Nuclear Regulatory Commission December 1, 2016 – Federal Register Recent Federal Regulation Documents
Results 1 - 1 of 1
Tennessee Valley Authority; Browns Ferry Nuclear Plant, Units 1, 2, and 3
The U.S. Nuclear Regulatory Commission (NRC) is considering issuance of amendments to Renewed Facility Operating License Nos. DPR- 33, DPR-52, and DPR-68 issued to Tennessee Valley Authority (TVA, the licensee) for operation of Browns Ferry Nuclear Plant, Units 1, 2, and 3 (BFN) located in Limestone County, Alabama. The proposed amendments would increase the maximum licensed thermal power level for each reactor from 3,458 megawatts thermal (MWt) to 3,952 MWt. This change, referred to as an extended power uprate (EPU), represents an increase of approximately 14.3 percent above the current licensed thermal power limit. The NRC is issuing a draft environmental assessment (EA) and draft finding of no significant impact (FONSI) for public comment associated with the proposed EPU.
This site is protected by reCAPTCHA and the Google
Privacy Policy and
Terms of Service apply.