Sunshine Act Meeting, 24460 [2014-09966]
Download as PDF
24460
Federal Register / Vol. 79, No. 83 / Wednesday, April 30, 2014 / Notices
Your request should state that the NRC
does not routinely edit comment
submissions to remove such information
before making the comment
submissions available to the public or
entering the comment submissions into
ADAMS.
II. Introduction and Solicitation of
Comments
mstockstill on DSK4VPTVN1PROD with NOTICES
Dated at Rockville, Maryland this 17th day
of April 2014.
For the Nuclear Regulatory Commission.
Andrew Persinko,
Deputy Director, Decommissioning and
Uranium Recovery Licensing Directorate,
Division of Waste Management and
Environmental Protection, Office of Federal
and State Materials and Environmental
Management Programs.
[FR Doc. 2014–09735 Filed 4–29–14; 8:45 am]
BILLING CODE 7590–01–P
VerDate Mar<15>2010
17:41 Apr 29, 2014
Jkt 232001
Sunshine Act Meeting
Nuclear
Regulatory Commission [NRC–2012–
0002].
AGENCY HOLDING THE MEETINGS:
DATE:
The NRC has received, by letter dated
September 18, 2013, an application to
amend Source Materials License No.
SUA–1475 (the UNC license) for the
UNC Church Rock Mill site located in
New Mexico (ADAMS Accession Nos.
ML13277A287, ML13266A361).
Specifically, UNC, a subsidiary of
General Electric (GE), requested to
extend the projected dates for (1) the
completion of groundwater corrective
actions, and (2) the emplacement of the
final radon barrier and erosion
protection for the UNC Church Rock
Mill Site. On November 7, 2013, the
NRC issued License Amendment No. 48,
subsequently corrected by License
Amendment No. 49 (ADAMS Accession
Nos. ML13277A287 and
ML14043A475), granting the licensee’s
request regarding its groundwater
corrective actions. However, prior to
making a final determination on the
UNC’s second request to extend the date
for emplacing the final radon barrier
and the erosion protection, the NRC is
providing an opportunity for public
participation required under Criterion
6A(2) of Appendix A to Title 10 of the
Code of Federal Regulations Part 40,
through the provision of this
opportunity to provide comments.
Specific comments are requested on the
requested changes to License Conditions
35.A(3) and 35.B(1), which would
extend the date for emplacement of the
final radon barrier and the erosion
protection from December 31, 2014 to
December 31, 2019. Comments should
be provided within 30 days of the
publication date of this notice.
Dated: April 25, 2014.
Kenneth Hart,
Technical Coordinator, Office of the
Secretary.
NUCLEAR REGULATORY
COMMISSION
Week of April 28, 2014.
Commissioners’ Conference
Room, 11555 Rockville Pike, Rockville,
Maryland.
PLACE:
STATUS:
Public and Closed.
[FR Doc. 2014–09966 Filed 4–28–14; 4:15 pm]
BILLING CODE 7590–01–P
NUCLEAR REGULATORY
COMMISSION
[Docket Nos. 52–025 and 52–026; NRC–
2008–0252]
Week of April 28, 2014
Vogtle Electric Generating Plant, Units
3 and 4; Southern Nuclear Operating
Company; Turbine Building Battery
Room and Electrical Changes
Friday, May 2, 2014
AGENCY:
ADDITIONAL ITEMS TO BE CONSIDERED:
10:25 a.m. Affirmation Session (Public
Meeting) (Tentative)
a. SECY–14–0020 Exelon Generation
Co., LLC (Byron Nuclear Station,
Units 1 and 2; Braidwood Nuclear
Station, Units 1 and 2)—
Environmental Law and Policy
Center Appeal of LBP–13–12 and
Request for a Protective Stay.
*
*
*
*
*
* The schedule for Commission
meetings is subject to change on short
notice. To verify the status of meetings,
call (recording)—(301) 415–1292.
Contact person for more information:
Rochelle Bavol, (301) 415–1651.
*
*
*
*
*
The NRC Commission Meeting
Schedule can be found on the Internet
at: www.nrc.gov/about-nrc/policymaking/schedule.html.
*
*
*
*
*
The NRC provides reasonable
accommodation to individuals with
disabilities where appropriate. If you
need a reasonable accommodation to
participate in these public meetings, or
need this meeting notice or the
transcript or other information from the
public meetings in another format (e.g.
braille, large print), please notify Bill
Dosch, Chief, Work Life and Benefits
Branch, at 301–415–6200, TDD: 301–
415–2100, or by email at
william.dosch@nrc.gov. Determinations
on requests for reasonable
accommodation will be made on a caseby-case basis.
