Office of Energy Efficiency and Renewable Energy 2011 – Federal Register Recent Federal Regulation Documents

Nationwide Categorical Waivers Under Section 1605 (Buy American) of the American Recovery and Reinvestment Act of 2009 (Recovery Act)
Document Number: 2011-12719
Type: Notice
Date: 2011-05-24
Agency: Department of Energy, Office of Energy Efficiency and Renewable Energy
The U.S. Department of Energy (DOE) is hereby granting a nationwide limited waiver of the Buy American requirements of section 1605 of the Recovery Act under the authority of Section 1605(b)(2), (iron, steel, and the relevant manufactured goods are not produced in the United States in sufficient and reasonably available quantities and of a satisfactory quality), with respect to: (1) 400 to 750 watt micro hydro-turbines meeting the specifications detailed below; (2) Oil fired direct vent space heaters for use in buildings that do not have ducts or piping for boiler heating systems; (3) ENERGY STAR rated electric heat pump water heaters and ENERGY STAR rated through-the-wall air conditioners; (4) Grid tied solar inverters of 800W or less, for applications where the panels generate 139VDC or less (not including micro-inverters); (5) 50 hp TEFC inverter duty motors for use in an existing Marley cooling tower; (6) Geothermal heat pumps for demonstration scale waste heat geothermal systems that allow the direct use of untreated wastewater to heat and cool commercial buildings; (7) Point to point/point to multi-point electronic broadband microwave radio systems with alignment tone and IE browser interface; (8) LED luminaires for roadway illumination with customized filter application to meet specific lighting requirements of Mauna Kea observatory; (9) Compressed Natural Gas (CNG) compressors, able to provide 3600 psi (248 bar) temperature compensated CNG supply to fast fill storage and fueling dispensers, efficient and adaptable to a small fleet (approximately 5 vehicles), as well as the wireless remote shut down controls (transmitters and receivers) for those CNG systems; (10) 8000W solar inverters for use with U.S. manufactured 315W panels; (11) Electronically commutated motor (ECM) type inline pumps; and (12) Inverters that permit optimal output of four (4) or more types of modules per array connected to inverter that will be used on eligible EERE-Recovery Act funded projects.
Agency Information Collection Extension
Document Number: 2011-12718
Type: Notice
Date: 2011-05-24
Agency: Department of Energy, Office of Energy Efficiency and Renewable Energy
The Department of Energy (DOE), pursuant to the Paperwork Reduction Act of 1995), intends to extend for three years, an information collection request with the Office of Management and Budget (OMB). Comments are invited on: (a) Whether the extended collection of information is necessary for the proper performance of the functions of the agency, including whether the information shall have practical utility; (b) the accuracy of the agency's estimate of the burden of the proposed collection of information, including the validity of the methodology and assumptions used; (c) ways to enhance the quality, utility, and clarity of the information to be collected; and (d) ways to minimize the burden of the collection of information on respondents, including through the use of automated collection techniques or other forms of information technology.
Nationwide Categorical Waivers Under Section 1605 (Buy American) of the American Recovery and Reinvestment Act of 2009 (Recovery Act)
Document Number: 2011-12717
Type: Notice
Date: 2011-05-24
Agency: Department of Energy, Office of Energy Efficiency and Renewable Energy
The U.S. Department of Energy (DOE) is hereby granting a nationwide limited waiver of the Buy American requirements of section 1605 of the Recovery Act under the authority of Section 1605(b)(2), (iron, steel, or the relevant manufactured goods are not produced in the United States at a reasonable cost), with respect to 300 Spanish Red Clay Tiles to be used on the Eagle Pass Library roof, a sub-grantee of the Texas State Energy Office, recipient of EECBG grant EE0000893.
Proposed Agency Information Collection
Document Number: 2011-12593
Type: Notice
Date: 2011-05-23
Agency: Department of Energy, Office of Energy Efficiency and Renewable Energy
The Department of Energy (DOE) invites public comment on a proposed collection of information that DOE is developing for submission to the Office of Management and Budget (OMB) pursuant to the Paperwork Reduction Act of 1995. Comments are invited on: (a) Whether the proposed collection of information is necessary for the proper performance of the functions of the agency, including whether the information shall have practical utility; (b) the accuracy of the agency's estimate of the burden of the proposed collection of information, including the validity of the methodology and assumptions used; (c) ways to enhance the quality, utility, and clarity of the information to be collected; and (d) ways to minimize the burden of the collection of information on respondents, including through the use of automated collection techniques or other forms of information technology.
