Nuclear Regulatory Commission August 11, 2014 – Federal Register Recent Federal Regulation Documents
Results 1 - 3 of 3
Virgil C. Summer Nuclear Station, Units 2 and 3; South Carolina Electric and Gas; Changes to the Structures and Layout of the Turbine Building
The U.S. Nuclear Regulatory Commission (NRC) is granting an exemption to allow a departure from the certification information of Tier 1 of the generic design control document (DCD) and issuing License Amendment No. 12 to Combined Licenses (COL) NPF-93 and NPF-94. The COLs were issued to South Carolina Electric and Gas (SCE&G) and South Carolina Public Service Authority (Santee Cooper) (the licensee), for construction and operation of the Virgil C. Summer Nuclear Station (VCSNS), Units 2 and 3 located in Fairfield County, South Carolina. The amendment consists of changes to the updated final safety analysis report (UFSAR) for VCSNS Units 2 and 3 (including the plant-specific Tier 1 Table 3.3-1 and Figure 3.3-11B) and the corresponding Table 3.3- 1 and Figure 3.3-11B of Appendix C to the Facility COLs. The granting of the exemption allows the changes to Tier 1 information as specified in the license amendment request (LAR). Because the acceptability of the exemption was determined in part by the acceptability of the amendment, the exemption and amendment are being issued concurrently.
License Renewal Application for Sequoyah Nuclear Plant, Units 1 and 2
The U.S. Nuclear Regulatory Commission (NRC) is issuing for public comment a draft plant-specific supplement 53 to the Generic Environmental Impact Statement (GEIS) for License Renewal of Nuclear Plants, NUREG-1437, regarding the renewal of operating license DPR-77 and DPR-79 for an additional 20 years of operation for Sequoyah Nuclear Plant (SQN), Units 1 and 2. SQN is located in Soddy-Daisy, Tennessee. Possible alternatives to the proposed action (license renewal) include no action and reasonable alternative energy sources. The NRC staff plans to hold two public meetings during the public comment period to present an overview of the draft plant- specific supplement to the GEIS and to accept public comments on the document.
This site is protected by reCAPTCHA and the Google
Privacy Policy and
Terms of Service apply.