Preoperational Testing of Onsite Electric Power Systems To Verify Proper Load Group Assignments, Electrical Separation, and Redundancy
The U.S. Nuclear Regulatory Commission (NRC or the Commission) is issuing for public comment draft regulatory guide (DG), DG-1294, ``Preoperational Testing of On-Site Electric Power Systems to Verify Proper Load Group Assignments, Electrical Separation, and Redundancy.'' DG-1294 is proposed Revision 1 of RG 1.41, dated March 1973. This revision expands the scope of the guide to encompass preoperational testing of electrical power systems used to meet current Station Blackout regulations, time requirements for startup and alignment of emergency power sources, and testing requirements for facilities licensed under 10 CFR Part 52.
Supplemental Environmental Impact Statement for Proposed Dewey-Burdock In-Situ Uranium Recovery Project in Custer and Fall River Counties, SD
The U.S. Nuclear Regulatory Commission (NRC) is issuing for public comment a draft Supplemental Environmental Impact Statement (Draft SEIS) for the Dewey-Burdock In-Situ Uranium Recovery (ISR) Project in Custer and Fall River Counties, South Dakota. The Draft SEIS is Supplement 4 to NUREG-1910, ``Generic Environmental Impact Statement for In-Situ Leach Uranium Milling Facilities,'' May 2009. By letter dated August 10, 2009, Powertech USA, Inc. (Powertech) submitted an application to the NRC for a new source materials license for the Dewey-Burdock ISR Project. Powertech is proposing to recover uranium from the Dewey-Burdock Project site using an in-situ recovery process.