New Hampshire Code of Administrative Rules
We - Water Well Board
Chapter We 600 - STANDARDS FOR THE CONSTRUCTION, MAINTENANCE AND ABANDONMENT OF WELLS
Part We 602 - NEW WELL CONSTRUCTION
Section We 602.16 - Setback Reductions: Special Methods of Construction for Bedrock Wells
Current through Register No. 40, October 3, 2024
(a) For a bedrock well that does not comply with the setback requirements of We 602.06 through We 602.12, as applicable, a water well contractor shall:
Table 602-1 Minimum Casing Length Where a 75-foot Setback is Required
Horizontal Setback (ft.) |
Minimum Length of Casing (ft.) |
75 or greater |
20 |
70-74 |
27 |
65-69 |
37 |
60-64 |
45 |
55-59 |
51 |
50-54 |
56 |
45-49 |
60 |
40-44 |
63 |
35-39 |
66 |
30-34 |
69 |
25-29 |
71 |
Table 602-2 Minimum Casing Length Where a 50-foot Setback is Required
Horizontal Setback (ft.) |
Minimum Length of Casing (ft.) |
50 or greater |
20 |
45-49 |
22 |
40-44 |
30 |
35-39 |
36 |
30-34 |
40 |
25-29 |
43 |
(b) For purposes of determining minimum casing length for setbacks to effluent disposal areas or septic tanks, in accordance with Table 602-1, if a well is located at a higher elevation than the effluent disposal area, the difference in elevation shall be added to the minimum required casing length.