Nuclear Regulatory Commission April 30, 2014 – Federal Register Recent Federal Regulation Documents
Results 1 - 5 of 5
DTE Electric Company; Fermi 3
On September 18, 2008, the U.S. Nuclear Regulatory Commission (NRC) received an application for a combined license (COL) submitted by Detroit Edison Company. The NRC published a notice of receipt and availability for an application for a COL in the Federal Register on October 17, 2008. In a letter dated December 21, 2012, the Detroit Edison Company notified the NRC that, effective January 1, 2013, the name of the company would be changed to ``DTE Electric Company.'' This notice is being published to make available to the public the application for a COL submitted by DTE Electric Company (formerly the Detroit Edison Company). This is the fourth of four notices related to this action that will be published in the Federal Register (FR). The first notice was published on April 9, 2014, the second notice was published on April 16, 2014, and the third notice was published on April 23, 2014.
Manual Operator Actions in Diversity and Defense-in-Depth Analyses
The U.S. Nuclear Regulatory Commission (NRC) is issuing a final revision to the following section of NUREG-0800, ``Standard Review Plan for the Review of Safety Analysis Reports for Nuclear Power Plants: LWR Edition,'' Appendix 18-A, ``Guidance for Crediting Manual Operator Actions in Diversity and Defense-in-Depth Analyses.''
Vogtle Electric Generating Plant, Units 3 and 4; Southern Nuclear Operating Company; Turbine Building Battery Room and Electrical Changes
The U.S. Nuclear Regulatory Commission (NRC) is granting an exemption to allow a departure from the certification information of Tier 1 of the generic design control document (DCD) and issuing License Amendment No. 18 to Combined Licenses (COL), NPF-91 and NPF-92. The COLs were issued to Southern Nuclear Operating Company (SNC), Georgia Power Company, Oglethorpe Power Corporation, Municipal Electric Authority of Georgia, and City of Dalton, Georgia (the licensee), for construction and operation of the Vogtle Electric Generating Plant (VGEP), Units 3 and 4, located in Burke County, Georgia. The amendment revises the UFSAR by making changes to the Non-Class 1E dc and Uninterruptible Power Supply System (EDS) and Class 1E dc and Uninterruptible Power Supply System (IDS) and making changes to the corresponding Tier 1 information in Appendix C to the Combined Licenses. The granting of the exemption allows the changes to Tier 1 information asked for in the amendment. Because the acceptability of the exemption was determined in part by the acceptability of the amendment, the exemption and amendment are being issued concurrently.
United Nuclear Corporation
The U.S. Nuclear Regulatory Commission (NRC) is seeking comment from interested parties on the license amendment application request from United Nuclear Corporation (UNC or the licensee), a subsidiary of General Electric (GE), for a 5-year extension for the final emplacement of the radon barrier and erosion protection for the UNC Church Rock Mill site located in McKinley County, New Mexico. Specifically, UNC is requesting an amendment to Source Material License No. SUA-1475, for License Conditions 35.A(3) and 35.B(1), which would extend the dates for emplacement of the final radon barrier and the erosion protection from December 31, 2014, to December 31, 2019.