Setpoints for Safety-Related Instrumentation
The U.S. Nuclear Regulatory Commission (NRC) is issuing Revision 4 to Regulatory Guide (RG) 1.105, ``Setpoints for Safety- Related Instrumentation.'' This RG describes an approach that is acceptable to the staff of the NRC to meet regulatory requirements ensuring that setpoints for safety-related instrumentation are established and maintained within the technical specification limits. RG 1.105 has been revised to incorporate additional information regarding American National Standards Institute (ANSI)/International Society of Automation (ISA) Standard 67.04.01-2018, ``Setpoints for Nuclear Safety Related Instrumentation.''
Design Limits, Loading Combinations, Materials, Construction and Testing of Concrete Containments
The U.S. Nuclear Regulatory Commission (NRC) is issuing Revision 4 to Regulatory Guide (RG) 1.136, ``Design Limits, Loading Combinations, Materials, Construction and Testing of Concrete Containments.'' It updates the guidance for materials, design, construction, fabrication, examination, and testing of concrete containments in nuclear power plants through endorsement, with exceptions, of the 2019 edition of the American Society of Mechanical Engineers (ASME) Boiler & Pressure Vessel (B&PV) Code, Section III, Division 2 (American Concrete Institute (ACI) Standard 359-19), ``Code for Concrete Containments.''
Final Revision to Branch Technical Position 7-19 Guidance for Evaluation of Defense in Depth and Diversity to Address Common-Cause Failure Due to Latent Design Defects in Digital Safety Systems; Correction
The U.S. Nuclear Regulatory Commission (NRC) is correcting a notice that was published in the Federal Register on January 29, 2021, regarding the final revision to Branch Technical Position (BTP) 7-19, ``Guidance for Evaluation of Defense in Depth and Diversity to Address Common-Cause Failure Due to Latent Design Defects in Digital Safety Systems.'' This action is necessary to correct the Agency Document Access and Management System (ADAMS) Accession number for the staff responses to public comments on the draft version of BTP 7-19.
Revision of Fee Schedules; Fee Recovery for Fiscal Year 2021
The U.S. Nuclear Regulatory Commission (NRC) is proposing to amend the licensing, inspection, special project, and annual fees charged to its applicants and licensees. These proposed amendments are necessary to implement the Nuclear Energy Innovation and Modernization Act (NEIMA), which, starting in fiscal year (FY) 2021, requires the NRC to recover, to the maximum extent practicable, approximately 100 percent of its annual budget less certain amounts excluded from this fee-recovery requirement. In addition, the NRC is also proposing improvements associated with fee invoicing to implement provisions in NEIMA.