Petition for Waiver From LG Electronics, Inc. and Granting of the Interim Waiver From Commercial Package Air Conditioner and Heat Pump Test Procedures
Document Number: 2011-12590
Type: Notice
Date: 2011-05-23
Agency: Department of Energy, Office of Energy Efficiency and Renewable Energy
This notice announces receipt of and publishes a petition for waiver from LG Electronics, Inc. (LG). The petition for waiver (hereafter ``petition'') requests a waiver from the U.S. Department of Energy (DOE) test procedure applicable to commercial package air-source and water-source central air conditioners and heat pumps. The petition is specific to the variable capacity Multi V SYNC II and Multi V Water II (commercial) multi-split heat pump models specified in LG's petition. Through this document, DOE: (1) Solicits comments, data, and information with respect to the LG petition; and (2) announces the grant of an interim waiver to LG from the existing DOE test procedure for the subject commercial multi-split air conditioners and heat pumps.
Hydrogen and Fuel Cell Technical Advisory Committee (HTAC)
Document Number: 2011-12193
Type: Notice
Date: 2011-05-18
Agency: Department of Energy, Office of Energy Efficiency and Renewable Energy
The Hydrogen and Fuel Cell Technical Advisory Committee (HTAC) was established under section 807 of the Energy Policy Act of 2005 (EPACT), Public Law 109-58; 119 Stat. 849. The Federal Advisory Committee Act, Public Law 92-463, 86 Stat. 770, requires that agencies publish notice of an advisory committee meeting in the Federal Register.
Interagency Management Task Force Public Meeting
Document Number: 2011-9830
Type: Notice
Date: 2011-04-22
Agency: Department of Energy, Office of Energy Efficiency and Renewable Energy
The Federal Energy Management Program (FEMP) will hold public meetings of the Interagency Energy Management Task Force (Task Force) in 2011. FEMP intends to hold recurring public meetings of the Task Force. Interested parties can check https://www.femp.energy.gov/news/ events.html for the time, location, agenda, and related materials of the meetings. The purpose of the town hall meetings is to provide information on current Federal energy management activities.
Energy Conservation Program for Consumer Products: Notice of Petition for Waiver of Samsung Electronics America, Inc. From the Department of Energy Residential Clothes Washer Test Procedure, and Grant of Interim Waiver
Document Number: 2011-9475
Type: Notice
Date: 2011-04-19
Agency: Department of Energy, Office of Energy Efficiency and Renewable Energy
This notice announces receipt of and publishes the Samsung Electronics America, Inc. (Samsung) petition for waiver and application for interim waiver (hereafter, ``petition'') from specified portions of the U.S. Department of Energy (DOE) test procedure for determining the energy consumption of clothes washers. Today's notice also grants an interim waiver of the clothes washer test procedure. Through this notice, DOE also solicits comments with respect to the Samsung petition.
Energy Conservation Program for Consumer Products: Decision and Order Granting a Waiver to LG From the Department of Energy Residential Clothes Washer Test Procedure
Document Number: 2011-9474
Type: Notice
Date: 2011-04-19
Agency: Department of Energy, Office of Energy Efficiency and Renewable Energy
The U.S. Department of Energy (DOE) gives notice of the decision and order (Case No. CW-018) that grants to LG Electronics U.S.A., Inc. (LG) a waiver from the DOE clothes washer test procedure for determining the energy consumption of clothes washers for the basic models set forth in its petition for waiver. Under today's decision and order, LG shall be required to test and rate these clothes washers with larger clothes containers using an alternate test procedure that takes the larger capacities into account when measuring energy consumption.
