Alaska Administrative Code
Title 3 - Commerce, Community, and Economic Development
Part 7 - Regulatory Commission of Alaska
Chapter 52 - Operation of Public Utilities
Article 7 - Criteria for Determination of Power Cost Equalization
3 AAC 52.600 - Applicability, purposes, and waiver

Universal Citation: 3 AK Admin Code 52.600

Current through February 27, 2024

(a) The provisions of 3 AAC 52.600 - 3 AAC 52.690 apply to all electric utilities participating in the power cost equalization program established in AS 42.45.100-42.45.190.

(b) The purposes of 3 AAC 52.600 - 3 AAC 52.690 are to establish criteria for the determination of power cost equalization per kilowatt-hour and to encourage economic and efficient practices by participating electric utilities.

(c) Unless otherwise required under AS 42.05 or AS 42.45, a requirement in 3 AAC 52.600 - 3 AAC 52.690 may be modified or waived, in whole or in part, by order of the commission and a showing of good cause or on the commission's own motion. An applicant shall file and the commission will consider an application in accordance with 3 AAC 48.805. In considering an application, the commission will consider a participating electric utility's size, location, and accessibility, and other local conditions.

Authority:AS 42.05.141

AS 42.05.151

AS 42.45.110

AS 42.45.130

AS 42.45.160

AS 42.45.170

Disclaimer: These regulations may not be the most recent version. Alaska may have more current or accurate information. We make no warranties or guarantees about the accuracy, completeness, or adequacy of the information contained on this site or the information linked to on the state site. Please check official sources.