Alaska Administrative Code
Title 11 - Natural Resources
Part 6 - Lands
Chapter 93 - Water Management
Article 2 - Appropriation and Use of Water
11 AAC 93.140 - Water wells
Current through November 28, 2024
(a) For a drilled, driven, jetted, or augered well constructed, the water well contractor or a person who constructs the well shall file a report within 45 days after completion with both the property owner and the department. The report must contain the following information as applicable:
(b) When the drill rig is removed from the well site, the well must be sealed with a sanitary seal and a readily accessible means provided to allow for monitoring of the static water level in the well.
(c) A hand-dug well that is permanently decommissioned shall be filled by the land owner to a point 12 inches above the existing ground level with well-compacted impermeable material.
(d) A well, other than a hand-dug well, that is permanently decommissioned by the owner of the well must comply with the requirements of 18 AAC 80.015(e).
(e) If the department believes that an encounter of oil, gas, or other hazardous substance is likely to result from well drilling, the department will notify the Alaska Oil and Gas Conservation Commission, and the provisions of AS 31.05.030(g) may apply.
(f) The department will notify the Department of Environmental Conservation of any permanently abandoned well that may contaminate water of the state under the provisions of 18 AAC 80.
(g) Information required by (a) of this section is required for any water well that has been deepened, modified, or abandoned, and for any water supply well or water well that is used for monitoring, observation, or aquifer testing, including a dry or low-yield water well that is not used.
Authority:AS 38.05.020
AS 38.05.035
AS 46.15.020