Nuclear Regulatory Commission March 28, 2011 – Federal Register Recent Federal Regulation Documents

Office of New Reactors; Final Interim Staff Guidance on the Review of Nuclear Power Plant Designs Using a Gas Turbine Driven Standby Emergency Alternating Current Power System
Document Number: 2011-7206
Type: Notice
Date: 2011-03-28
Agency: Nuclear Regulatory Commission, Agencies and Commissions
The NRC staff is issuing its Final Interim Staff Guidance (ISG) DC/COL-ISG-021 titled ``Interim Staff Guidance on the Review of Nuclear Power Plant Designs Using a Gas Turbine Driven Standby Emergency Alternating Current Power System,'' Agencywide Documents Access and Management System (ADAMS) Accession No. ML102510119 for DC/ COL-ISG-021 and ADAMS Accession No. ML102510164 for Attachment 1 to DC/ COL-ISG-021. This ISG provides new guidance for applicants submitting a combined license (COL) or design certification (DC) application for new nuclear power reactors under Title 10 of the Code of Federal Regulations, part 52. In addition, it supplements the guidance provided to the NRC staff in NUREG-0800, ``Standard Review Plan for the Review of Safety Analysis Reports for Nuclear Power Plants,'' March 2007, Standard Review Plan (SRP), Section 8.3.1 and Sections 9.5.4 through 9.5.8. The NRC staff issues DC/COL-ISGs to facilitate activities associated with NRC review of applications for DCs and COLs. The NRC staff intends to incorporate DC/COL-ISG-021 into the next revision of SRP Section 8.3.1 and Sections 9.5.4 through 9.5.8 and Regulatory Guide 1.206, ``Combined License Applications for Nuclear Power Plants (LWR Edition),'' June 2007. Disposition: On February 3, 2010, the NRC staff issued proposed DC/ COL-ISG-021 on ``Review of Nuclear Power Plant Designs Using a Gas Turbine Driven Standby Emergency Alternating Current Power System,'' ADAMS Accession No. ML092640035. The NRC staff received comments on the proposed guidance. This final issuance resolves the majority of the comments. The NRC staff responses to these comments can be found in ADAMS Accession No. ML102510176.
Office of New Reactors; Final Interim Staff Guidance on Standard Review Plan, Section 17.4, “Reliability Assurance Program”
Document Number: 2011-7204
Type: Notice
Date: 2011-03-28
Agency: Nuclear Regulatory Commission, Agencies and Commissions
The NRC staff is issuing its Final Interim Staff Guidance (ISG) DC/COL-ISG-018 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML103010113). The purpose of this ISG is to clarify the NRC staff guidance on the design reliability assurance program (RAP). This ISG updates the guidance provided to the staff in Standard Review Plan (SRP), Section 17.4, ``Reliability Assurance Program,'' of NUREG-0800, ``Standard Review Plan for the Review of Safety Analysis Reports for Nuclear Power Plants,'' March 2007. This ISG revises the NRC staff's review responsibilities and further clarifies the acceptance criteria and evaluation findings contained in the SRP Section 17.4 in support of the NRC reviews of the design certification (DC) and combined license (COL) applications. The NRC staff issues DC/COL-ISGs to facilitate timely implementation of current staff guidance and to facilitate activities associated with NRC review of applications for DCs and COLs. The NRC staff intends to incorporate the final approved DC/COL-ISG-018 into the next revisions of NUREG-0800, SRP Section 17.4 and Regulatory Guide (RG) 1.206, ``Combined License Applications for Nuclear Power Plants (LWR Edition),'' June 2007. Disposition: On October 30, 2009, the NRC staff issued proposed DC/ COL-ISG-018 on ``Reliability Assurance Program,'' ADAMS Accession No. ML092290791. The staff received only editorial comments which were incorporated. However, the ISG was further discussed at public meetings held at the NRC during 2010. These public meetings primarily focused on the Tier 1 inspections, tests, analyses, and acceptance criteria for the COL RAP during the design stage, which is specified in the ISG. This final issuance incorporates clarifications that resulted from these public meetings. A document comparing the version of the ISG that was issued for public comments and the final version of the ISG can be found under ADAMS Accession No. ML103010361.
List of Approved Spent Fuel Storage Casks: HI-STORM Flood/Wind Addition
Document Number: 2011-7102
Type: Rule
Date: 2011-03-28
Agency: Nuclear Regulatory Commission, Agencies and Commissions
The U. S. Nuclear Regulatory Commission (NRC or the Commission) is amending its regulations to add the HI-STORM Flood/Wind cask system to the ``List of Approved Spent Fuel Storage Casks.'' This direct final rule allows the holders of power reactor operating licenses to store spent fuel in this approved cask system under a general license.
List of Approved Spent Fuel Storage Casks: HI-STORM Flood/Wind Addition
Document Number: 2011-7091
Type: Proposed Rule
Date: 2011-03-28
Agency: Nuclear Regulatory Commission, Agencies and Commissions
The U.S. Nuclear Regulatory Commission (NRC or the Commission) is proposing to amend its spent fuel storage cask regulations to add the HI-STORM Flood/Wind cask system to the ``List of Approved Spent Fuel Storage Casks.'' This would allow the holders of power reactor operating licenses to store spent fuel in this approved cask system under a general license.
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.