May 9, 2023 – Federal Register Recent Federal Regulation Documents
Results 1 - 50 of 116
Review of Standards of Performance for Automobile and Light Duty Truck Surface Coating Operations
The Environmental Protection Agency (EPA) is finalizing amendments to the new source performance standards for Automobile and Light Duty Truck Surface Coating Operations pursuant to the review required by the Clean Air Act. The EPA determined that revisions to the NSPS were needed to reflect the degree of emission limitation achievable through the application of the best system of emission reduction (BSER). The EPA is therefore finalizing, as proposed, in a new NSPS subpart MMa, revised volatile organic compound (VOC) emission limits for prime coat, guide coat, and topcoat operations for affected facilities that commence construction, modification, or reconstruction after May 18, 2022. In addition, in the new NSPS subpart, the EPA is finalizing the proposed amendments: the addition of work practices to minimize VOC emissions; revision of the plastic parts provision; updates to the capture and control devices and the associated testing and monitoring requirements; revision of the transfer efficiency provisions; new test methods and alternative test methods; revision of the recordkeeping and reporting requirements, including the addition of electronic reporting; removing exemptions for periods of startup, shutdown, and malfunction; and other amendments to harmonize the new NSPS subpart and Automobile and Light Duty Truck Surface Coating National Emission Standards for Hazardous Air Pollutants (NESHAP) requirements. The EPA is also finalizing the proposed electronic reporting requirements in the NSPS subpart MM, applicable to sources that commence construction, reconstruction, or modification after October 5, 1979, and on or before May 18, 2022.
Notification of Submission to the Secretary of Agriculture; Pesticides; Exemptions of Certain Plant-Incorporated Protectants (PIPs) Derived From Newer Technologies; Draft Final Rule
This document notifies the public as required by the Federal Insecticide, Fungicide, and Rodenticide Act (FIFRA) that the EPA Administrator has forwarded to the Secretary of the United States Department of Agriculture (USDA) a draft regulatory document entitled ``Pesticides; Exemptions of Certain Plant-Incorporated Protectants (PIPs) Derived from Newer Technologies; Final Rule.'' The draft regulatory document is not available to the public until after it has been signed and made available by EPA.
Air Plan Approval, Conditional Approval, Limited Approval and Limited Disapproval; Colorado; Serious Attainment Plan Elements and Related Revisions for the 2008 8-Hour Ozone Standard for the Denver Metro/North Front Range Nonattainment Area
In this final action the Environmental Protection Agency (EPA) is addressing all or part of several State Implementation Plan (SIP) revisions submitted by the State of Colorado (as explained further in this document, we are taking no action on some specific portions of the State's submittals). We are approving specified parts of SIP revisions submitted by Colorado on March 22, 2021, related to Clean Air Act (CAA) requirements for the 2008 8-hour ozone National Ambient Air Quality Standards (NAAQS) for the Denver Metro/North Front Range (DMNFR) Serious nonattainment area. We are also finalizing a limited approval and limited disapproval of reasonably available control technology (RACT) SIP revisions from submissions made on May 14, 2018, May 8, 2019, May 13, 2020, March 22, 2021, May 18, 2021, and May 20, 2022. Further, we are finalizing a limited conditional approval and limited disapproval of additional RACT related SIP submissions made on May 31, 2017, and May 10, 2019. Finally, in this document, the EPA is notifying the public of findings as to certain motor vehicle emissions budgets in the DMNFR nonattainment area. This action is being taken under the authority of the CAA.
Regulations Improving and Strengthening the Enforcement of Trade Remedies Through the Administration of the Antidumping and Countervailing Duty Laws
Pursuant to its authority under Title VII of the Tariff Act of 1930, as amended (the Act), the U.S. Department of Commerce (Commerce) proposes to amend its regulations to enhance, improve and strengthen its enforcement of trade remedies through the administration of antidumping duty (AD) and countervailing duty (CVD) laws. In this proposed rule, Commerce would revise many of its procedures, codify many areas of its practice, and enhance certain areas of its methodologies and analyses to address price and cost distortions in different capacities. Commerce is seeking public comment on these proposed revisions to the AD and CVD regulations.
