Nuclear Regulatory Commission June 29, 2012 – Federal Register Recent Federal Regulation Documents
Results 1 - 4 of 4
Non-Power Reactor License Renewal
The U.S. Nuclear Regulatory Commission (NRC or the Commission) is making available a preliminary draft regulatory basis for a proposed rulemaking that would amend the NRC's regulations concerning the license renewal requirements for non-power reactors. This contemplated rulemaking would also make conforming changes to address technical issues in existing non-power reactor regulations. The NRC is seeking input from the public, licensees, certificate holders, and other stakeholders on the preliminary draft regulatory basis.
An Approach for Probabilistic Risk Assessment in Risk-Informed Decisions on Plant-Specific Changes to the Licensing Basis
On May 17, 2012 (77 FR 29391), the U.S. Nuclear Regulatory Commission (NRC or the Commission) issued for public comment four (4) draft regulatory guides (DGs), DG-1285, ``An Approach for Probabilistic Risk Assessment in Risk-Informed Decisions on Plant-Specific Changes to the Licensing Basis,'' (proposed Revision 3 of Regulatory Guide [RG] 1.174); DG-1286, ``An Approach for Plant-Specific, Risk-Informed Decisionmaking: Inservice Testing,'' (proposed Revision 1 of RG 1.175); DG 1287, ``An Approach for Plant-Specific, Risk-Informed Decisionmaking: Technical Specifications'' (proposed Revision 2 of RG 1.177); and DG-1288, ``An Approach for Plant-Specific Risk-Informed Decisionmaking for Inservice Inspection of Piping'' (proposed Revision 2 of RG 1.178) in the Federal Register for a 30 day public comment period. The NRC is extending the public comment period for these DGs from June 29, 2012 to August 13, 2012. These guides describe methods the NRC staff considers acceptable for plant-specific, risk-informed decisionmaking on specific licensee activities.
Design, Inspection, and Testing Criteria for Air Filtration and Adsorption Units of Normal Atmosphere Cleanup Systems in Light-Water-Cooled Nuclear Power Plants
The U.S. Nuclear Regulatory Commission (NRC or the Commission) is issuing for public comment draft regulatory guide (DG), DG-1280, ``Design, Inspection, and Testing Criteria for Air Filtration and Adsorption Units of Normal Atmosphere Cleanup Systems in Light-Water- Cooled Nuclear Power Plants.'' This guide describes a method for design, inspection, and testing of normal atmosphere cleanup systems for controlling releases of airborne radioactive materials to the environment during normal operations, including anticipated operational occurrences. This guide applies to all types of nuclear power plants that use water as the primary means of cooling.
This site is protected by reCAPTCHA and the Google
Privacy Policy and
Terms of Service apply.