Nuclear Regulatory Commission March 2005 – Federal Register Recent Federal Regulation Documents

Meeting on Planning and Procedures; Notice of Meeting
Document Number: 05-4399
Type: Notice
Date: 2005-03-08
Agency: Advisory Committee on Nuclear Waste, Nuclear Regulatory Commission, Agencies and Commissions
Fire Protection Program-Post-Fire Operator Manual Actions Draft Regulatory Guide: Issuance, Availability
Document Number: 05-4314
Type: Proposed Rule
Date: 2005-03-07
Agency: Nuclear Regulatory Commission, Agencies and Commissions
The Nuclear Regulatory Commission (NRC) proposes to amend its fire protection regulations for nuclear power facilities operating prior to January 1, 1979. The amendment would allow nuclear power plant licensees to use manual actions by plant operators as an alternative method to achieve hot shutdown conditions in the event of fires in certain plant areas, provided that the actions are evaluated against specified criteria and determined to be acceptable and that fire detectors and an automatic fire suppression system are provided in the fire area. The Commission believes that the proposed action would provide realistically conservative regulatory acceptance criteria for operator manual actions to achieve and maintain hot shutdown condition. The NRC is also proposing and requesting comments on a draft regulatory guide to support this proposed rulemaking. The NRC has developed the Regulatory Guide Series to describe and make available to the public such information as methods that are acceptable to the NRC staff for implementing specific parts of the NRC's regulations, techniques that the staff uses in evaluating specific problems or postulated accidents, and data that the staff needs in its review of applications for permits and licenses. The draft regulatory guide, entitled ``Demonstrating the Feasibility and Reliability of Operator Manual Actions in Response to Fire,'' is temporarily identified by its task number, DG-1136, which should be mentioned in all related correspondence. This proposed regulatory guide offers guidance for NRC licensees and applicants to use in implementing the feasibility and reliability criteria that the staff developed for post-fire operator manual actions.
Material Control and Accounting at Reactors and Wet Spent Fuel Storage Facilities
Document Number: 05-4313
Type: Notice
Date: 2005-03-07
Agency: Nuclear Regulatory Commission, Agencies and Commissions
The Nuclear Regulatory Commission (NRC) has issued Bulletin (BL) 2005-01 to all holders of operating licenses for nuclear power reactors, decommissioning nuclear power reactor sites storing spent fuel in a pool, and wet spent fuel storage sites. This bulletin contains sensitive information relating to material control and accounting (MC&A) programs and is, therefore, being withheld from public disclosure in accordance with 10 CFR 2.390. The bulletin is being provided to only those licensees needing to respond to it.
STP Nuclear Operating Company, et al.; Notice of Consideration of Approval of Application Transfer of Facility Operating Licenses and Conforming Amendments and Opportunity for Hearing; Correction
Document Number: 05-4069
Type: Notice
Date: 2005-03-03
Agency: Nuclear Regulatory Commission, Agencies and Commissions
This document corrects a notice appearing in the Federal Register on December 20, 2004 (69 FR 76019), that provided an incorrect application date. This action is necessary to correct an erroneous date.
Agency Information Collection Activities: Proposed Collection: Comment Request
Document Number: 05-3979
Type: Notice
Date: 2005-03-02
Agency: Nuclear Regulatory Commission, Agencies and Commissions
The NRC is preparing a submittal to OMB for review of continued approval of information collections under the provisions of the Paperwork Reduction Act of 1995 (44 U.S.C. Chapter 35). Information pertaining to the requirement to be submitted: 1. The Title of the Information Collection: 10 CFR part 20 Standards for Protection Against Radiation. 2. Current OMB Approval Number: 3150-0014. 3. How Often the Collection is Required: Annually for most reports and at license termination for reports dealing with decommissioning. 4. Who is Required or Asked to Report: NRC licensees, including those requesting license termination. 5. The Estimated Number of Annual Respondents: 4,512. 6. The Number of Hours Needed Annually to Complete the Requirement or Request: 128,669 hours (4,909 hours for reporting [9.68 hours per response] plus 123,760 hours for recordkeeping [27.43 hours per recordkeeper]). 7. Abstract: 10 CFR part 20 establishes standards for protection against ionizing radiation resulting from activities conducted under licenses issued by the NRC. These standards require the establishment of radiation protection programs, maintenance of radiation records, recording of radiation received by workers, reporting of incidents which could cause exposure to radiation, submittal of an annual report to NRC of the results of individual monitoring, and submittal of license termination information. These mandatory requirements are needed to protect occupationally exposed individuals from undue risks of excessive exposure to ionizing radiation and to protect the health and safety of the public. Submit, by May 2, 2005, comments that address the following questions: 1. Is the proposed collection of information necessary for the NRC to properly perform its functions? Does the information have practical utility? 2. Is the burden estimate accurate? 3. Is there a way to enhance the quality, utility, and clarity of the information to be collected? 4. How can the burden of the information collection be minimized, including the use of automated collection techniques or other forms of information technology? A copy of the draft supporting statement may be viewed free of charge at the NRC Public Document Room, One White Flint North, 11555 Rockville Pike, Room O-1 F21, Rockville, MD 20852. OMB clearance requests are available at the NRC worldwide Web site: https:// www.nrc.gov/public-involve/doc-comment/omb/. The document will be available on the NRC home page site for 60 days after the signature date of this notice. Comments and questions about the information collection requirements may be directed to the NRC Clearance Officer, Brenda Jo. Shelton, (T-5 F53), U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001, by telephone at 301-415-7233, or by Internet electronic mail to INFOCOLLECTS@NRC.GOV.
Notice of Opportunity To Comment on Model Safety Evaluation on Technical Specification Improvement To Modify Requirements Regarding the Addition of LCO 3.4.[17] on Steam Generator Tube Integrity Using the Consolidated Line Item Improvement Process
Document Number: 05-3866
Type: Notice
Date: 2005-03-02
Agency: Nuclear Regulatory Commission, Agencies and Commissions
Notice is hereby given that the staff of the Nuclear Regulatory Commission (NRC) has prepared a model safety evaluation (SE) relating to the addition of a steam generator (SG) tube integrity specification to technical specifications (TS). The NRC staff has also prepared a model no-significant-hazards-consideration (NSHC) determination relating to this matter. The purpose of these models is to permit the NRC to efficiently process amendments that propose to add an LCO 3.4.[17] that requires that SG tube integrity be maintained and requires that all SG tubes that satisfy the repair criteria be plugged or repaired in accordance with the Steam Generator Program. Licensees of nuclear power reactors to which the models apply could then request amendments, confirming the applicability of the SE and NSHC determination to their reactors. The NRC staff is requesting comment on the model SE and model NSHC determination prior to announcing their availability for referencing in license amendment applications.
Sunshine Act Meeting
Document Number: 05-3978
Type: Notice
Date: 2005-03-01
Agency: Nuclear Regulatory Commission, Agencies and Commissions
Dominion Nuclear Connecticut; Establishment of Atomic Safety and Licensing Board
Document Number: 05-3864
Type: Notice
Date: 2005-03-01
Agency: Nuclear Regulatory Commission, Agencies and Commissions
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.