South Carolina: Final Authorization of State Hazardous Waste Management Program Revisions
South Carolina has applied to the EPA for final authorization of changes to its hazardous waste program under the Resource Conservation and Recovery Act (RCRA), as amended. The EPA has reviewed South Carolina's application and has determined, subject to public comment, that these changes satisfy all requirements needed to qualify for final authorization. Therefore, in the ``Rules and Regulations'' section of this Federal Register, we are authorizing South Carolina for these changes as a direct final action without a prior proposed rule. If we receive no adverse comment, we will not take further action on this proposed rule.
South Carolina: Final Authorization of State Hazardous Waste Management Program Revisions
The Environmental Protection Agency (EPA) is taking direct final action on the authorization of South Carolina's changes to its hazardous waste program under the Resource Conservation and Recovery Act (RCRA), as amended. These changes were outlined in a September 26, 2022, application to the EPA. We have determined that these changes satisfy all requirements needed for final authorization.
Notice of Final Federal Agency Actions on the Spur 399 Extension Project in Texas
This notice announces actions taken by TxDOT and Federal agencies that are final. The environmental review, consultation, and other actions required by applicable Federal environmental laws for this project are being, or have been, carried out by TxDOT pursuant to an assignment agreement executed by FHWA and TxDOT. These actions grant licenses, permits, and approvals for the Spur 399 Extension Project, from US 75 to US 380 in Collin County, Texas.
Agency Information Collection Activities; Comment Request; Description of Coal Mine Work and Other Employment (CM-913) OMB Control Number: 1240-0035.
The Department of Labor (DOL) is soliciting comments concerning a proposed extension for the authority to conduct the information collection request (ICR) titled, ``Description of Coal Mine Work and Other Employment''. This comment request is part of continuing Departmental efforts to reduce paperwork and respondent burden in accordance with the Paperwork Reduction Act of 1995 (PRA).
Agency Information Collection Activities; Submission for OMB Review; Comment Request; Claim for Compensation by a Dependent Information Reports
The Department of Labor (DOL) is submitting this Office of Workers' Compensation Programs (OWCP)-sponsored information collection request (ICR) to the Office of Management and Budget (OMB) for review and approval in accordance with the Paperwork Reduction Act of 1995 (PRA). Public comments on the ICR are invited.
60-Day Notice of Proposed Information Collection: Section 8 Management Assessment Program (SEMAP) Certification; OMB Control No. 2577-0215
HUD is seeking approval from the Office of Management and Budget (OMB) for the information collection described below. In accordance with the Paperwork Reduction Act, HUD is requesting comment from all interested parties on the proposed collection of information. The purpose of this notice is to allow for 60 days of public comment.
Notice of Fee Increase for Our Electronic Consent Based Social Security Number Verification Service
The Social Security Administration (SSA) is announcing a change in the subscription tier structure and associated fees for the electronic Consent Based Social Security Number (SSN) Verification (eCBSV) service. In accordance with statutory requirements, a permitted entity (PE) is required to provide payment to reimburse SSA for the development and support of the eCBSV system.
National Park System Advisory Board; Charter Re-Establishment
The Secretary of the Interior intends to re-establish the National Park System Advisory Board (Board), in accordance with Federal Advisory Committee Act. The Secretary has chosen to re-establish the Board so that the Board may continue to provide advice to the Secretary on matters relating to the National Park Service, the National Park System, and programs administered by the National Park Service.
