PPL Bell Bend, LLC; Combined License Application for Bell Bend Nuclear Power Plant
The U.S. Nuclear Regulatory Commission (NRC) is issuing an exemption in a response to a September 24, 2014, letter from PPL Bell Bend, LLC (PPL), which requested an exemption from Final Safety Analysis Report (FSAR) updates included in their Combined License (COL) application. The NRC staff reviewed this request and determined that it is appropriate to grant the exemption, but stipulated that the updates to the FSAR must be submitted prior to, or coincident with, the resumption of the COL application safety review or by December 31, 2015, whichever comes first.
Entergy Nuclear Operations, Inc., James A. Fitzpatrick Nuclear Power Plant
The U.S. Nuclear Regulatory Commission (NRC) has issued a director's decision with regard to a petition dated July 25, 2013, as supplemented on November 13, 2013, filed by Mr. David Lochbaum, (the petitioner), on behalf of Alliance for Green Economy, Beyond Nuclear, Citizens Awareness Network, and Union of Concerned Scientists, requesting that the NRC take action with regard to concerns with the operation of James A. FitzPatrick Nuclear Power Plant (FitzPatrick), owned by Entergy Nuclear Generation Company and operated by Entergy Nuclear Operations, Inc. (Entergy, the licensee). The petitioner's requests and the director's decision are included in the SUPPLEMENTARY INFORMATION section of this document.
Early Site Permit for the PSEG Site
On August 22, 2014, the U.S. Nuclear Regulatory Commission (NRC) and the U.S. Army Corps of Engineers (USACE) published for public comment a draft environmental impact statement (EIS), NUREG-2168, ``Draft Environmental Impact Statement for the Early Site Permit (ESP) for the PSEG Site.'' The PSEG Site is located in Salem County, New Jersey. The public comment period was to have ended on November 6, 2014. The NRC has decided to extend the public comment period for 30 days to allow more time for members of the public to develop and submit their comments.
Dominion Energy Kewaunee, Inc.; Kewaunee Power Station
Kewaunee Power Station (KPS) is a decommissioning nuclear power reactor that permanently shut down on May 7, 2013, and permanently defueled on May 14, 2013. In response to a request from Dominion Energy Kewaunee, Inc. (DEK or the licensee), the U.S. Nuclear Regulatory Commission (NRC) is granting exemptions from certain emergency planning (EP) requirements. The exemptions will eliminate the requirements to maintain offsite radiological emergency plans and reduce the scope of the onsite emergency planning activities at the Kewaunee Power Station (KPS) based on the reduced risks of accidents that could result in an offsite radiological release when compared to operating power reactors. The exemptions will continue to maintain requirements for onsite radiological emergency planning and include provisions for capabilities to communicate and coordinate with offsite response authorities. The NRC staff has concluded that the exemptions being granted by this action will maintain an acceptable level of emergency preparedness at KPS given its permanently shutdown and defueled status, and that there is reasonable assurance that adequate offsite protective measures can and will be taken by State and local government agencies, if needed, in the event of a radiological emergency at the KPS facility.
Definition of a Utilization Facility
The U.S. Nuclear Regulatory Commission (NRC) is correcting the docket identification number and Regulation Identifier Number (RIN) for a Direct Final Rule published in the Federal Register (FR) on October 17, 2014, to amend the NRC's regulations to add SHINE Medical Technologies, Inc.'s accelerator-driven subcritical operating assemblies, as described in the application assigned docket number 50- 608, to the definition of utilization facility.
Definition of a Utilization Facility
The U.S. Nuclear Regulatory Commission (NRC) is correcting the docket identification number and Regulation Identifier Number (RIN) for a Proposed Rule that was published in the Federal Register (FR) on October 17, 2014, to amend the NRC's regulations to add SHINE Medical Technologies, Inc.'s accelerator-driven subcritical operating assemblies, as described in the application assigned docket number 50- 608, to the definition of utilization facility.
Approval of American Society of Mechanical Engineers' Code Cases
The U.S. Nuclear Regulatory Commission (NRC) is amending its regulations to incorporate by reference the latest revisions of three NRC Regulatory Guides (RGs) approving new and revised Code Cases published by the American Society of Mechanical Engineers. This action allows nuclear power plant licensees, and applicants for construction permits, operating licenses, combined licenses, standard design certifications, standard design approvals, and manufacturing licenses, to use the Code Cases listed in these RGs, as alternatives to engineering standards for the construction, inservice inspection, and inservice testing of nuclear power plant components. This final rule changes NRC's regulations to address a petition for rulemaking (PRM), PRM-50-89, submitted by Mr. Raymond West. The final rule also restructures the NRC's requirements governing Codes and standards to align with the Office of the Federal Register's guidelines for incorporating documents by reference. This final rule announces the availability of the final versions of the three RGs that are being incorporated by reference, and a related RG, not incorporated by reference into the NRC's regulations, that lists Code Cases that the NRC has not approved for use. For additional information on these RGs, see Section XVII, Availability of Regulatory Guides, of this document.