South Carolina Electric & Gas Company, South Carolina Public Service Authority, Virgil C. Summer Nuclear Station, Units 2 and 3, Inspections, Tests, Analyses, and Acceptance Criteria, 19757-19758 [2017-08618]
Download as PDF
Federal Register / Vol. 82, No. 81 / Friday, April 28, 2017 / Notices
NUCLEAR REGULATORY
COMMISSION
[Docket Nos. 52–027 and 52–028; NRC–
2008–0441]
South Carolina Electric & Gas
Company, South Carolina Public
Service Authority, Virgil C. Summer
Nuclear Station, Units 2 and 3,
Inspections, Tests, Analyses, and
Acceptance Criteria
Nuclear Regulatory
Commission.
ACTION: Determination of the successful
completion of inspections, tests, and
analyses.
AGENCY:
The U.S. Nuclear Regulatory
Commission (NRC) staff has determined
that the inspections, tests, and analyses
have been successfully completed, and
that the specified acceptance criteria are
met for multiple inspections, tests,
analyses, and acceptance criteria
(ITAAC) for the Virgil C. Summer
Nuclear Station (VCSNS), Units 2 and 3.
DATES: The determination of the
successful completion of inspections,
tests, and analyses for these ITAAC for
VCSNS, Units 2 and 3 is effective April
28, 2017.
ADDRESSES: Please refer to Docket ID
NRC–2008–0441 when contacting the
NRC about the availability of
information regarding this document.
You may obtain publicly-available
information related to this document
using any of the following methods:
• Federal Rulemaking Web site: Go to
https://www.regulations.gov and search
for Docket ID NRC–2008–0441. Address
questions about NRC dockets to Carol
Gallagher; telephone: 301–415–3463;
email: Carol.Gallagher@nrc.gov. For
technical questions, contact the
individual listed in the FOR FURTHER
INFORMATION CONTACT section of this
document.
• NRC’s Agencywide Documents
Access and Management System
(ADAMS): You may obtain publicly
available documents online in the
ADAMS Public Documents collection at
https://www.nrc.gov/reading-rm/
adams.html. To begin the search, select
‘‘ADAMS Public Documents’’ and then
select ‘‘Begin Web-based ADAMS
Search.’’ For problems with ADAMS,
please contact the NRC’s Public
Document Room (PDR) reference staff at
1–800–397–4209, 301–415–4737, or by
email to pdr.resource@nrc.gov. The
ADAMS accession number for each
document referenced in this document
(if that document is available in
ADAMS) is provided the first time that
a document is referenced.
asabaliauskas on DSK3SPTVN1PROD with NOTICES
SUMMARY:
VerDate Sep<11>2014
17:38 Apr 27, 2017
Jkt 241001
• NRC’s PDR: You may examine and
purchase copies of public documents at
the NRC’s PDR, Room O1–F21, One
White Flint North, 11555 Rockville
Pike, Rockville, Maryland 20852.
FOR FURTHER INFORMATION CONTACT:
Billy Gleaves, Office of New Reactors,
U.S. Nuclear Regulatory Commission,
Washington, DC 20555–0001; telephone:
301–415–5848; email:
Bill.Gleaves@nrc.gov.
SUPPLEMENTARY INFORMATION:
I. Licensee Notification of Completion
of ITAAC
South Carolina Electric & Gas
(SCE&G), on behalf of itself and the
South Carolina Public Service
Authority, (both hereafter called the
licensee) has submitted ITAAC closure
notifications (ICNs) under title 10 of the
Code of Federal Regulations (10 CFR)
52.99(c)(1), informing the NRC that the
licensee has successfully performed the
required inspections, tests, and
analyses, and that the acceptance
criteria are met for:
VCSNS Unit 2 ITAAC
2.1.01.06.ii (7), 2.1.03.09a.i (81),
2.5.01.03c (513), and C.3.8.01.02.03
(845)
VCSNS Unit 3 ITAAC
2.1.01.06.ii (7), 2.1.03.09a.i (81),
2.5.01.03c (513), 3.3.00.09 (814),
and C.3.8.01.02.03 (845)
The ITAAC for VCSNS Unit 2 are in
Appendix C of the VCSNS Unit 2
combined license (ADAMS Accession
No. ML14100A092). The ITAAC for
VCSNS Unit 3 are in Appendix C of
VCSNS Unit 3 combined license
(ADAMS Accession No. ML14100A101).