Airworthiness Directives; CFM International, S.A. Engines
The FAA is adopting a new airworthiness directive (AD) for certain CFM International, S.A. (CFM) Model LEAP-1B engines. This AD was prompted by a report of multiple aborted takeoffs and air turn- backs (ATBs) caused by high-pressure compressor (HPC) stall, which was induced by high levels of non-synchronous vibration (NSV). A subsequent investigation by the manufacturer revealed that wear on the No. 3 bearing spring finger housing can lead to high levels of NSV. This AD requires repetitive calculations of the oil filter delta pressure (OFDP) data and, depending on the results of the calculation, replacement of the No. 3 bearing spring finger housing. This AD also prohibits installation of an engine with an affected No. 3 bearing spring finger housing onto an airplane that already has one engine with an affected No. 3 bearing spring finger housing installed. The FAA is issuing this AD to address the unsafe condition on these products.
Fisheries of the Caribbean, Gulf of Mexico, and South Atlantic; Coastal Migratory Pelagic Resources in the Gulf of Mexico and Atlantic Region; Amendment 34
NMFS issues regulations to implement Amendment 34 to the Fishery Management Plan (FMP) for the Coastal Migratory Pelagic (CMP) Resources of the Gulf of Mexico and Atlantic Region (CMP FMP) (Amendment 34), as prepared and submitted by the South Atlantic Fishery Management Council (South Atlantic Council) and the Gulf of Mexico Fishery Management Council (Gulf Council). For Atlantic migratory group king mackerel (Atlantic king mackerel), this final rule revises the stock and sector annual catch limits (ACL), and the recreational bag and possession limits off the east coast of Florida. For both Atlantic king mackerel and Atlantic migratory group Spanish mackerel (Atlantic Spanish mackerel), this final rule revises the landing fish intact provisions for the recreational sector. In addition, for Atlantic king mackerel, Amendment 34 revises the acceptable biological catch (ABC) and annual optimum yield (OY). The purpose of this final rule and Amendment 34 is to revise the catch limits based on a recent stock assessment and the best scientific information available, and to revise management measures for Atlantic king and Spanish mackerel.
Collection of Information Under Review by Office of Management and Budget; OMB Control Number 1625-0042
In compliance with the Paperwork Reduction Act of 1995 the U.S. Coast Guard is forwarding an Information Collection Request (ICR), abstracted below, to the Office of Management and Budget (OMB), Office of Information and Regulatory Affairs (OIRA), requesting an extension of its approval for the following collection of information: 1625-0042, Requirements for Lightering of Oil and Hazardous Material Cargoes, and Advance Notice of Transfer; without change. Our ICR describes the information we seek to collect from the public. Review and comments by OIRA ensure we only impose paperwork burdens commensurate with our performance of duties.
Coastwise-Qualified Launch Barges: 46 CFR 389.3(a) Notifications
On April 27, 2023, MARAD published this notice in the Federal Register. It is being republished to ensure comments can be received and corrects the contact information and extends the comment period. To maximize the use of coastwise-qualified vessels, MARAD requests owners and operators of coastwise-qualified launch barges or other interested parties to notify the Agency of their interest in, and provide certain information relating to, the transportation, installation, or launching of platform jackets. MARAD takes this action as a resource to companies contemplating these operations on the outer continental shelf. The notifications should include information set forth in the SUPPLEMENTARY INFORMATION section below.
Establishment of Class E Airspace; Calvert, KY
This action establishes Class E airspace extending upward from 700 feet above the surface for Kentucky Dam State Park Airport, Calvert City, KY, to accommodate area navigation (RNAV) global positioning system (GPS) standard instrument approach procedures (SIAPs) serving this airport.
Amendment of Class E Airspace; Greenville, ME
This action proposes to amend Class E airspace extending upward from 700 feet above the surface for Greenville Municipal Airport, Greenville, ME, as a new instrument approach procedure has been designed for this airport. This action would also update the airport's existing extension.
