Nuclear Regulatory Commission September 9, 2013 – Federal Register Recent Federal Regulation Documents

Seismic Instrumentation for Nuclear Power Plants
Document Number: 2013-21848
Type: Notice
Date: 2013-09-09
Agency: Nuclear Regulatory Commission, Agencies and Commissions
The U.S. Nuclear Regulatory Commission (NRC) seeks public comments on the proposed revisions to the following section in Chapter 3, ``Design of Structures, Components, Equipment, and Systems'' and soliciting public comment on NUREG-0800, ``Standard Review Plan for the Review of Safety Analysis Reports for Nuclear Power Plants: LWR Edition,'' Section 3.7.4, ``Seismic Instrumentation.''
Ultimate Heat Sink for Nuclear Power Plants; Draft Regulatory Guide
Document Number: 2013-21847
Type: Notice
Date: 2013-09-09
Agency: Nuclear Regulatory Commission, Agencies and Commissions
The U.S. Nuclear Regulatory Commission (NRC) is issuing for public comment draft regulatory guide (DG), DG-1275, ``Ultimate Heat Sink for Nuclear Power Plants.'' This regulatory guide (RG) describes methods and procedures acceptable to the NRC staff that nuclear power plant facility licensees and applicants may use to implement general design criteria (GDC) that are applicable to the ultimate heat sink (UHS) features of plant systems.
Revision of Fee Schedules; Fee Recovery for Fiscal Year 2013; Correction
Document Number: 2013-21796
Type: Rule
Date: 2013-09-09
Agency: Nuclear Regulatory Commission, Agencies and Commissions
The U.S. Nuclear Regulatory Commission (NRC) published a final rule in the Federal Register on July 1, 2013 (78 FR 39461), amending the licensing, inspection, and annual fees charged to its applicants and licensees. The final rule inadvertently removed from a fee category description the word ``one,'' which is necessary to indicate the number of government-to-government consents included in this fee category. This document corrects the error.
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.