II. NRC Staff Determination of
Completion of ITAAC
The NRC staff has determined that the
specified inspections, tests, and
analyses have been successfully
completed, and that the specified
acceptance criteria are met. The
documentation of the NRC staff’s
determination is in the ITAAC Closure
Verification Evaluation Form (VEF) for
each ITAAC. The VEF is a form that
represents the NRC staff’s structured
process for reviewing ICNs. Each ICN
presents a narrative description of how
the ITAAC was completed. The NRC’s
ICN review process involves a
determination on whether, among other
things: (1) Each ICN provides sufficient
information, including a summary of the
methodology used to perform the
ITAAC, to demonstrate that the
inspections, tests, and analyses have
been successfully completed; (2) each
ICN provides sufficient information to
demonstrate that the acceptance criteria
PO 00000
Frm 00106
Fmt 4703
Sfmt 4703
19757
of the ITAAC are met; and (3) any NRC
inspections for the ITAAC have been
completed and any ITAAC findings
associated with that ITAAC have been
closed.
The NRC staff’s determination of the
successful completion of these ITAAC is
based on information available at this
time and is subject to the licensee’s
ability to maintain the condition that
the acceptance criteria are met. If the
staff receives new information that
suggests the staff’s determination on any
of these ITAAC is incorrect, then the
staff will determine whether to reopen
that ITAAC (including withdrawing the
staff’s determination on that ITAAC).
The NRC staff’s determination will be
used to support a subsequent finding,
pursuant to 10 CFR 52.103(g), at the end
of construction that all acceptance
criteria in the combined license are met.
The ITAAC closure process is not
finalized for these ITAAC until the NRC
makes an affirmative finding under 10
CFR 52.103(g). Any future updates to
the status of these ITAAC will be
reflected on the NRC’s Web site at
https://www.nrc.gov/reactors/newreactors/oversight/itaac.html.
This notice fulfills the staff’s
obligations under 10 CFR 52.99(e)(1) to
publish a notice in the Federal Register
of the NRC staff’s determination of the
successful completion of inspections,
tests, and analyses.
Virgil C. Summer Nuclear Station Unit
2, Docket No. 5200027
A complete list of the review status
for VCSNS Unit 2 ITAAC, including the
submission date and ADAMS Accession
Number for each ICN received, the
ADAMS Accession Number for each
VEF, and the ADAMS Accession
Numbers for the inspection reports
associated with these specific ITAAC,
can be found on the NRC’s Web site at
https://www.nrc.gov/reactors/newreactors/new-licensing-files/sum2icnsr.pdf.
Virgil C. Summer Nuclear Station Unit
3, Docket No. 5200028
A complete list of the review status
for VCSNS Unit 3 ITAAC, including the
submission date and ADAMS Accession
Number for each ICN received, the
ADAMS Accession Number for each
VEF, and the ADAMS Accession
Numbers for the inspection reports
associated with these specific ITAAC,
can be found on the NRC’s Web site at
https://www.nrc.gov/reactors/newreactors/new-licensing-files/sum3icnsr.pdf.
Dated at Rockville, Maryland, this 17th day
of April 2017.
E:\FR\FM\28APN1.SGM
28APN1
19758
Federal Register / Vol. 82, No. 81 / Friday, April 28, 2017 / Notices
For the Nuclear Regulatory Commission.
Jennifer Dixon-Herrity,
Chief, Licensing Branch 4, Division of New
Reactor Licensing, Office of New Reactors.
[FR Doc. 2017–08618 Filed 4–27–17; 8:45 am]
BILLING CODE 7590–01–P
NUCLEAR REGULATORY
COMMISSION
[NRC–2017–0001]
Sunshine Act Meeting Notice
Weeks of May 1, 8, 15, 22, 29,
June 5, 2017.
PLACE: Commissioners’ Conference
Room, 11555 Rockville Pike, Rockville,
Maryland.
STATUS: Public and Closed.
DATE:
Week of May 1, 2017
There are no meetings scheduled for
the week of May 1, 2017.
Week of May 8, 2017—Tentative
Tuesday, May 9, 2017
10:00 a.m. Briefing on Security Issues
(Closed Ex. 1).
2:00 p.m. Briefing on Security Issues
(Closed Ex. 1).
