Oklahoma Administrative Code
Title 252 - Department of Environmental Quality
Chapter 653 - Aquifer Storage and Recovery
Subchapter 7 - Aquifer Storage and Recovery Water Delivery Construction
Section 252:653-7-3 - Additional application requirements for recharge wells

Universal Citation: OK Admin Code 252:653-7-3

Current through Vol. 41, No. 13, March 15, 2024

In addition to the requirements of OAC 252:653-7-2, permit applications for the construction of recharge wells shall include the following:

(1) construction details to include, at a minimum, depth and diameter of casings and screens (or open hole completion), description of the installation method, construction features and specifications for the materials to be used;

(2) plugging and abandonment plan;

(3) proposed injection procedure;

(4) proposed operating data:

(A) average and maximum daily injection rates and volumes for each well;

(B) average and maximum injection pressure; and

(C) description of the injectate parameters to be monitored;

(5) any additional information DEQ determines to be necessary for the specific ASR project.

Disclaimer: These regulations may not be the most recent version. Oklahoma may have more current or accurate information. We make no warranties or guarantees about the accuracy, completeness, or adequacy of the information contained on this site or the information linked to on the state site. Please check official sources.
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.