Yankee Atomic Electric Company, Yankee Nuclear Power Station
The U.S. Nuclear Regulatory Commission (NRC) issued a final rule amending certain emergency planning (EP) requirements in the regulations that govern domestic licensing of production and utilization facilities (November 23, 2011; 76 FR 72560) (EP Final Rule). The EP Final Rule was effective on December 23, 2011, with various implementation dates for each of the rule changes.
Acceptability of Corrective Action Programs for Fuel Cycle Facilities
The U.S. Nuclear Regulatory Commission (NRC) is withdrawing draft NUREG-2154, ``Acceptability of Corrective Action Programs for Fuel Cycle Facilities,'' based on receipt and review of public comments. The draft NUREG provided guidance to NRC staff on how to determine whether a submittal for a Corrective Action Program (CAP), voluntarily submitted by fuel cycle facility licensees, was acceptable. The NRC staff has reviewed public comments received on draft NUREG-2154 and has decided to withdraw the draft NUREG and to proceed with the development and issuance of a draft Regulatory Guide (RG) to describe elements of an acceptable CAP for fuel cycle facilities.
Vogtle Electric Generating Station, Units 3 and 4; Southern Nuclear Operating Company; Change to the Bracing Design in the Turbine Building and Corresponding Change to Structural Design Code
The U.S. Nuclear Regulatory Commission (NRC) is granting both an exemption to allow a departure from the certification information of Tier 1 of the generic design control document (DCD) and is issuing License Amendment No. 8 to Combined Licenses (COL), NPF-91 and NPF-92. The COLs were issued to Southern Nuclear Operating Company, Inc., and Georgia Power Company, Oglethorpe Power Corporation, Municipal Electric Authority of Georgia, and the City of Dalton, Georgia (the licensee); for construction and operation of the Vogtle Electric Generating Plant (VEGP), Units 3 and 4, located in Burke County, Georgia. The amendment requests to revise the design of the bracing used to support the Turbine Building structure. This request requires changing Tier 1 information found in the Design Description portion of Updated Final Safety Analysis Report (UFSAR) Section 3.3, ``Buildings.'' The granting of the exemption allows the changes to Tier 1 information asked for in the amendment. Because the acceptability of the exemption was determined in part by the acceptability of the amendment, the exemption and amendment are being issued concurrently.
Vogtle Electric Generating Station, Units 3 and 4; Southern Nuclear Operating Company; Change to the Primary Sampling System
The U.S. Nuclear Regulatory Commission (NRC) is granting an exemption to allow a departure from the certification information of Tier 1 of the generic design control document (DCD) and is issuing License Amendment No. 10 to Combined Licenses (COL), NPF-91 and NPF-92. The COLs were issued to Southern Nuclear Operating Company, Inc., and Georgia Power Company, Oglethorpe Power Corporation, Municipal Electric Authority of Georgia, and the City of Dalton, Georgia (the licensee); for construction and operation of the Vogtle Electric Generating Plant (VEGP), Units 3 and 4, located in Burke County, Georgia. The amendment requests to modify the Primary Sampling System (PSS) design, including changes to Tier 1 information located in Tables 2.2.1-2, 2.3.13-1, and 2.3.13-3, Figures 2.2.1-1 ``Containment System'' and 2.3.13-1 ``Primary Sampling System,'' and Subsection 2.3.13, ``Primary Sampling System'' of the Updated Final Safety Analysis Report (UFSAR). The granting of the exemption allows the changes to Tier 1 information asked for in the amendment. Because the acceptability of the exemption was determined in part by the acceptability of the amendment, the exemption and amendment are being issued concurrently.
Vogtle Electric Generating Station, Units 3 and 4; Southern Nuclear Operating Company; Change to the Primary Sampling System
The U.S. Nuclear Regulatory Commission (NRC) is granting an exemption to allow a departure from the certification information of Tier 1 of the generic design control document (DCD) and is issuing License Amendment No. 10 to Combined Licenses (COL), NPF-91 and NPF-92. The COLs were issued to Southern Nuclear Operating Company, Inc., and Georgia Power Company, Oglethorpe Power Corporation, Municipal Electric Authority of Georgia, and the City of Dalton, Georgia (the licensee); for construction and operation of the Vogtle Electric Generating Plant (VEGP), Units 3 and 4, located in Burke County, Georgia. The amendment requests to modify the Primary Sampling System (PSS) design, including changes to Tier 1 information located in Tables 2.2.1-2, 2.3.13-1, and 2.3.13-3, Figures 2.2.1-1 ``Containment System'' and 2.3.13-1 ``Primary Sampling System,'' and Subsection 2.3.13, ``Primary Sampling System'' of the Updated Final Safety Analysis Report (UFSAR). The granting of the exemption allows the changes to Tier 1 information asked for in the amendment. Because the acceptability of the exemption was determined in part by the acceptability of the amendment, the exemption and amendment are being issued concurrently.