Thursday, May 11, 2017
9:00 a.m. Briefing on Risk-Informed
Regulation (Public Meeting);
(Contact: Steve Ruffin: 301–415–
1985).
This meeting will be webcast live at
the Web address—https://www.nrc.gov/.
Week of May 15, 2017—Tentative
There are no meetings scheduled for
the week of May 15, 2017.
Week of May 22, 2017—Tentative
There are no meetings scheduled for
the week of May 22, 2017.
asabaliauskas on DSK3SPTVN1PROD with NOTICES
Week of May 29, 2017—Tentative
There are no meetings scheduled for
the week of May 29, 2017.
Week of June 5, 2017—Tentative
There are no meetings scheduled for
the week of June 5, 2017.
*
*
*
*
*
The schedule for Commission
meetings is subject to change on short
notice. For more information or to verify
the status of meetings, contact Denise
McGovern at 301–415–0681 or via email
at Denise.McGovern@nrc.gov.
*
*
*
*
*
The NRC Commission Meeting
Schedule can be found on the Internet
at: https://www.nrc.gov/public-involve/
public-meetings/schedule.html.
*
*
*
*
*
VerDate Sep<11>2014
17:38 Apr 27, 2017
Jkt 241001
The NRC provides reasonable
accommodation to individuals with
disabilities where appropriate. If you
need a reasonable accommodation to
participate in these public meetings, or
need this meeting notice or the
transcript or other information from the
public meetings in another format (e.g.,
braille, large print), please notify
Kimberly Meyer, NRC Disability
Program Manager, at 301–287–0739, by
videophone at 240–428–3217, or by
email at Kimberly.Meyer-Chambers@
nrc.gov. Determinations on requests for
reasonable accommodation will be
made on a case-by-case basis.
*
*
*
*
*
Members of the public may request to
receive this information electronically.
If you would like to be added to the
distribution, please contact the Nuclear
Regulatory Commission, Office of the
Secretary, Washington, DC 20555 (301–
415–1969), or email
Brenda.Akstulewicz@nrc.gov or
Patricia.Jimenez@nrc.gov.
Dated: April 26, 2017.
Denise L. McGovern,
Policy Coordinator, Office of the Secretary.
[FR Doc. 2017–08793 Filed 4–26–17; 4:15 pm]
BILLING CODE 7590–01–P
NUCLEAR REGULATORY
COMMISSION
[Docket Nos. 52–025 and 52–026; NRC–
2008–0252]
Southern Nuclear Operating Company,
Inc. Vogtle Electric Generating Plant,
Units 3 and 4 Inspections, Tests,
Analyses, and Acceptance Criteria
Nuclear Regulatory
Commission.
ACTION: Determination of the successful
completion of inspections, tests, and
analyses.
AGENCY:
The U.S. Nuclear Regulatory
Commission (NRC) staff has determined
that the inspections, tests, and analyses
have been successfully completed, and
that the specified acceptance criteria are
met for multiple inspections, tests,
analyses, and acceptance criteria
(ITAAC) for the Vogtle Electric
Generating Plant (VEGP), Units 3 and 4.
DATES: The determination of the
successful completion of inspections,
tests, and analyses for these ITAAC for
VEGP, Units 3 and 4 is effective April
28, 2017.
ADDRESSES: Please refer to Docket ID
NRC–2008–0252 when contacting the
NRC about the availability of
information regarding this document.
You may obtain publicly-available
SUMMARY:
PO 00000
Frm 00107
Fmt 4703
Sfmt 4703
information related to this document
using any of the following methods:
• Federal Rulemaking Web site: Go to
https://www.regulations.gov and search
for Docket ID NRC–2008–0252. Address
questions about NRC dockets to Carol
Gallagher; telephone: 301–415–3463;
email: Carol.Gallagher@nrc.gov. For
technical questions, contact the
individual listed in the FOR FURTHER
INFORMATION CONTACT section of this
document.
• NRC’s Agencywide Documents
Access and Management System
(ADAMS): You may obtain publicly
available documents online in the
ADAMS Public Documents collection at
https://www.nrc.gov/reading-rm/
adams.html. To begin the search, select
‘‘ADAMS Public Documents’’ and then
select ‘‘Begin Web-based ADAMS
Search.’’ For problems with ADAMS,
please contact the NRC’s Public
Document Room (PDR) reference staff at
1–800–397–4209, 301–415–4737, or by
email to pdr.resource@nrc.gov. The
ADAMS accession number for each
document referenced in this document
(if that document is available in
ADAMS) is provided the first time that
a document is referenced.