Energy Conservation Program for Certain Industrial Equipment: Publication of the Petition for Waiver From Carrier Corporation and Granting of the Interim Waiver From the Department of Energy Commercial Package Air Conditioner and Heat Pump Test Procedures
Document Number: 2011-8401
Type: Notice
Date: 2011-04-08
Agency: Department of Energy, Office of Energy Efficiency and Renewable Energy
This notice announces receipt of and publishes a petition for waiver from Carrier Corporation (Carrier). The petition for waiver (hereafter ``petition'') requests a waiver from the U.S. Department of Energy (DOE) test procedure applicable to commercial package air-source central air conditioners and heat pumps. The petition is specific to the Carrier variable capacity Super Modular Multi-System SMMSi (commercial) multi-split heat pumps. Through this document, DOE: (1) Solicits comments, data, and information with respect to the Carrier petition; and (2) announces the grant of an interim waiver to Carrier from the existing DOE test procedure for the subject commercial multi- split air conditioners and heat pumps.
Petition for Waiver From DaikinAC (Americas) Inc. and Granting of the Interim Waiver From the Department of Energy Commercial Package Air Conditioner and Heat Pump Test Procedure
Document Number: 2011-8220
Type: Notice
Date: 2011-04-06
Agency: Department of Energy, Office of Energy Efficiency and Renewable Energy
This notice announces receipt of and publishes a petition for waiver from DaikinAC (Americas) Inc. (Daikin). The petition for waiver (hereafter ``petition'') requests a waiver from the U.S. Department of Energy (DOE) test procedure applicable to commercial package air-source central air conditioners and heat pumps. The petition is specific to the Daikin variable capacity VRV III-PB variable refrigerant flow (VRF) commercial multi-split heat pumps (``VRV III-PB multi-split heat pumps''). Through this document, DOE: solicits comments, data, and information with respect to the Daikin petition; and announces the grant of an interim waiver to Daikin from the existing DOE test procedure for the subject commercial multi-split heat pumps.
Energy Conservation Program for Certain Industrial Equipment: Publication of the Petition for Waiver From Mitsubishi Electric and Electronics USA, Inc. and Granting of the Interim Waiver From the Department of Energy Commercial Package Air Conditioner and Heat Pump Test Procedures
Document Number: 2011-8145
Type: Notice
Date: 2011-04-06
Agency: Department of Energy, Office of Energy Efficiency and Renewable Energy
This notice announces receipt of and publishes a petition for waiver from Mitsubishi Electric and Electronics USA, Inc. (Mitsubishi). The petition for waiver (hereafter ``petition'') requests a waiver from the U.S. Department of Energy (DOE) test procedure applicable to commercial package air-source central air conditioners and heat pumps. The petition is specific to additional indoor units of the Mitsubishi variable capacity WR2, WY and S&L Class (commercial) multi-split heat pumps. Through this document, DOE: Solicits comments, data, and information with respect to the Mitsubishi petition; and announces the grant of an interim waiver to Mitsubishi from the existing DOE test procedure for the subject commercial multi-split air conditioners and heat pumps.
Energy Conservation Program for Consumer Products: Publication of the Petition for Waiver and Notice of Granting the Application for Interim Waiver of BSH Home Appliances Corporation From the Department of Energy Residential Clothes Dryer Test Procedure
Document Number: 2011-8143
Type: Notice
Date: 2011-04-06
Agency: Department of Energy, Office of Energy Efficiency and Renewable Energy
This notice announces receipt of and publishes the BSH Home Appliances Corporation (BSH) petition for waiver (hereafter, ``petition'') from specified portions of the U.S. Department of Energy (DOE) test procedure for determining the energy consumption of residential clothes dryers. The waiver request pertains to BSH's specified models of condensing residential clothes dryers. The existing test procedure does not apply to condensing clothes dryers. In addition, today's notice grants BSH an interim waiver from the DOE test procedure applicable to residential clothes dryers. DOE solicits comments, data, and information concerning BSH's petition.
Energy Conservation Program for Consumer Products: Decision and Order Granting a Waiver to Electrolux From the Department of Energy Residential Refrigerator and Refrigerator-Freezer Test Procedures
Document Number: 2011-8142
Type: Notice
Date: 2011-04-06
Agency: Department of Energy, Office of Energy Efficiency and Renewable Energy
The U.S. Department of Energy (DOE) gives notice of the decision and order (Case No. RF-017) that grants to Electrolux Home Products, Inc. (Electrolux) a waiver from the DOE electric refrigerator and refrigerator-freezer test procedures for certain basic models containing relative humidity sensors and adaptive control anti-sweat heaters. Under today's decision and order, Electrolux shall be required to test and rate its refrigerator-freezers with relative humidity sensors and adaptive control anti-sweat heaters using an alternate test procedure that takes this technology into account when measuring energy consumption.
