Nuclear Regulatory Commission December 29, 2023 – Federal Register Recent Federal Regulation Documents
Results 1 - 3 of 3
Holtec Decommissioning International, LLC, Holtec Indian Point 2, LLC, and Holtec Indian Point 3, LLC; Indian Point Nuclear Energy Center; Exemption
The U.S. Nuclear Regulatory Commission (NRC) has issued exemptions in response to a request from Holtec Decommissioning International, LLC that would permit it, Holtec Indian Point 2, LLC, and Holtec Indian Point 3, LLC, to reduce certain emergency planning (EP) requirements. The exemptions eliminate the requirements to maintain an offsite radiological emergency preparedness plan and reduce the scope of onsite EP activities at the Indian Point Nuclear Generating Unit Nos. 1, 2, and 3, collectively referred to as the Indian Point Energy Center (IPEC), based on the reduced risks of accidents that could result in an offsite radiological release at a decommissioning nuclear power reactor.
Holtec Decommissioning International, LLC, Holtec Indian Point 2, LLC, and Holtec Indian Point 3, LLC; Indian Point Energy Center; Exemption
The U.S. Nuclear Regulatory Commission (NRC) has issued an exemption in response to a request from Holtec Decommissioning International, LLC that would permit it, Holtec Indian Point 2, LLC, and Holtec Indian Point 3, LLC, to reduce the minimum coverage limit for onsite property damage insurance from $1.06 billion to $50 million for the Indian Point Nuclear Generating Unit Nos. 1, 2, and 3, collectively referred to as the Indian Point Energy Center (IPEC).
Holtec Decommissioning International, LLC, Holtec Indian Point 2, LLC, and Holtec Indian Point 3, LLC; Indian Point Energy Center; Exemption
The U.S. Nuclear Regulatory Commission (NRC) has issued an exemption in response to a request from Holtec Decommissioning International, LLC that would permit it, Holtec Indian Point 2, LLC, and Holtec Indian Point 3, LLC, to reduce the required level of primary offsite liability insurance from $450 million to $100 million and to eliminate the requirement to carry secondary financial protection for the Indian Point Nuclear Generating Unit Nos. 1, 2, and 3, collectively referred to as the Indian Point Energy Center (IPEC).
This site is protected by reCAPTCHA and the Google
Privacy Policy and
Terms of Service apply.