• NRC’s PDR: You may examine and
purchase copies of public documents at
the NRC’s PDR, Room O1–F21, One
White Flint North, 11555 Rockville
Pike, Rockville, Maryland 20852.
FOR FURTHER INFORMATION CONTACT:
Chandu Patel, Office of New Reactors,
U.S. Nuclear Regulatory Commission,
Washington, DC 20555–0001; telephone:
301–415–3025; email: Chandu.Patel@
nrc.gov.
SUPPLEMENTARY INFORMATION:
I. Licensee Notification of Completion
of ITAAC
Southern Nuclear Operating
Company, Inc. (SNC), Georgia Power
Company, Oglethorpe Power
Corporation, MEAG Power SPVM, LLC.,
MEAG Power SPVJ, LLC., MEAG Power
SPVP, LLC., and the City of Dalton,
Georgia, (hereafter called the licensee)
has submitted ITAAC closure
notifications (ICNs) under title 10 of the
Code of Federal Regulations (10 CFR)
52.99(c)(1), informing the NRC that the
licensee has successfully performed the
required inspections, tests, and
analyses, and that the acceptance
criteria are met for:
VEGP Unit 3 ITAAC
2.1.01.07.iii (10), 2.1.02.08d.iv (35),
2.1.03.02c (71), and 2.2.03.08c.xi
(196)
VEGP Unit 4 ITAAC
2.1.01.07.iii (10), 2.1.02.08d.iv (35),
and 2.2.03.08c.xi (196)
E:\FR\FM\28APN1.SGM
28APN1
Agencies
[Federal Register Volume 82, Number 81 (Friday, April 28, 2017)]
[Notices]
[Pages 19757-19758]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2017-08618]
[[Page 19757]]
-----------------------------------------------------------------------
NUCLEAR REGULATORY COMMISSION
[Docket Nos. 52-027 and 52-028; NRC-2008-0441]
South Carolina Electric & Gas Company, South Carolina Public
Service Authority, Virgil C. Summer Nuclear Station, Units 2 and 3,
Inspections, Tests, Analyses, and Acceptance Criteria
AGENCY: Nuclear Regulatory Commission.
ACTION: Determination of the successful completion of inspections,
tests, and analyses.
-----------------------------------------------------------------------
SUMMARY: The U.S. Nuclear Regulatory Commission (NRC) staff has
determined that the inspections, tests, and analyses have been
successfully completed, and that the specified acceptance criteria are
met for multiple inspections, tests, analyses, and acceptance criteria
(ITAAC) for the Virgil C. Summer Nuclear Station (VCSNS), Units 2 and
3.
DATES: The determination of the successful completion of inspections,
tests, and analyses for these ITAAC for VCSNS, Units 2 and 3 is
effective April 28, 2017.
ADDRESSES: Please refer to Docket ID NRC-2008-0441 when contacting the
NRC about the availability of information regarding this document. You
may obtain publicly-available information related to this document
using any of the following methods:
Federal Rulemaking Web site: Go to https://www.regulations.gov and search for Docket ID NRC-2008-0441. Address
questions about NRC dockets to Carol Gallagher; telephone: 301-415-
3463; email: Carol.Gallagher@nrc.gov. For technical questions, contact
the individual listed in the FOR FURTHER INFORMATION CONTACT section of
this document.
NRC's Agencywide Documents Access and Management System
(ADAMS): You may obtain publicly available documents online in the
ADAMS Public Documents collection at https://www.nrc.gov/reading-rm/adams.html. To begin the search, select ``ADAMS Public Documents'' and
then select ``Begin Web-based ADAMS Search.'' For problems with ADAMS,
please contact the NRC's Public Document Room (PDR) reference staff at
1-800-397-4209, 301-415-4737, or by email to pdr.resource@nrc.gov. The
ADAMS accession number for each document referenced in this document
(if that document is available in ADAMS) is provided the first time
that a document is referenced.
NRC's PDR: You may examine and purchase copies of public
documents at the NRC's PDR, Room O1-F21, One White Flint North, 11555
Rockville Pike, Rockville, Maryland 20852.
FOR FURTHER INFORMATION CONTACT: Billy Gleaves, Office of New Reactors,
U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001;
telephone: 301-415-5848; email: Bill.Gleaves@nrc.gov.