Objective Merit Review of Discretionary Financial Assistance and Other Transaction Authority Applications
Document Number: 2011-7581
Type: Notice
Date: 2011-03-31
Agency: Department of Energy, Office of Energy Efficiency and Renewable Energy
This Notice establishes the procedure for program offices operating under the authority of the Assistant Secretary for Energy Efficiency and Renewable Energy in conducting the objective merit review of discretionary financial assistance and Other Transaction Authority funding applications. The effective date for the Objective Merit Review Procedure contained in this notice is March 18, 2011.
Energy Conservation Program for Consumer Products: Decision and Order Granting a Waiver to Miele From the Department of Energy Residential Clothes Dryer Test Procedure (Case No. CD-005)
Document Number: 2011-7449
Type: Notice
Date: 2011-03-30
Agency: Department of Energy, Office of Energy Efficiency and Renewable Energy
The U.S. Department of Energy (DOE) gives notice of the decision and order (Case No. CD-005) that grants to Miele, Inc. (Miele) a waiver from the DOE clothes dryer test procedure. The waiver pertains to the specified models of condensing residential clothes dryers specified in Miele's petition. Condensing clothes dryers cannot be tested using the existing test procedure. Under today's decision and order, Miele shall be not be required to test and rate its specified models of residential condensing clothes dryer pursuant to the DOE test procedure.
Energy Conservation Program for Consumer Products: Notice of Petition for Waiver of BSH Corporation From the Department of Energy Residential Dishwasher Test Procedure, and Grant of Interim Waiver
Document Number: 2011-7448
Type: Notice
Date: 2011-03-30
Agency: Department of Energy, Office of Energy Efficiency and Renewable Energy
This notice announces receipt of and publishes the BSH Corporation (BSH) petition for waiver (hereafter, ``petition'') from specified portions of the U.S. Department of Energy (DOE) test procedure for determining the energy consumption of dishwashers. Today's notice also grants an interim waiver of the dishwasher test procedure. Through this notice, DOE also solicits comments with respect to the BSHpetition.
Energy Conservation Program for Consumer Products: Publication of the Petition for Waiver and Notice of Granting the Application for Interim Waiver of Samsung From the Department of Energy Residential Refrigerator and Refrigerator-Freezer Test Procedure
Document Number: 2011-7089
Type: Notice
Date: 2011-03-25
Agency: Department of Energy, Office of Energy Efficiency and Renewable Energy
This notice announces receipt of and publishes the Samsung Electronics America, Inc. (Samsung) petition for waiver (hereafter, ``petition'') from specified portions of the U.S. Department of Energy (DOE) test procedure for determining the energy consumption of electric refrigerators and refrigerator-freezers. The waiver request pertains to Samsung's product lines that incorporate multiple defrost cycles. In its petition, Samsung provides an alternate test procedure that DOE recently published in an interim final rule. DOE solicits comments, data, and information concerning Samsung's petition and the suggested alternate test procedure. DOE also publishes notice of the grant of an interim waiver to Samsung.
Proposed Agency Information Collection
Document Number: 2011-5614
Type: Notice
Date: 2011-03-11
Agency: Department of Energy, Office of Energy Efficiency and Renewable Energy
The Department of Energy (DOE) invites public comment on a proposed collection of information to support the Weatherization Assistance Program ARRA-Period Evaluation that DOE is developing for submission to the Office of Management and Budget (OMB) pursuant to the Paperwork Reduction Act of 1995. Comments submitted in response to this notice will be summarized and/or included in the request for OMB approval of this information collection; they also will become a matter of public record. Information about the operation of the program, energy used before and after weatherization, energy used by control group low-income homes, the effectiveness of specific energy efficiency measures, customer satisfaction with the program, and non-energy benefits is needed for a comprehensive and rigorous evaluation of the program operated during the American Recovery and Reinvestment Act of 2009 (ARRA), which includes Program Years 2009, 2010, and 2011.
