Nuclear Regulatory Commission June 20, 2019 – Federal Register Recent Federal Regulation Documents

Evaluations of Uranium Recovery Facility Surveys of Radon and Radon Progeny
Document Number: 2019-13005
Type: Notice
Date: 2019-06-20
Agency: Nuclear Regulatory Commission, Agencies and Commissions
The U.S. Nuclear Regulatory Commission (NRC) is issuing Interim Staff Guidance (ISG) DUWP-ISG-01, ``Evaluations of Uranium Recovery Facility Surveys of Radon and Radon Progeny in Air and Demonstrations of Compliance with 10 CFR 20.1301.'' This ISG provides guidance to the NRC staff for evaluating uranium recovery (UR) licensee demonstrations of compliance with the public dose limits. This action is necessary because there is insufficient existing guidance on this topic. This action will benefit NRC staff and UR licensees by providing detailed descriptions of methods acceptable to the NRC staff to meet the public dose limit requirement.
Withdrawal of Regulatory Issue Summary 2005-29 and its Draft Revision 1 Anticipated Transients That Could Develop Into More Serious Events
Document Number: 2019-12725
Type: Proposed Rule
Date: 2019-06-20
Agency: Nuclear Regulatory Commission, Agencies and Commissions
The U.S. Nuclear Regulatory Commission (NRC) is withdrawing the Regulatory Issue Summary (RIS) 2005-29 and its draft Revision 1, ``Anticipated Transients that Could Develop into More Serious Events.'' These documents are being withdrawn because the NRC staff identified several regulatory and technical positions within the RIS and draft Revision 1 that either required clarification, were no longer supported, or were identified as a new agency position.
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.