Certain Small Diameter Seamless Carbon and Alloy Standard, Line and Pressure Pipe From Germany: Final Results of Expedited Fifth Sunset Review of the Antidumping Duty Order
As a result of this sunset review, the U.S. Department of Commerce (Commerce) finds that revocation of the antidumping duty (AD) order on certain small diameter seamless carbon and alloy standard, line, and pressure pipe (seamless pipe) from Germany would likely to lead to continuation or recurrence of dumping at the levels indicated in the ``Final Results of Review'' section of this notice.
Initiation of Antidumping and Countervailing Duty Administrative Reviews
The Department of Commerce (Commerce) has received requests to conduct administrative reviews of various antidumping duty (AD) and countervailing duty (CVD) orders with March anniversary dates. In accordance with Commerce's regulations, we are initiating those administrative reviews.
Carbazole Violet Pigment 23 From India: Rescission of Antidumping Duty Administrative Review; 2021-2022
The U.S. Department of Commerce (Commerce) is rescinding the administrative review of the antidumping duty order on carbazole violet pigment 23 from India for the period of review (POR) December 1, 2021, through November 30, 2022, based on the timely withdrawal of the request for review and evidence of no suspended entries during the POR.
Agency Information Collection Activities; Submission to the Office of Management and Budget for Review and Approval; Comment Request; Student Assistance General Provisions-Satisfactory Academic Progress Policy
In accordance with the Paperwork Reduction Act (PRA) of 1995, the Department is proposing an extension without change of a currently approved information collection request (ICR).
Notice of Intent To Grant an Exclusive, Co-Exclusive or Partially Exclusive Patent License
NASA hereby gives notice of its intent to grant an exclusive, co-exclusive or partially exclusive patent license to practice the inventions described and claimed in the patents and/or patent applications listed in SUPPLEMENTARY INFORMATION below.
Proposed Flood Hazard Determinations
Comments are requested on proposed flood hazard determinations, which may include additions or modifications of any Base Flood Elevation (BFE), base flood depth, Special Flood Hazard Area (SFHA) boundary or zone designation, or regulatory floodway on the Flood Insurance Rate Maps (FIRMs), and where applicable, in the supporting Flood Insurance Study (FIS) reports for the communities listed in the table below. The purpose of this notice is to seek general information and comment regarding the preliminary FIRM, and where applicable, the FIS report that the Federal Emergency Management Agency (FEMA) has provided to the affected communities. The FIRM and FIS report are the basis of the floodplain management measures that the community is required either to adopt or to show evidence of having in effect in order to qualify or remain qualified for participation in the National Flood Insurance Program (NFIP).
New Postal Products
The Commission is noticing a recent Postal Service filing for the Commission's consideration concerning a negotiated service agreement. This notice informs the public of the filing, invites public comment, and takes other administrative steps.
Notice of Availability of a Final Programmatic Environmental Assessment for Funding Aquaculture Research and Development Projects and Finding of No Significant Impact
The National Oceanic and Atmospheric Administration, Office of Oceanic and Atmospheric Research (OAR) is issuing this notice to inform the public of the availability of the final programmatic environmental assessment (PEA) to fund aquaculture research and development projects and Finding of No Significant Impact (FONSI).
Commission Information Collection Activities (FERC-725A(1B)); Comment Request; Extension
In compliance with the requirements of the Paperwork Reduction Act of 1995, the Federal Energy Regulatory Commission (Commission or FERC) is soliciting public comment on the requirements and burden of the information collection FERC 725A(1B)Mandatory Reliability Standards for the Bulk Power System. The Commission published a 60-day notice on March 2, 2023, in the Federal Register and received no comments.
Agency Information Collection Activities: Proposed Collection: Public Comment Request; Information Collection Request Title: Ryan White HIV/AIDS Program: Mpox Vaccine Distribution Request Forms, OMB No. 0915-xxxx-New
In compliance with the requirement for opportunity for public comment on proposed data collection projects of the Paperwork Reduction Act of 1995, HRSA announces plans to submit an Information Collection Request (ICR), described below, to the Office of Management and Budget (OMB). Prior to submitting the ICR to OMB, HRSA seeks comments from the public regarding the burden estimate, below, or any other aspect of the ICR.