Energy Conservation Program for Consumer Products: Decision and Order Granting a Waiver to Samsung Electronics America, Inc. From the Department of Energy Residential Clothes Washer Test Procedure
Document Number: 2011-5506
Type: Notice
Date: 2011-03-10
Agency: Department of Energy, Office of Energy Efficiency and Renewable Energy
The U.S. Department of Energy (DOE) gives notice of the decision and order (Case No. CW-014) that grants to Samsung Electronics America, Inc. (Samsung) a waiver from the DOE clothes washer test procedure for determining the energy consumption of clothes washers. Under today's decision and order, Samsung shall be required to test and rate its clothes washers with larger clothes containers using an alternate test procedure that takes this technology into account when measuring energy consumption.
Energy Conservation Program for Consumer Products: Representative Average Unit Costs of Energy
Document Number: 2011-5501
Type: Notice
Date: 2011-03-10
Agency: Department of Energy, Office of Energy Efficiency and Renewable Energy
In this notice, the U.S. Department of Energy (DOE) is forecasting the representative average unit costs of five residential energy sources for the year 2011 pursuant to the Energy Policy and Conservation Act. The five sources are electricity, natural gas, No. 2 heating oil, propane, and kerosene.
Energy Conservation Program for Consumer Products: Decision and Order Granting a Waiver to Daikin AC (Americas), Inc. (Daikin) From the Department of Energy Residential Central Air Conditioner and Heat Pump Test Procedures
Document Number: 2011-4619
Type: Notice
Date: 2011-03-02
Agency: Department of Energy, Office of Energy Efficiency and Renewable Energy
This notice publishes the U.S. Department of Energy's (DOE) decision and order in Case No. CAC-028. DOE grants a waiver to Daikin from the existing DOE test procedure applicable to residential central air conditioners and heat pumps. The waiver request is specific to the Daikin Altherma air-to-water heat pump with integrated domestic water heating. The test method for central air conditioners and heat pumps contained in Title 10 of the Code of Federal Regulation (10 CFR) part 430, subpart B, appendix M does not include any provisions to account for the operational characteristics of an air-to-water heat pump, or any central air-conditioning heat pump with an integrated domestic hot water component. As a condition of this waiver, Daikin must test and rate its Altherma heat pump products according to the alternate test procedure set forth in this notice.
Energy Conservation Program for Consumer Products: Decision and Order Granting a Waiver to Electrolux From the Department of Energy Residential Clothes Washer Test Procedure
Document Number: 2011-4608
Type: Notice
Date: 2011-03-02
Agency: Department of Energy, Office of Energy Efficiency and Renewable Energy
The U.S. Department of Energy (DOE) gives notice of the decision and order (Case No. CW-017) that grants to Electrolux Home Products (Electrolux) a waiver from the DOE clothes washer test procedure for determining the energy consumption of clothes washers. Under today's decision and order, Electrolux shall be required to test and rate its clothes washers with larger clothes containers using an alternate test procedure that takes the larger capacities into account when measuring energy consumption.
Energy Conservation Program for Consumer Products: Decision and Order Granting a Waiver to LG From the Department of Energy Residential Clothes Washer Test Procedure
Document Number: 2011-4486
Type: Notice
Date: 2011-03-01
Agency: Department of Energy, Office of Energy Efficiency and Renewable Energy
The U.S. Department of Energy (DOE) gives notice of the decision and order (Case No. CW-016) that grants to LG Electronics U.S.A., Inc. (LG) a waiver from the DOE clothes washer test procedure for determining the energy consumption of clothes washers. Under today's decision and order, LG shall be required to test and rate its clothes washers with larger clothes containers using an alternate test procedure that takes the larger capacities into account when measuring energy consumption.
Energy Conservation Program for Consumer Products: Notice of Petition for Waiver of LG Electronics USA, Inc. From the Department of Energy Residential Clothes Washer Test Procedure, and Grant of Interim Waiver
Document Number: 2011-4485
Type: Notice
Date: 2011-03-01
Agency: Department of Energy, Office of Energy Efficiency and Renewable Energy
This notice announces receipt of and publishes the LG Electronics USA, Inc. (LG) petition for waiver and application for interim waiver (hereafter, ``petition'') from specified portions of the U.S. Department of Energy (DOE) test procedure for determining the energy consumption of clothes washers. Today's notice also grants an interim waiver of the clothes washer test procedure. Through this notice, DOE also solicits comments with respect to the LG petition.
