Office of Energy Efficiency and Renewable Energy March 2, 2011 – Federal Register Recent Federal Regulation Documents
Results 1 - 2 of 2
Energy Conservation Program for Consumer Products: Decision and Order Granting a Waiver to Daikin AC (Americas), Inc. (Daikin) From the Department of Energy Residential Central Air Conditioner and Heat Pump Test Procedures
This notice publishes the U.S. Department of Energy's (DOE) decision and order in Case No. CAC-028. DOE grants a waiver to Daikin from the existing DOE test procedure applicable to residential central air conditioners and heat pumps. The waiver request is specific to the Daikin Altherma air-to-water heat pump with integrated domestic water heating. The test method for central air conditioners and heat pumps contained in Title 10 of the Code of Federal Regulation (10 CFR) part 430, subpart B, appendix M does not include any provisions to account for the operational characteristics of an air-to-water heat pump, or any central air-conditioning heat pump with an integrated domestic hot water component. As a condition of this waiver, Daikin must test and rate its Altherma heat pump products according to the alternate test procedure set forth in this notice.
Energy Conservation Program for Consumer Products: Decision and Order Granting a Waiver to Electrolux From the Department of Energy Residential Clothes Washer Test Procedure
The U.S. Department of Energy (DOE) gives notice of the decision and order (Case No. CW-017) that grants to Electrolux Home Products (Electrolux) a waiver from the DOE clothes washer test procedure for determining the energy consumption of clothes washers. Under today's decision and order, Electrolux shall be required to test and rate its clothes washers with larger clothes containers using an alternate test procedure that takes the larger capacities into account when measuring energy consumption.
This site is protected by reCAPTCHA and the Google
Privacy Policy and
Terms of Service apply.