Section 74:55:01:53.02 - Excursions - Not controlled

Universal Citation: SD Admin Rules 74:55:01:53.02
Current through Register Vol. 50, page 114, March 25, 2024

If an excursion is not controlled within 30 days following confirmation of the excursion, a sample must be collected from each of the affected monitoring wells and analyzed for the following parameters: ammonia, antimony, arsenic, barium, beryllium, bicarbonate, boron, cadmium, calcium, carbonate, chloride, chromium, conductivity, copper, fluoride, gross alpha, gross beta, iron, lead, magnesium, manganese, mercury, molybdenum, nitrate, nitrate + nitrite, pH, potassium, selenium, sodium, sulfate, radium-226 and 228, thallium, total dissolved solids, uranium, vanadium, and zinc, and any other parameter specified by the secretary, unless the secretary determines that the concentration or value of one or more parameters is not likely to occur as a result of the in situ leach mine.

If an excursion is not controlled within 60 days following confirmation of the excursion, the secretary may require the operator to conduct additional sampling of monitoring wells, installation of additional monitor wells, termination of injection in the portion of the wellfield in which the excursion originated, or a combination of approaches to assure control within a timely manner.

General Authority: SDCL 34A-2-93(15).

Law Implemented: SDCL 34A-2-48.

Disclaimer: These regulations may not be the most recent version. South Dakota may have more current or accurate information. We make no warranties or guarantees about the accuracy, completeness, or adequacy of the information contained on this site or the information linked to on the state site. Please check official sources.