Nuclear Regulatory Commission December 7, 2012 – Federal Register Recent Federal Regulation Documents
Results 1 - 8 of 8
Standard Review Plan for Review of Fuel Cycle Facility License Applications
The U.S. Nuclear Regulatory Commission (NRC) is planning to revise NUREG-1520, Revision 1, ``Standard Review Plan (SRP) for the Review of a License Application for a Fuel Cycle Facility.'' The staff proposes to revise NUREG-1520 to provide guidance and further clarify several technical areas. In addition to revising NUREG-1520, the staff is also planning to issue Interim Staff Guidance (ISG) to provide guidance on Integrated Safety Analysis (ISA) implementation issues consistent with the direction in Staff Requirements Memorandum (SRM) SECY-12-0091, ``Completeness and Quality of Integrated Safety Analysis,'' dated October 9, 2012, which is also available in Agencywide Documents Access and Management System (ADAMS) under Accession No. ML12284A033. The NRC staff is seeking to engage stakeholders during the early stages of the SRP revision process by soliciting comments on which SRP areas should be revised and which topics should be addressed in ISGs.
Japan Lessons-Learned Project Directorate Interim Staff Guidance JLD-ISG-2012-05; Performance of an Integrated Assessment for External Flooding
The U.S. Nuclear Regulatory Commission (NRC) is issuing the Final Japan Lessons-Learned Project Directorate Interim Staff Guidance (JLD-ISG), JLD-ISG-2012-05, ``Performance of an Integrated Assessment'' (Agencywide Documents Access and Management System (ADAMS) Accession No. ML12311A214). This JLD-ISG provides guidance and clarification to assist nuclear power reactors applicants and licensees with performing an integrated assessment for external flooding in response to Enclosure 2 of a March 12, 2012, information request (ADAMS Accession No. ML12053A340).
Initial Test Programs for Water-Cooled Nuclear Power Plants
The U.S. Nuclear Regulatory Commission (NRC) is issuing for public comment draft regulatory guide (DG), DG-1259, ``Initial Test Programs for Water-Cooled Nuclear Power Plants.'' This guide describes the general scope and depth that the staff of the NRC considers acceptable for Initial Test Programs (ITPs) for light water cooled nuclear power plants.
Low-Level Waste Disposal
The U.S. Nuclear Regulatory Commission (NRC) is proposing to amend its regulations that govern low-level radioactive waste (LLRW) disposal facilities to require new and revised site-specific analyses and to permit the development of criteria for waste acceptance based on the results of these analyses. These amendments will ensure that waste streams that are significantly different in terms of radiological characteristics (e.g., half-life) from those considered in the technical basis for the current regulations can be disposed of safely and meet the performance objectives for land disposal of LLRW. These amendments will also increase the use of site-specific information to ensure that public health and safety would continue to be protected. The NRC is publishing a second version of preliminary rule language and has revised the regulatory basis document that will support this rulemaking. NRC is taking this action to inform interested stakeholders of the current status of the NRC's activities and to solicit public comments on the preliminary rule language. The regulatory basis document is being made available to inform stakeholder comments on the preliminary rule language. The NRC is not requesting comments on the regulatory basis.