Sunshine Act Meeting, 24460 [2014-09966]

Download as PDF 24460 Federal Register / Vol. 79, No. 83 / Wednesday, April 30, 2014 / Notices Your request should state that the NRC does not routinely edit comment submissions to remove such information before making the comment submissions available to the public or entering the comment submissions into ADAMS. II. Introduction and Solicitation of Comments mstockstill on DSK4VPTVN1PROD with NOTICES Dated at Rockville, Maryland this 17th day of April 2014. For the Nuclear Regulatory Commission. Andrew Persinko, Deputy Director, Decommissioning and Uranium Recovery Licensing Directorate, Division of Waste Management and Environmental Protection, Office of Federal and State Materials and Environmental Management Programs. [FR Doc. 2014–09735 Filed 4–29–14; 8:45 am] BILLING CODE 7590–01–P VerDate Mar<15>2010 17:41 Apr 29, 2014 Jkt 232001 Sunshine Act Meeting Nuclear Regulatory Commission [NRC–2012– 0002]. AGENCY HOLDING THE MEETINGS: DATE: The NRC has received, by letter dated September 18, 2013, an application to amend Source Materials License No. SUA–1475 (the UNC license) for the UNC Church Rock Mill site located in New Mexico (ADAMS Accession Nos. ML13277A287, ML13266A361). Specifically, UNC, a subsidiary of General Electric (GE), requested to extend the projected dates for (1) the completion of groundwater corrective actions, and (2) the emplacement of the final radon barrier and erosion protection for the UNC Church Rock Mill Site. On November 7, 2013, the NRC issued License Amendment No. 48, subsequently corrected by License Amendment No. 49 (ADAMS Accession Nos. ML13277A287 and ML14043A475), granting the licensee’s request regarding its groundwater corrective actions. However, prior to making a final determination on the UNC’s second request to extend the date for emplacing the final radon barrier and the erosion protection, the NRC is providing an opportunity for public participation required under Criterion 6A(2) of Appendix A to Title 10 of the Code of Federal Regulations Part 40, through the provision of this opportunity to provide comments. Specific comments are requested on the requested changes to License Conditions 35.A(3) and 35.B(1), which would extend the date for emplacement of the final radon barrier and the erosion protection from December 31, 2014 to December 31, 2019. Comments should be provided within 30 days of the publication date of this notice. Dated: April 25, 2014. Kenneth Hart, Technical Coordinator, Office of the Secretary. NUCLEAR REGULATORY COMMISSION Week of April 28, 2014. Commissioners’ Conference Room, 11555 Rockville Pike, Rockville, Maryland. PLACE: STATUS: Public and Closed. [FR Doc. 2014–09966 Filed 4–28–14; 4:15 pm] BILLING CODE 7590–01–P NUCLEAR REGULATORY COMMISSION [Docket Nos. 52–025 and 52–026; NRC– 2008–0252] Week of April 28, 2014 Vogtle Electric Generating Plant, Units 3 and 4; Southern Nuclear Operating Company; Turbine Building Battery Room and Electrical Changes Friday, May 2, 2014 AGENCY: ADDITIONAL ITEMS TO BE CONSIDERED: 10:25 a.m. Affirmation Session (Public Meeting) (Tentative) a. SECY–14–0020 Exelon Generation Co., LLC (Byron Nuclear Station, Units 1 and 2; Braidwood Nuclear Station, Units 1 and 2)— Environmental Law and Policy Center Appeal of LBP–13–12 and Request for a Protective Stay. * * * * * * The schedule for Commission meetings is subject to change on short notice. To verify the status of meetings, call (recording)—(301) 415–1292. Contact person for more information: Rochelle Bavol, (301) 415–1651. * * * * * The NRC Commission Meeting Schedule can be found on the Internet at: www.nrc.gov/about-nrc/policymaking/schedule.html. * * * * * The NRC provides reasonable accommodation to individuals with disabilities where appropriate. If you need a reasonable accommodation to participate in these public meetings, or need this meeting notice or the transcript or other information from the public meetings in another format (e.g. braille, large print), please notify Bill Dosch, Chief, Work Life and Benefits Branch, at 301–415–6200, TDD: 301– 415–2100, or by email at william.dosch@nrc.gov. Determinations on requests for reasonable accommodation will be made on a caseby-case basis. * * * * * This notice is distributed electronically to subscribers. If you no longer wish to receive it, or would like to be added to the distribution, please contact the Office of the Secretary, Washington, DC 20555 (301–415–1969), or send an email to darlene.wright@ nrc.gov. PO 00000 Frm 00090 Fmt 4703 Sfmt 4703 Nuclear Regulatory Commission. ACTION: Exemption and combined license amendment; issuance. The U.S. Nuclear Regulatory Commission (NRC) is granting an exemption to allow a departure from the certification information of Tier 1 of the generic design control document (DCD) and issuing License Amendment No. 18 to Combined Licenses (COL), NPF–91 and NPF–92. The COLs were issued to Southern Nuclear Operating Company (SNC), Georgia Power Company, Oglethorpe Power Corporation, Municipal Electric Authority of Georgia, and City of Dalton, Georgia (the licensee), for construction and operation of the Vogtle Electric Generating Plant (VGEP), Units 3 and 4, located in Burke County, Georgia. The amendment revises the UFSAR by making changes to the Non-Class 1E dc and Uninterruptible Power Supply System (EDS) and Class 1E dc and Uninterruptible Power Supply System (IDS) and making changes to the corresponding Tier 1 information in Appendix C to the Combined Licenses. The granting of the exemption allows the changes to Tier 1 information asked for in the amendment. Because the acceptability of the exemption was determined in part by the acceptability of the amendment, the exemption and amendment are being issued concurrently. SUMMARY: Please refer to Docket ID NRC–2008–0252 when contacting the NRC about the availability of information regarding this document. You may access information related to this document, which the NRC possesses and is publicly available, using any of the following methods: • Federal Rulemaking Web site: Go to https://www.regulations.gov and search for Docket ID NRC–2008–0252. Address questions about NRC dockets to Carol ADDRESSES: E:\FR\FM\30APN1.SGM 30APN1