Nationwide Categorical Waivers Under Section 1605 (Buy American) of the American Recovery and Reinvestment Act of 2009 (Recovery Act)
Document Number: 2011-3850
Type: Notice
Date: 2011-02-22
Agency: Department of Energy, Office of Energy Efficiency and Renewable Energy
The U.S. Department of Energy (DOE) is hereby granting a nationwide limited waiver of the Buy American requirements of section 1605 of the Recovery Act under the authority of Section 1605(b)(2) (iron, steel, and the relevant manufactured goods are not produced in the United States in sufficient and reasonably available quantities and of a satisfactory quality) with respect to (1) two-stage, steam heated absorption chillers rated at 500-1,500 tons; (2) single wall evacuated tube collectors for solar thermal systems (when used in an educational context for the purposes of comparing relative efficiency of solar thermal technologies); (3) 2-ton adsorption chillers (for educational purposes, or where alternative technologies are not serviceable); (4) LED Lamp and controller for studio lights in a television broadcast studio (where a CRI (Color Rendition Index) sufficient to render accurate flesh tones and natural colors and a precise color tuning control to dial in exact color temperature for accurate colors under multiple lighting setups are required); (5) Global Positioning System (GPS) Time Source Modules (to serve as direct communication link between a county or city's Traffic Management System (TMS) and the Caltrans Traffic Signal Management and Surveillance System (CTNET)); and (6) elongated wall-hung rear spud toilets (bowl and hardware) that will be used on eligible EERE Recovery Act-funded projects.
Nationwide Limited Public Interest Waiver Under Section 1605 (Buy American) of the American Recovery and Reinvestment Act of 2009 (Recovery Act)
Document Number: 2011-3849
Type: Notice
Date: 2011-02-22
Agency: Department of Energy, Office of Energy Efficiency and Renewable Energy
The U.S. Department of Energy (DOE) is hereby granting a six- month extension of the amended nationwide limited waiver of the Buy American requirements of section 1605 of the Recovery Act under the authority of section 1605(b)(1) (amended public interest waiver), with respect to the following solar photo-voltaic (PV) equipment: (1) Domestically-manufactured modules containing foreign-manufactured cells, (2) Foreign-manufactured modules, when completely comprised of domestically-manufactured cells, and (3) Any ancillary items and equipment (including, but not limited to, charge controllers, combiners and disconnect boxes, breakers and fuses, racks, trackers, lugs, wires, cables and all otherwise incidental equipment with the exception of inverters and batteries) when utilized in a solar installation involving a U.S. manufactured PV module, or a module manufactured abroad but comprised exclusively of domestically-manufactured cells until August 6, 2011. This waiver expires August 6, 2011 (six months from the date of expiration of the original waiver). Recipients of EERE Recovery Act funds who have taken substantial steps to commit funds for the purchase of the items covered in this waiver by August 6, 2011 will not be impacted by the expiration of this waiver.
Biomass Research and Development Technical Advisory Committee
Document Number: 2011-3599
Type: Notice
Date: 2011-02-17
Agency: Department of Energy, Office of Energy Efficiency and Renewable Energy
This notice announces an open meeting of the Biomass Research and Development Technical Advisory Committee under Section 9008(d) of the Food, Conservation, and Energy Act of 2008. The Federal Advisory Committee Act (Pub. L. 92-463, 86 Stat. 770) requires that agencies publish these notices in the Federal Register to allow for public participation. This notice is being published less than 15 days prior to the meeting date due to programmatic issues, logistical circumstances, and members' availability.
Energy Efficiency and Renewable Energy Advisory Committee (ERAC)
Document Number: 2011-2588
Type: Notice
Date: 2011-02-07
Agency: Department of Energy, Office of Energy Efficiency and Renewable Energy
The purpose of the ERAC is to provide advice and recommendations to the Secretary of Energy on the research, development, demonstration, and deployment priorities within the field of energy efficiency and renewable energy. The Federal Advisory Committee Act, Public Law 92-463, 86 Stat. 770, requires that agencies publish notice of an advisory committee meeting in the Federal Register.
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.