*
*
*
*
*
This notice is distributed
electronically to subscribers. If you no
longer wish to receive it, or would like
to be added to the distribution, please
contact the Office of the Secretary,
Washington, DC 20555 (301–415–1969),
or send an email to darlene.wright@
nrc.gov.
PO 00000
Frm 00090
Fmt 4703
Sfmt 4703
Nuclear Regulatory
Commission.
ACTION: Exemption and combined
license amendment; issuance.
The U.S. Nuclear Regulatory
Commission (NRC) is granting an
exemption to allow a departure from the
certification information of Tier 1 of the
generic design control document (DCD)
and issuing License Amendment No. 18
to Combined Licenses (COL), NPF–91
and NPF–92. The COLs were issued to
Southern Nuclear Operating Company
(SNC), Georgia Power Company,
Oglethorpe Power Corporation,
Municipal Electric Authority of Georgia,
and City of Dalton, Georgia (the
licensee), for construction and operation
of the Vogtle Electric Generating Plant
(VGEP), Units 3 and 4, located in Burke
County, Georgia. The amendment
revises the UFSAR by making changes
to the Non-Class 1E dc and
Uninterruptible Power Supply System
(EDS) and Class 1E dc and
Uninterruptible Power Supply System
(IDS) and making changes to the
corresponding Tier 1 information in
Appendix C to the Combined Licenses.
The granting of the exemption allows
the changes to Tier 1 information asked
for in the amendment. Because the
acceptability of the exemption was
determined in part by the acceptability
of the amendment, the exemption and
amendment are being issued
concurrently.
SUMMARY:
Please refer to Docket ID
NRC–2008–0252 when contacting the
NRC about the availability of
information regarding this document.
You may access information related to
this document, which the NRC
possesses and is publicly available,
using any of the following methods:
• Federal Rulemaking Web site: Go to
https://www.regulations.gov and search
for Docket ID NRC–2008–0252. Address
questions about NRC dockets to Carol
ADDRESSES:
E:\FR\FM\30APN1.SGM
30APN1
Agencies
[Federal Register Volume 79, Number 83 (Wednesday, April 30, 2014)]
[Notices]
[Page 24460]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2014-09966]
-----------------------------------------------------------------------
NUCLEAR REGULATORY COMMISSION
Sunshine Act Meeting
AGENCY HOLDING THE MEETINGS: Nuclear Regulatory Commission [NRC-2012-
0002].
DATE: Week of April 28, 2014.
PLACE: Commissioners' Conference Room, 11555 Rockville Pike, Rockville,
Maryland.
STATUS: Public and Closed.
ADDITIONAL ITEMS TO BE CONSIDERED:
Week of April 28, 2014
Friday, May 2, 2014
10:25 a.m. Affirmation Session (Public Meeting) (Tentative)
a. SECY-14-0020 Exelon Generation Co., LLC (Byron Nuclear Station,
Units 1 and 2; Braidwood Nuclear Station, Units 1 and 2)--Environmental
Law and Policy Center Appeal of LBP-13-12 and Request for a Protective
Stay.
* * * * *
* The schedule for Commission meetings is subject to change on
short notice. To verify the status of meetings, call (recording)--(301)
415-1292. Contact person for more information: Rochelle Bavol, (301)
415-1651.
* * * * *
The NRC Commission Meeting Schedule can be found on the Internet
at: www.nrc.gov/about-nrc/policy-making/schedule.html.
* * * * *
The NRC provides reasonable accommodation to individuals with
disabilities where appropriate. If you need a reasonable accommodation
to participate in these public meetings, or need this meeting notice or
the transcript or other information from the public meetings in another
format (e.g. braille, large print), please notify Bill Dosch, Chief,
Work Life and Benefits Branch, at 301-415-6200, TDD: 301-415-2100, or
by email at william.dosch@nrc.gov. Determinations on requests for
reasonable accommodation will be made on a case-by-case basis.
* * * * *
This notice is distributed electronically to subscribers. If you no
longer wish to receive it, or would like to be added to the
distribution, please contact the Office of the Secretary, Washington,
DC 20555 (301-415-1969), or send an email to darlene.wright@nrc.gov.
Dated: April 25, 2014.
Kenneth Hart,
Technical Coordinator, Office of the Secretary.
[FR Doc. 2014-09966 Filed 4-28-14; 4:15 pm]
BILLING CODE 7590-01-P