luis Obispo Mothers for Peace, Friends of the Earth, and Environmental Working Group (the petitioners) requested that the NRC exercise its supervisory authority to order the immediate closure of Diablo Canyon Nuclear Power Plant, Unit Nos. 1 and 2 (Diablo Canyon) due to "the unacceptable risk of a seismically induced severe accident." The Commission referred the request to the enforcement petition process under NRC regulations. The petitioners' request is included in the SUPPLEMENTARY INFORMATION section of this document.
Monthly Notice; Applications and Amendments to Facility Operating Licenses and Combined Licenses Involving No Significant Hazards Considerations
Document Number: 2024-19687
Type: Notice
Date: 2024-09-03
Agency: Nuclear Regulatory Commission, Agencies and Commissions
Pursuant to section 189a.(2) of the Atomic Energy Act of 1954, as amended (the Act), the U.S. Nuclear Regulatory Commission (NRC) is publishing this regular monthly notice. The Act requires the Commission to publish notice of any amendments issued, or proposed to be issued, and grants the Commission the authority to issue and make immediately effective any amendment to an operating license or combined license, as applicable, upon a determination by the Commission that such amendment involves no significant hazards consideration (NSHC), notwithstanding the pendency before the Commission of a request for a hearing from any person.
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.