New Mexico Administrative Code
Title 18 - TRANSPORTATION AND HIGHWAYS
Chapter 60 - PIPELINE CONSTRUCTION AND MAINTENANCE
Part 2 - PIPELINE SAFETY GENERAL PROVISIONS
Section 18.60.2.13 - OIL PIPELINE TARIFFS
Current through Register Vol. 35, No. 18, September 24, 2024
A. An owner or operator of an oil pipeline shall file with the commission at least ten (10) days prior to its effective date two (2) copies of its tariff covering intrastate movements within New Mexico.
B. An owner or operator of an oil pipeline shall file with the commission at least ten (10) days prior to its effective date two (2) copies of any changes to its tariff.
C. If an owner or operator of an oil pipeline assesses separate charges for the gathering of oil and for its transportation and delivery, the charges shall be separately specified in its tariff.
D. In determining whether an oil pipeline's rates for the transportation of oil are reasonable, the commission shall consider: