Virgil C. Summer Nuclear Station, Units 2 and 3; South Carolina Electric & Gas Company; Turbine Building Battery Room and Electrical Changes
The U.S. Nuclear Regulatory Commission (NRC) is granting an exemption to allow a departure from the certification information of Tier 1 of the generic design control document (DCD) and issuing License Amendment No. 19 to Combined Licenses (COL), NPF-93 and NPF-94. The COLs were issued to South Carolina Electric & Gas Company (SCE&G), and South Carolina Public Service Authority (the licensee), for construction and operation of the Virgil C. Summer Nuclear Station (VCSNS), Units 2 and 3 located in Fairfield County, South Carolina. The amendment consists of changes to (1) increase Non Class 1E dc and uninterruptible power supply (UPS) System (EDS) total equipment capacity, component ratings, and protective device sizing to support increased load demand, (2) relocate equipment and moving Turbine Building (TB) first bay EDS Battery Room and Charger Room. The floor elevation increases from elevation 148'-0'' to elevation 148'-10'' to accommodate associated equipment cabling with this activity, and (3) remove the Class 1E Class 1E dc and UPS System (IDS) Battery Back-up tie to the Non-Class 1E EDS Battery. The granting of the exemption allows the changes to Tier 1 information asked for in the amendment. Because the acceptability of the exemption was determined in part by the acceptability of the amendment, the exemption and amendment are being issued concurrently.
Biweekly Notice; Applications and Amendments to Facility Operating Licenses and Combined Licenses Involving No Significant Hazards Considerations
Pursuant to Section 189a.(2) of the Atomic Energy Act of 1954, as amended (the Act), the U.S. Nuclear Regulatory Commission (NRC) is publishing this regular biweekly notice. The Act requires the Commission to publish notice of any amendments issued, or proposed to be issued and grants the Commission the authority to issue and make immediately effective any amendment to an operating license or combined license, as applicable, upon a determination by the Commission that such amendment involves no significant hazards consideration, notwithstanding the pendency before the Commission of a request for a hearing from any person. This biweekly notice includes all notices of amendments issued, or proposed to be issued from November 13, 2014 to November 26, 2014. The last biweekly notice was published on November 25, 2014.