Nuclear Regulatory Commission February 1, 2019 – Federal Register Recent Federal Regulation Documents

Exelon Generation Company, LLC, Byron Station, Unit No. 2
Document Number: 2019-00734
Type: Notice
Date: 2019-02-01
Agency: Nuclear Regulatory Commission, Agencies and Commissions
The license amendment request was originally noticed in the Federal Register on November 6, 2018. The notice is being reissued in its entirety to include the revised scope, description of the amendment request, and proposed no significant hazards consideration determination. The U.S. Nuclear Regulatory Commission (NRC) is considering issuance of an amendment to Facility Operating License No. NPF-66, issued to Exelon Generation Company, LLC, for operation of the Byron Station, Unit No. 2. The proposed amendment would revise technical specification 4.2.1 to authorize use of two lead test assemblies (LTAs) containing a limited number of accident tolerant fuel (ATF) lead test rods (LTRs) during Byron Station, Unit No. 2, refueling cycles 22, 23, and 24. The LTAs would be nonlimiting under steady state reactor conditions and will comply with fuel limits specified in the core operating limits report and technical specifications under all operational conditions.
In the Matter of Southern Nuclear Operating Company, Inc.; Joseph M. Farley Nuclear Plant
Document Number: 2019-00688
Type: Notice
Date: 2019-02-01
Agency: Nuclear Regulatory Commission, Agencies and Commissions
The U.S. Nuclear Regulatory Commission (NRC) issued a confirmatory order (Order) to Southern Nuclear Operating Company, Inc., (the licensee), confirming the agreement reached in an Alternative Dispute Resolution mediation session held on September 21-22, 2018. This Order will ensure the licensee restores compliance with NRC regulations.
Licensing Support Network Advisory Review Panel
Document Number: 2019-00599
Type: Notice
Date: 2019-02-01
Agency: Nuclear Regulatory Commission, Agencies and Commissions
Entergy Operations, Inc.; Waterford Steam Electric Station, Unit 3
Document Number: 2019-00585
Type: Notice
Date: 2019-02-01
Agency: Nuclear Regulatory Commission, Agencies and Commissions
The U.S. Nuclear Regulatory Commission (NRC) has issued Renewed Facility Operating License No. NPF-38 to Entergy Operations, Inc., (EOI), the operator of the Waterford Steam Electric Station, Unit 3 (WF3), and Entergy Louisiana, LLC, the owner of WF3 (together Entergy or the licensees). Renewed Facility Operating License No. NPF-38 authorizes EOI to operate WF3 at reactor core power levels not in excess of 3,716 megawatts thermal, in accordance with the provisions of the WF3 renewed license and technical specifications. In addition, the NRC has prepared a record of decision (ROD) that supports the NRC's decision to renew Facility Operating License No. NPF-38.
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.