Generac Power Systems, Inc.
The Commission publishes in the Federal Register any settlement that it provisionally accepts under the Consumer Product Safety Act. Published below is a provisionally accepted Settlement Agreement with Generac Power Systems, Inc., containing a civil penalty in the amount of $15,800,00.00, subject to the terms and conditions of the Settlement Agreement. The Commission voted unanimously (4-0) to provisionally accept the proposed Settlement Agreement and Order pertaining to Generac Power Systems, Inc.
Fomesafen; Pesticide Tolerances
This regulation establishes tolerances for residues of fomesafen in or on Vegetable, bulb, group 3-07; Vegetable, cucurbit, group 9; Vegetable, fruiting, group 8-10; and Vegetable, legume, forage and hay, except soybean, subgroup 7-22A. Interregional Research Project Number 4 (IR-4) requested these tolerances under the Federal Food, Drug, and Cosmetic Act (FFDCA).
Agency Information Collection Activities; Comment Request; IDEA Part C State Performance Plan (SPP) and Annual Performance Report (APR)
In accordance with the Paperwork Reduction Act (PRA) of 1995, the Department is proposing a revision of a currently approved information collection request (ICR).
Notice of Intent To Grant an Exclusive, Co-Exclusive or Partially Exclusive Patent License
NASA hereby gives notice of its intent to grant an exclusive, co-exclusive or partially exclusive patent license to practice the inventions described and claimed in the patents and/or patent applications listed in SUPPLEMENTARY INFORMATION below.
Changes in Flood Hazard Determinations
This notice lists communities where the addition or modification of Base Flood Elevations (BFEs), base flood depths, Special Flood Hazard Area (SFHA) boundaries or zone designations, or the regulatory floodway (hereinafter referred to as flood hazard determinations), as shown on the Flood Insurance Rate Maps (FIRMs), and where applicable, in the supporting Flood Insurance Study (FIS) reports, prepared by the Federal Emergency Management Agency (FEMA) for each community, is appropriate because of new scientific or technical data. The FIRM, and where applicable, portions of the FIS report, have been revised to reflect these flood hazard determinations through issuance of a Letter of Map Revision (LOMR), in accordance with Federal Regulations. The currently effective community number is shown in the table below and must be used for all new policies and renewals.
Final Flood Hazard Determinations
Flood hazard determinations, which may include additions or modifications of Base Flood Elevations (BFEs), base flood depths, Special Flood Hazard Area (SFHA) boundaries or zone designations, or regulatory floodways on the Flood Insurance Rate Maps (FIRMs) and where applicable, in the supporting Flood Insurance Study (FIS) reports have been made final for the communities listed in the table below. The FIRM and FIS report are the basis of the floodplain management measures that a community is required either to adopt or to show evidence of having in effect in order to qualify or remain qualified for participation in the Federal Emergency Management Agency's (FEMA's) National Flood Insurance Program (NFIP).
Changes in Flood Hazard Determinations
This notice lists communities where the addition or modification of Base Flood Elevations (BFEs), base flood depths, Special Flood Hazard Area (SFHA) boundaries or zone designations, or the regulatory floodway (hereinafter referred to as flood hazard determinations), as shown on the Flood Insurance Rate Maps (FIRMs), and where applicable, in the supporting Flood Insurance Study (FIS) reports, prepared by the Federal Emergency Management Agency (FEMA) for each community, is appropriate because of new scientific or technical data. The FIRM, and where applicable, portions of the FIS report, have been revised to reflect these flood hazard determinations through issuance of a Letter of Map Revision (LOMR), in accordance with Federal Regulations. The currently effective community number is shown in the table below and must be used for all new policies and renewals.