SUPPLEMENTARY INFORMATION:
I. Licensee Notification of Completion of ITAAC
South Carolina Electric & Gas (SCE&G), on behalf of itself and the
South Carolina Public Service Authority, (both hereafter called the
licensee) has submitted ITAAC closure notifications (ICNs) under title
10 of the Code of Federal Regulations (10 CFR) 52.99(c)(1), informing
the NRC that the licensee has successfully performed the required
inspections, tests, and analyses, and that the acceptance criteria are
met for:
VCSNS Unit 2 ITAAC
2.1.01.06.ii (7), 2.1.03.09a.i (81), 2.5.01.03c (513), and
C.3.8.01.02.03 (845)
VCSNS Unit 3 ITAAC
2.1.01.06.ii (7), 2.1.03.09a.i (81), 2.5.01.03c (513), 3.3.00.09
(814), and C.3.8.01.02.03 (845)
The ITAAC for VCSNS Unit 2 are in Appendix C of the VCSNS Unit 2
combined license (ADAMS Accession No. ML14100A092). The ITAAC for VCSNS
Unit 3 are in Appendix C of VCSNS Unit 3 combined license (ADAMS
Accession No. ML14100A101).
II. NRC Staff Determination of Completion of ITAAC
The NRC staff has determined that the specified inspections, tests,
and analyses have been successfully completed, and that the specified
acceptance criteria are met. The documentation of the NRC staff's
determination is in the ITAAC Closure Verification Evaluation Form
(VEF) for each ITAAC. The VEF is a form that represents the NRC staff's
structured process for reviewing ICNs. Each ICN presents a narrative
description of how the ITAAC was completed. The NRC's ICN review
process involves a determination on whether, among other things: (1)
Each ICN provides sufficient information, including a summary of the
methodology used to perform the ITAAC, to demonstrate that the
inspections, tests, and analyses have been successfully completed; (2)
each ICN provides sufficient information to demonstrate that the
acceptance criteria of the ITAAC are met; and (3) any NRC inspections
for the ITAAC have been completed and any ITAAC findings associated
with that ITAAC have been closed.
The NRC staff's determination of the successful completion of these
ITAAC is based on information available at this time and is subject to
the licensee's ability to maintain the condition that the acceptance
criteria are met. If the staff receives new information that suggests
the staff's determination on any of these ITAAC is incorrect, then the
staff will determine whether to reopen that ITAAC (including
withdrawing the staff's determination on that ITAAC). The NRC staff's
determination will be used to support a subsequent finding, pursuant to
10 CFR 52.103(g), at the end of construction that all acceptance
criteria in the combined license are met. The ITAAC closure process is
not finalized for these ITAAC until the NRC makes an affirmative
finding under 10 CFR 52.103(g). Any future updates to the status of
these ITAAC will be reflected on the NRC's Web site at https://www.nrc.gov/reactors/new-reactors/oversight/itaac.html.
This notice fulfills the staff's obligations under 10 CFR
52.99(e)(1) to publish a notice in the Federal Register of the NRC
staff's determination of the successful completion of inspections,
tests, and analyses.
Virgil C. Summer Nuclear Station Unit 2, Docket No. 5200027
A complete list of the review status for VCSNS Unit 2 ITAAC,
including the submission date and ADAMS Accession Number for each ICN
received, the ADAMS Accession Number for each VEF, and the ADAMS
Accession Numbers for the inspection reports associated with these
specific ITAAC, can be found on the NRC's Web site at https://www.nrc.gov/reactors/new-reactors/new-licensing-files/sum2-icnsr.pdf.
Virgil C. Summer Nuclear Station Unit 3, Docket No. 5200028
A complete list of the review status for VCSNS Unit 3 ITAAC,
including the submission date and ADAMS Accession Number for each ICN
received, the ADAMS Accession Number for each VEF, and the ADAMS
Accession Numbers for the inspection reports associated with these
specific ITAAC, can be found on the NRC's Web site at https://www.nrc.gov/reactors/new-reactors/new-licensing-files/sum3-icnsr.pdf.
Dated at Rockville, Maryland, this 17th day of April 2017.
[[Page 19758]]
For the Nuclear Regulatory Commission.
Jennifer Dixon-Herrity,
Chief, Licensing Branch 4, Division of New Reactor Licensing, Office of