Nuclear Regulatory Commission April 28, 2017 – Federal Register Recent Federal Regulation Documents

Sunshine Act Meeting Notice
Document Number: 2017-08793
Type: Notice
Date: 2017-04-28
Agency: Nuclear Regulatory Commission, Agencies and Commissions
South Carolina Electric & Gas Company, South Carolina Public Service Authority; Virgil C. Summer Nuclear Station, Units 2 and 3; Design Reliability Assurance Program (D-RAP) Changes
Document Number: 2017-08633
Type: Notice
Date: 2017-04-28
Agency: Nuclear Regulatory Commission, Agencies and Commissions
The U.S. Nuclear Regulatory Commission (NRC) is granting an exemption to allow a departure from the certification information of Tier 1 of the generic design control document (DCD) and is issuing License Amendment No. 70 to Combined Licenses (COLs), NPF-93 and NPF- 94. The COLs were issued to South Carolina Electric & Gas Company and the South Carolina Public Service Authority, (together referred to as the licensee); for construction and operation of the Virgil C. Summer Nuclear Station (VCSNS) Units 2 and 3, located in Fairfield County, South Carolina. The granting of the exemption allows the changes to Tier 1 information asked for in the amendment. Because the acceptability of the exemption was determined in part by the acceptability of the amendment, the exemption and amendment are being issued concurrently.
South Carolina Electric & Gas Company, South Carolina Public Service Authority, Virgil C. Summer Nuclear Station, Units 2 and 3, Inspections, Tests, Analyses, and Acceptance Criteria
Document Number: 2017-08618
Type: Notice
Date: 2017-04-28
Agency: Nuclear Regulatory Commission, Agencies and Commissions
The U.S. Nuclear Regulatory Commission (NRC) staff has determined that the inspections, tests, and analyses have been successfully completed, and that the specified acceptance criteria are met for multiple inspections, tests, analyses, and acceptance criteria (ITAAC) for the Virgil C. Summer Nuclear Station (VCSNS), Units 2 and 3.
Southern Nuclear Operating Company, Inc. Vogtle Electric Generating Plant, Units 3 and 4 Inspections, Tests, Analyses, and Acceptance Criteria
Document Number: 2017-08616
Type: Notice
Date: 2017-04-28
Agency: Nuclear Regulatory Commission, Agencies and Commissions
The U.S. Nuclear Regulatory Commission (NRC) staff has determined that the inspections, tests, and analyses have been successfully completed, and that the specified acceptance criteria are met for multiple inspections, tests, analyses, and acceptance criteria (ITAAC) for the Vogtle Electric Generating Plant (VEGP), Units 3 and 4.
Virgil C. Summer Nuclear Station, Units 2 and 3; South Carolina Electric & Gas Company; South Carolina Public Service Authority Debris Screen Related Dimensions
Document Number: 2017-08615
Type: Notice
Date: 2017-04-28
Agency: Nuclear Regulatory Commission, Agencies and Commissions
The U.S. Nuclear Regulatory Commission (NRC) is granting an exemption to allow a departure from the certification information of Tier 1 of the generic design control document (DCD) and is issuing License Amendment No. 66 to Combined Licenses (COL), NPF-93 and NPF-94. The COLs were issued to South Carolina Electric & Gas Company and the South Carolina Public Service Authority, (both collectively referred to as the licensee) for construction and operation of the Virgil C. Summer Nuclear Station (VCSNS) Units 2 and 3, located in Fairfield County, South Carolina. The granting of the exemption allows the changes to Tier 1 information asked for in the amendment. Because the acceptability of the exemption was determined in part by the acceptability of the amendment, the exemption and amendment are being issued concurrently.
Pacific Gas and Electric Company
Document Number: 2017-08609
Type: Notice
Date: 2017-04-28
Agency: Nuclear Regulatory Commission, Agencies and Commissions
The U.S. Nuclear Regulatory Commission (NRC) has issued a director's decision with regard to a Petition to Intervene and Request for Hearing concerning Diablo Canyon Power Plant (DCPP) dated August 26, 2014, filed by Friends of the Earth (FOE or petitioner), asserting, in part, its concerns about DCPP's operational safety and ability to safely shut down in the event of a nearby earthquake. The petitioner's requests and the director's decision are included in the SUPPLEMENTARY INFORMATION section of this document.
Advisory Committee on Reactor Safeguards (ACRS); Meeting of the ACRS Subcommittee on NuScale; Notice of Meeting
Document Number: 2017-08607
Type: Notice
Date: 2017-04-28
Agency: Nuclear Regulatory Commission, Agencies and Commissions