Proposed Flood Hazard Determinations
Comments are requested on proposed flood hazard determinations, which may include additions or modifications of any Base Flood Elevation (BFE), base flood depth, Special Flood Hazard Area (SFHA) boundary or zone designation, or regulatory floodway on the Flood Insurance Rate Maps (FIRMs), and where applicable, in the supporting Flood Insurance Study (FIS) reports for the communities listed in the table below. The purpose of this notice is to seek general information and comment regarding the preliminary FIRM, and where applicable, the FIS report that the Federal Emergency Management Agency (FEMA) has provided to the affected communities. The FIRM and FIS report are the basis of the floodplain management measures that the community is required either to adopt or to show evidence of having in effect in order to qualify or remain qualified for participation in the National Flood Insurance Program (NFIP).
Proposed Flood Hazard Determinations
Comments are requested on proposed flood hazard determinations, which may include additions or modifications of any Base Flood Elevation (BFE), base flood depth, Special Flood Hazard Area (SFHA) boundary or zone designation, or regulatory floodway on the Flood Insurance Rate Maps (FIRMs), and where applicable, in the supporting Flood Insurance Study (FIS) reports for the communities listed in the table below. The purpose of this notice is to seek general information and comment regarding the preliminary FIRM, and where applicable, the FIS report that the Federal Emergency Management Agency (FEMA) has provided to the affected communities. The FIRM and FIS report are the basis of the floodplain management measures that the community is required either to adopt or to show evidence of having in effect in order to qualify or remain qualified for participation in the National Flood Insurance Program (NFIP).
NASA Advisory Council; Science Committee; Meeting
In accordance with the Federal Advisory Committee Act, as amended, the National Aeronautics and Space Administration (NASA) announces a meeting of the Science Committee of the NASA Advisory Council (NAC). This Committee reports to the NAC. The meeting will be held for the purpose of soliciting, from the scientific community and other persons, scientific and technical information relevant to program planning.
Changes in Flood Hazard Determinations
This notice lists communities where the addition or modification of Base Flood Elevations (BFEs), base flood depths, Special Flood Hazard Area (SFHA) boundaries or zone designations, or the regulatory floodway (hereinafter referred to as flood hazard determinations), as shown on the Flood Insurance Rate Maps (FIRMs), and where applicable, in the supporting Flood Insurance Study (FIS) reports, prepared by the Federal Emergency Management Agency (FEMA) for each community, is appropriate because of new scientific or technical data. The FIRM, and where applicable, portions of the FIS report, have been revised to reflect these flood hazard determinations through issuance of a Letter of Map Revision (LOMR), in accordance with Federal Regulations. The currently effective community number is shown in the table below and must be used for all new policies and renewals.
Proposed Flood Hazard Determinations
Comments are requested on proposed flood hazard determinations, which may include additions or modifications of any Base Flood Elevation (BFE), base flood depth, Special Flood Hazard Area (SFHA) boundary or zone designation, or regulatory floodway on the Flood Insurance Rate Maps (FIRMs), and where applicable, in the supporting Flood Insurance Study (FIS) reports for the communities listed in the table below. The purpose of this notice is to seek general information and comment regarding the preliminary FIRM, and where applicable, the FIS report that the Federal Emergency Management Agency (FEMA) has provided to the affected communities. The FIRM and FIS report are the basis of the floodplain management measures that the community is required either to adopt or to show evidence of having in effect in order to qualify or remain qualified for participation in the National Flood Insurance Program (NFIP).
Notice of Intent To Grant an Exclusive, Co-Exclusive or Partially Exclusive Patent License
NASA hereby gives notice of its intent to grant an exclusive, co- exclusive or partially exclusive patent license to practice the inventions described and claimed in the patents and/or patent applications listed in SUPPLEMENTARY INFORMATION below.
Notice of Funding Opportunity for Interstate Rail Compacts
This notice details the application requirements and procedures to obtain grant funding for eligible projects under the Interstate Rail Compacts Grant Program. The opportunities described in this notice are made available under Assistance Listings Number 20.328.
This site is protected by reCAPTCHA and the Google
Privacy Policy and
Terms of Service apply.