Construction Permit Application for the SHINE Medical Radioisotope Production Facility
The U.S. Nuclear Regulatory Commission (NRC) is issuing for public comment a draft Environmental Impact Statement (EIS) for the construction permit application submitted by SHINE Medical Technologies, Inc. (SHINE), for the SHINE Medical Radioisotope Production Facility (SHINE facility). The proposed SHINE facility would be located in Janesville, Wisconsin. Possible alternatives to the proposed action (issuance of the construction permit) include no action, reasonable alternative sites, and a reasonable alternative technology. The NRC staff plans to hold two public meetings during the public comment period to present an overview of the draft EIS and to accept public comments on the document.
Proposed Agency Information Collection Activities; Comment Request
On June 15, 1984, the Office of Management and Budget (OMB) delegated to the Board of Governors of the Federal Reserve System (Board) its approval authority under the Paperwork Reduction Act (PRA), to approve of and assign OMB numbers to collection of information requests and requirements conducted or sponsored by the Board. Board- approved collections of information are incorporated into the official OMB inventory of currently approved collections of information. Copies of the PRA Submission, supporting statements and approved collection of information instruments are placed into OMB's public docket files. The Federal Reserve may not conduct or sponsor, and the respondent is not required to respond to, an information collection that has been extended, revised, or implemented on or after October 1, 1995, unless it displays a currently valid OMB number.
Information Collection Being Reviewed by the Federal Communications Commission
As part of its continuing effort to reduce paperwork burdens, and as required by the Paperwork Reduction Act (PRA) of 1995 (44 U.S.C. 3501-3520), the Federal Communications Commission (FCC or the Commission) invites the general public and other Federal agencies to take this opportunity to comment on the following information collection. Comments are requested concerning: Whether the proposed collection of information is necessary for the proper performance of the functions of the Commission, including whether the information shall have practical utility; the accuracy of the Commission's burden estimate; ways to enhance the quality, utility, and clarity of the information collected; ways to minimize the burden of the collection of information on the respondents, including the use of automated collection techniques or other forms of information technology; and ways to further reduce the information collection burden on small business concerns with fewer than 25 employees. The FCC may not conduct or sponsor a collection of information unless it displays a currently valid control number. No person shall be subject to any penalty for failing to comply with a collection of information subject to the PRA that does not display a valid Office of Management and Budget (OMB) control number.
Auction of FM Broadcast Construction Permits Scheduled for July 23, 2015; Notice and Filing Requirements, Minimum Opening Bids, Upfront Payments, and Other Procedures for Auction 98
This document announces the procedures, upfront payment amounts, and minimum opening bids for the upcoming auction of certain FM broadcast construction permits. This document is intended to familiarize prospective applicants with the procedures and other requirements for participation in Auction 98, as well as provide an overview of the post-auction application and payment processes.
Parties Asked To Refresh Record Regarding Petition to Reconsideration Cost Allocators Used To Calculate the Telecom Rate for Pole Attachments
In this document, the Wireline Competition Bureau (Bureau) seeks to refresh the record on a petition for reconsideration or clarification filed by the National Cable and Telecommunications Association (NCTA), COMPTEL, and tw telecom inc. (Petitioners) in the above-referenced proceedings. Petitioners request that ``the rules be clarified or amended by specifying [that] the cost allocator to be applied [will be] based on the number of attaching entities.''
Selection of Material Balance Areas and Item Control Areas
The U.S. Nuclear Regulatory Commission (NRC) is issuing for public comment draft regulatory guide (DG), DG-5057, ``Special Nuclear Material Control and Accounting System for Non-Fuel Cycle Facilities.'' This DG provides guidance to licensees and applicants on the NRC's regulations concerning the material control and accounting of special nuclear material. The need for this guidance arises from an ongoing NRC rulemaking to revise these regulations, as discussed further in Section II below. The scope of DG-5057 covers nuclear power plants and all non- fuel cycle facilities.