Agencies

[Federal Register Volume 79, Number 83 (Wednesday, April 30, 2014)]
[Notices]
[Page 24460]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2014-09966]


-----------------------------------------------------------------------

NUCLEAR REGULATORY COMMISSION


Sunshine Act Meeting

AGENCY HOLDING THE MEETINGS: Nuclear Regulatory Commission [NRC-2012-
0002].

DATE: Week of April 28, 2014.

PLACE: Commissioners' Conference Room, 11555 Rockville Pike, Rockville, 
Maryland.

STATUS: Public and Closed.

ADDITIONAL ITEMS TO BE CONSIDERED: 

Week of April 28, 2014

Friday, May 2, 2014

10:25 a.m. Affirmation Session (Public Meeting) (Tentative)
    a. SECY-14-0020 Exelon Generation Co., LLC (Byron Nuclear Station, 
Units 1 and 2; Braidwood Nuclear Station, Units 1 and 2)--Environmental 
Law and Policy Center Appeal of LBP-13-12 and Request for a Protective 
Stay.
* * * * *
    * The schedule for Commission meetings is subject to change on 
short notice. To verify the status of meetings, call (recording)--(301) 
415-1292. Contact person for more information: Rochelle Bavol, (301) 
415-1651.
* * * * *
    The NRC Commission Meeting Schedule can be found on the Internet 
at: www.nrc.gov/about-nrc/policy-making/schedule.html.
* * * * *
    The NRC provides reasonable accommodation to individuals with 
disabilities where appropriate. If you need a reasonable accommodation 
to participate in these public meetings, or need this meeting notice or 
the transcript or other information from the public meetings in another 
format (e.g. braille, large print), please notify Bill Dosch, Chief, 
Work Life and Benefits Branch, at 301-415-6200, TDD: 301-415-2100, or 
by email at william.dosch@nrc.gov. Determinations on requests for 
reasonable accommodation will be made on a case-by-case basis.
* * * * *
    This notice is distributed electronically to subscribers. If you no 
longer wish to receive it, or would like to be added to the 
distribution, please contact the Office of the Secretary, Washington, 
DC 20555 (301-415-1969), or send an email to darlene.wright@nrc.gov.

    Dated: April 25, 2014.
Kenneth Hart,
Technical Coordinator, Office of the Secretary.
[FR Doc. 2014-09966 Filed 4-28-14; 4:15 pm]
BILLING CODE 7590-01-P
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.